X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284282110000

Well Details

Well ID: 0284282110000
Loading map...
Location: 00/10-21-028-28W4/0
Location Alias: 00/10-21-28-28 W4M
Location Alias 2: 00/10-21-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 21
County/Municipality: Rocky View County
Well Name: EMC HZ CROSSE 10-21-28-28
Operator Name: ExxonMobil Canada Energy
License Number: 0273662
License Date: 2002-09-10
License Status: RecCertified
Spud Date: 2002-10-09
Final Drill Date: 2002-11-09
Well Total Depth: 2909.00 m
Surface Hole Latitude: 51.401959
Surface Hole Longitude: -113.882621

For data sources see[1][2]

Well History

Date Event
2002-09-10 Obtained License
2002-10-11 Surface Casing Operation Performed
2002-10-24 Well Log Performed
2002-10-27 Production Casing Operation Performed
2002-10-29 Direction Drilling Operation Performed - Horizontal
2002-11-01 Well Log Performed
2002-11-02 Well Log Performed
2002-11-09 Finished Drilling
2002-11-09 Perforation Treatment Performed - Open-Hole Completion
2002-11-09 Well Log Performed
2002-11-10 Well Log Performed
2002-11-12 Rig Released
2002-11-12 Well Mode changed to Drilled and Cased
2003-09-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-06 Plug Back Performed
2003-09-06 Well Mode changed to Abandoned Zone
2003-09-07 Well Log Performed
2003-09-08 Perforation Treatment Performed - Jet Perforation
2003-09-08 Well Log Performed
2003-09-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-09-15 Perforation Treatment Performed - Remedial Casing
2004-05-26 Well Abandoned
2004-05-26 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2002-10-29 2368.80 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-11-09 Open Hole/Barefoot Completion 2271.00 2909.00 0
2003-09-06 Packing Device Capped w/Cement 2200.00 2254.40 0
2003-09-08 Perforation 399.00 401.00 17
2003-09-15 Remedial Casing Cementing 399.00 401.00 0
2003-09-15 Packing Device Capped w/Cement 320.90 402.00 0

For data sources see[5]



References