If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284282010000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.41031,"lon":-113.907316,"icon":""}]} |
Location: 00/10-20-028-28W4/0 | |
Location Alias: 00/10-20-28-28 W4M | |
Location Alias 2: 00/10-20-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 20 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 10-20-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0410971 | |
License Date: 2009-06-16 | |
License Status: Issued | |
Spud Date: 2009-12-21 | |
Final Drill Date: 2010-01-22 | |
Well Total Depth: 1320.00 m | |
Surface Hole Latitude: 51.410310 | |
Surface Hole Longitude: -113.907316 |
Date | Event |
---|---|
2009-06-16 | Obtained License |
2009-12-21 | Surface Casing Operation Performed |
2010-01-22 | Finished Drilling |
2010-01-22 | Production Casing Operation Performed |
2010-01-22 | Rig Released |
2010-01-22 | Well Mode changed to Drilled and Cased |
2010-01-27 | Well Log Performed |
2010-02-27 | Perforation Treatment Performed - Jet Perforation |
2010-03-12 | Well Fluid changed to Gas |
2010-03-12 | Well Mode changed to Testing |
2010-08-26 | Perforation Treatment Performed - Fractured |
2010-09-06 | Perforation Treatment Performed - Jet Perforation |
2010-09-10 | Perforation Treatment Performed - Fractured |
2010-09-11 | Perforation Treatment Performed - Fractured |
2010-09-29 | Well Began Production |
2010-09-29 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-09-29 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-02-27 | Perforation | 1197.00 | 1200.00 | 13 |
2010-08-26 | Fracture | 1066.00 | 1068.00 | 0 |
2010-08-26 | Fracture | 1044.00 | 1046.00 | 0 |
2010-08-26 | Fracture | 968.00 | 971.00 | 0 |
2010-09-06 | Perforation | 645.00 | 648.00 | 13 |
2010-09-06 | Perforation | 588.00 | 589.00 | 13 |
2010-09-06 | Perforation | 553.00 | 555.00 | 13 |
2010-09-06 | Perforation | 653.00 | 655.00 | 13 |
2010-09-06 | Perforation | 724.00 | 726.00 | 13 |
2010-09-06 | Perforation | 715.00 | 718.00 | 13 |
2010-09-06 | Perforation | 711.00 | 713.00 | 13 |
2010-02-27 | Perforation | 1192.00 | 1193.00 | 13 |
2010-09-06 | Perforation | 466.00 | 469.00 | 13 |
2010-09-06 | Perforation | 457.00 | 460.00 | 13 |
2010-09-06 | Perforation | 413.00 | 416.00 | 13 |
2010-09-06 | Perforation | 487.00 | 490.00 | 13 |
2010-09-06 | Perforation | 541.00 | 544.00 | 13 |
2010-09-06 | Perforation | 533.00 | 536.00 | 13 |
2010-09-06 | Perforation | 504.00 | 506.00 | 13 |
2010-09-06 | Perforation | 886.20 | 886.70 | 13 |
2010-09-06 | Perforation | 883.80 | 884.80 | 13 |
2010-09-06 | Perforation | 916.80 | 917.30 | 13 |
2010-02-27 | Perforation | 1174.00 | 1176.00 | 13 |
2010-09-06 | Perforation | 912.50 | 913.00 | 13 |
2010-09-06 | Perforation | 904.10 | 904.60 | 13 |
2010-09-06 | Perforation | 899.80 | 900.30 | 13 |
2010-09-06 | Perforation | 843.80 | 844.80 | 13 |
2010-09-06 | Perforation | 749.00 | 749.50 | 13 |
2010-09-06 | Perforation | 744.20 | 744.70 | 13 |
2010-09-06 | Perforation | 874.40 | 874.90 | 13 |
2010-09-06 | Perforation | 836.60 | 837.10 | 13 |
2010-09-06 | Perforation | 828.30 | 829.30 | 13 |
2010-09-06 | Perforation | 806.60 | 807.10 | 13 |
2010-02-27 | Perforation | 1066.00 | 1068.00 | 13 |
2010-09-10 | Fracture | 413.00 | 726.00 | 0 |
2010-09-11 | Fracture | 744.20 | 917.30 | 0 |
2010-02-27 | Perforation | 1044.00 | 1046.00 | 13 |
2010-02-27 | Perforation | 968.00 | 971.00 | 13 |
2010-08-26 | Fracture | 1197.00 | 1200.00 | 0 |
2010-08-26 | Fracture | 1192.00 | 1193.00 | 0 |
2010-08-26 | Fracture | 1174.00 | 1176.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 2242 | 0.0 | 0.0 | 0.0 |
2011 | 8755 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8747 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8760 | 0.0 | 0.0 | 0.0 |
2017 | 8680 | 0.0 | 0.0 | 0.0 |
2018 | 8400 | 0.0 | 0.0 | 0.0 |
2019 | 8660 | 0.0 | 0.0 | 0.0 |
2020 | 2178 | 0.0 | 0.0 | 0.0 |
For data sources see[5]