X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284291111020

Well Details

Well ID: 0284291111020
Loading map...
Location: 02/11-11-028-29W4/0
Location Alias: 02/11-11-28-29 W4M
Location Alias 2: 02/11-11-028-29 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 29
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER 102 CROSSE 11-11-28-29
Operator Name: Ember Resources Inc.
License Number: 0435947
License Date: 2011-08-11
License Status: Issued
Spud Date: 2011-11-02
Final Drill Date: 2011-11-04
Well Total Depth: 1501.00 m
Surface Hole Latitude: 51.378485
Surface Hole Longitude: -113.976516

For data sources see[1][2]

Well History

Date Event
2011-08-11 Obtained License
2011-11-02 Direction Drilling Operation Performed - Deviate
2011-11-02 Surface Casing Operation Performed
2011-11-04 Finished Drilling
2011-11-04 Production Casing Operation Performed
2011-11-04 Well Mode changed to Drilled and Cased
2011-11-05 Rig Released
2011-11-15 Well Log Performed
2011-12-06 Perforation Treatment Performed - Jet Perforation
2011-12-14 Perforation Treatment Performed - Fractured
2012-02-16 Well Began Production
2012-02-16 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-02 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-06 Perforation 593.60 594.10 13
2011-12-06 Perforation 769.70 770.20 13
2011-12-06 Perforation 770.80 771.30 13
2011-12-06 Perforation 772.80 774.30 13
2011-12-06 Perforation 774.60 775.10 13
2011-12-06 Perforation 775.30 775.80 13
2011-12-06 Perforation 779.00 779.50 13
2011-12-06 Perforation 781.50 782.50 13
2011-12-06 Perforation 783.10 784.10 13
2011-12-06 Perforation 848.10 848.60 13
2011-12-06 Perforation 892.00 895.00 13
2011-12-06 Perforation 615.90 616.90 13
2011-12-06 Perforation 912.60 913.60 13
2011-12-06 Perforation 957.00 960.00 13
2011-12-06 Perforation 978.90 979.40 13
2011-12-06 Perforation 998.70 1000.20 13
2011-12-06 Perforation 1001.70 1002.20 13
2011-12-06 Perforation 1011.50 1013.00 13
2011-12-06 Perforation 1019.60 1020.10 13
2011-12-06 Perforation 1026.10 1026.60 13
2011-12-06 Perforation 1042.00 1045.00 13
2011-12-06 Perforation 1049.30 1051.30 13
2011-12-06 Perforation 625.80 626.30 13
2011-12-06 Perforation 1053.80 1055.80 13
2011-12-06 Perforation 1056.90 1057.40 13
2011-12-06 Perforation 1067.60 1068.10 13
2011-12-06 Perforation 1069.10 1070.10 13
2011-12-06 Perforation 1070.70 1071.20 13
2011-12-06 Perforation 1072.50 1073.00 13
2011-12-06 Perforation 1074.00 1074.50 13
2011-12-06 Perforation 1086.20 1086.70 13
2011-12-06 Perforation 1101.80 1102.30 13
2011-12-14 Fracture 593.60 1102.30 0
2011-12-06 Perforation 676.40 676.90 13
2011-12-06 Perforation 697.50 698.00 13
2011-12-06 Perforation 750.10 750.60 13
2011-12-06 Perforation 751.30 752.30 13
2011-12-06 Perforation 753.30 753.80 13
2011-12-06 Perforation 768.50 769.50 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7679 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8747 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8669 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8660 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[6]

References