If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284281113000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.383296,"lon":-113.843253,"icon":""}]} |
Location: 00/13-11-028-28W4/0 | |
Location Alias: 00/13-11-28-28 W4M | |
Location Alias 2: 00/13-11-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 13-11-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438042 | |
License Date: 2011-10-26 | |
License Status: Issued | |
Spud Date: 2011-12-11 | |
Final Drill Date: 2011-12-13 | |
Well Total Depth: 1306.00 m | |
Surface Hole Latitude: 51.383296 | |
Surface Hole Longitude: -113.843253 |
Date | Event |
---|---|
2011-10-26 | Obtained License |
2011-12-11 | Direction Drilling Operation Performed - Deviate |
2011-12-12 | Surface Casing Operation Performed |
2011-12-13 | Finished Drilling |
2011-12-13 | Production Casing Operation Performed |
2011-12-13 | Well Mode changed to Drilled and Cased |
2011-12-14 | Rig Released |
2011-12-19 | Well Log Performed |
2012-01-19 | Perforation Treatment Performed - Jet Perforation |
2012-02-09 | Perforation Treatment Performed - Fractured |
2012-02-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-11 | Well Mode changed to Testing |
2012-02-14 | Perforation Treatment Performed - Jet Perforation |
2012-02-20 | Perforation Treatment Performed - Fractured |
2012-05-11 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-05-11 | Well Mode changed to Test Completed |
2012-06-03 | Well Began Production |
2012-06-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-06-03 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-11 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-19 | Perforation | 750.00 | 753.00 | 13 |
2012-02-14 | Perforation | 354.40 | 354.90 | 13 |
2012-02-14 | Perforation | 432.00 | 432.50 | 13 |
2012-02-14 | Perforation | 433.20 | 433.70 | 13 |
2012-02-14 | Perforation | 440.80 | 441.30 | 13 |
2012-02-14 | Perforation | 443.70 | 444.20 | 13 |
2012-02-14 | Perforation | 450.20 | 451.20 | 13 |
2012-02-14 | Perforation | 461.20 | 461.70 | 13 |
2012-02-14 | Perforation | 466.60 | 467.10 | 13 |
2012-02-14 | Perforation | 478.60 | 479.60 | 13 |
2012-02-14 | Perforation | 494.00 | 496.00 | 13 |
2012-01-19 | Perforation | 819.00 | 822.00 | 13 |
2012-02-14 | Perforation | 534.00 | 536.00 | 13 |
2012-02-14 | Perforation | 604.20 | 605.20 | 13 |
2012-02-14 | Perforation | 606.70 | 607.20 | 13 |
2012-02-14 | Perforation | 619.70 | 620.20 | 13 |
2012-02-14 | Perforation | 624.60 | 625.10 | 13 |
2012-02-14 | Perforation | 682.00 | 682.50 | 13 |
2012-02-14 | Perforation | 701.50 | 704.00 | 13 |
2012-02-14 | Perforation | 743.60 | 744.10 | 13 |
2012-02-14 | Perforation | 745.00 | 746.00 | 13 |
2012-02-14 | Perforation | 755.00 | 755.50 | 13 |
2012-01-19 | Perforation | 876.50 | 879.50 | 13 |
2012-02-14 | Perforation | 807.00 | 809.00 | 13 |
2012-02-14 | Perforation | 813.00 | 815.00 | 13 |
2012-02-14 | Perforation | 824.70 | 825.20 | 13 |
2012-02-14 | Perforation | 836.20 | 838.20 | 13 |
2012-02-14 | Perforation | 849.80 | 850.30 | 13 |
2012-02-14 | Perforation | 854.20 | 856.20 | 13 |
2012-02-14 | Perforation | 863.50 | 864.00 | 13 |
2012-02-14 | Perforation | 873.30 | 873.80 | 13 |
2012-02-14 | Perforation | 890.40 | 890.90 | 13 |
2012-02-14 | Perforation | 893.80 | 895.30 | 13 |
2012-02-09 | Fracture | 750.00 | 753.00 | 0 |
2012-02-14 | Perforation | 896.90 | 897.90 | 13 |
2012-02-14 | Perforation | 914.10 | 914.60 | 13 |
2012-02-14 | Perforation | 917.80 | 918.30 | 13 |
2012-02-14 | Perforation | 933.30 | 933.80 | 13 |
2012-02-14 | Perforation | 938.10 | 938.60 | 13 |
2012-02-14 | Perforation | 939.90 | 940.40 | 13 |
2012-02-20 | Fracture | 263.80 | 940.40 | 0 |
2012-02-09 | Fracture | 819.00 | 822.00 | 0 |
2012-02-09 | Fracture | 876.50 | 879.50 | 0 |
2012-02-14 | Perforation | 263.80 | 264.80 | 13 |
2012-02-14 | Perforation | 290.10 | 290.60 | 13 |
2012-02-14 | Perforation | 338.50 | 339.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5116 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8663 | 0.0 | 0.0 | 0.0 |
2017 | 8692 | 0.0 | 0.0 | 0.0 |
2018 | 8284 | 0.0 | 0.0 | 0.0 |
2019 | 8600 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[6]