X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284291105020

Well Details

Well ID: 0284291105020
Loading map...
Location: 02/05-11-028-29W4/0
Location Alias: 02/05-11-28-29 W4M
Location Alias 2: 02/05-11-028-29 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 29
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER 102 CROSSE 5-11-28-29
Operator Name: Ember Resources Inc.
License Number: 0435945
License Date: 2011-08-11
License Status: Issued
Spud Date: 2011-10-29
Final Drill Date: 2011-11-01
Well Total Depth: 1566.00 m
Surface Hole Latitude: 51.378563
Surface Hole Longitude: -113.976780

For data sources see[1][2]

Well History

Date Event
2011-08-11 Obtained License
2011-10-29 Direction Drilling Operation Performed - Deviate
2011-10-30 Surface Casing Operation Performed
2011-11-01 Finished Drilling
2011-11-01 Production Casing Operation Performed
2011-11-01 Well Mode changed to Drilled and Cased
2011-11-02 Rig Released
2011-11-15 Well Log Performed
2011-12-07 Perforation Treatment Performed - Jet Perforation
2011-12-14 Perforation Treatment Performed - Fractured
2012-02-16 Well Began Production
2012-02-16 Well Fluid changed to Coalbed Methane-Coals and Other
2012-02-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-29 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-12-07 Perforation 621.40 621.90 13
2011-12-07 Perforation 790.10 790.60 13
2011-12-07 Perforation 800.50 801.00 13
2011-12-07 Perforation 802.70 803.70 13
2011-12-07 Perforation 813.90 814.40 13
2011-12-07 Perforation 815.00 816.00 13
2011-12-07 Perforation 848.00 848.50 13
2011-12-07 Perforation 867.90 868.40 13
2011-12-07 Perforation 886.10 886.60 13
2011-12-07 Perforation 933.00 936.00 13
2011-12-07 Perforation 946.00 949.00 13
2011-12-07 Perforation 624.80 625.80 13
2011-12-07 Perforation 954.90 955.40 13
2011-12-07 Perforation 1003.00 1003.50 13
2011-12-07 Perforation 1023.50 1024.00 13
2011-12-07 Perforation 1041.30 1042.80 13
2011-12-07 Perforation 1055.70 1057.70 13
2011-12-07 Perforation 1072.60 1073.10 13
2011-12-07 Perforation 1080.00 1083.00 13
2011-12-07 Perforation 1094.60 1096.60 13
2011-12-07 Perforation 1099.00 1099.50 13
2011-12-07 Perforation 1099.90 1101.90 13
2011-12-07 Perforation 637.20 637.70 13
2011-12-07 Perforation 1103.40 1103.90 13
2011-12-07 Perforation 1116.70 1117.20 13
2011-12-07 Perforation 1118.20 1118.70 13
2011-12-07 Perforation 1121.10 1121.60 13
2011-12-07 Perforation 1122.30 1122.80 13
2011-12-07 Perforation 1142.80 1143.30 13
2011-12-07 Perforation 1146.50 1147.00 13
2011-12-07 Perforation 1147.40 1147.90 13
2011-12-14 Fracture 621.40 1147.90 0
2011-12-07 Perforation 644.40 645.90 13
2011-12-07 Perforation 653.90 654.40 13
2011-12-07 Perforation 662.10 662.60 13
2011-12-07 Perforation 706.80 707.30 13
2011-12-07 Perforation 783.10 784.60 13
2011-12-07 Perforation 785.70 786.20 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 7679 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8747 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8760 0.0 0.0 0.0
2017 8669 0.0 0.0 0.0
2018 8400 0.0 0.0 0.0
2019 8660 0.0 0.0 0.0
2020 2178 0.0 0.0 0.0

For data sources see[6]

References