X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284281109000

Well Details

Well ID: 0284281109000
Loading map...
Location: 00/09-11-028-28W4/0
Location Alias: 00/09-11-28-28 W4M
Location Alias 2: 00/09-11-028-28 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 28
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER CROSSE 9-11-28-28
Operator Name: Ember Resources Inc.
License Number: 0437688
License Date: 2011-10-16
License Status: Issued
Spud Date: 2011-11-25
Final Drill Date: 2011-11-27
Well Total Depth: 1306.00 m
Surface Hole Latitude: 51.383162
Surface Hole Longitude: -113.833967

For data sources see[1][2]

Well History

Date Event
2011-10-16 Obtained License
2011-11-25 Direction Drilling Operation Performed - Deviate
2011-11-26 Surface Casing Operation Performed
2011-11-27 Finished Drilling
2011-11-27 Production Casing Operation Performed
2011-11-27 Well Mode changed to Drilled and Cased
2011-11-28 Rig Released
2011-12-13 Well Log Performed
2012-01-14 Perforation Treatment Performed - Jet Perforation
2012-01-24 Perforation Treatment Performed - Fractured
2012-01-26 Well Fluid changed to Coalbed Methane-Coals and Other
2012-01-26 Well Mode changed to Testing
2012-06-03 Well Began Production
2012-06-03 Well Fluid changed to Coalbed Methane-Coals and Other
2012-06-03 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-11-25 0.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2012-01-14 Perforation 491.90 492.40 13
2012-01-14 Perforation 669.40 670.40 13
2012-01-14 Perforation 714.80 715.30 13
2012-01-14 Perforation 720.90 721.40 13
2012-01-14 Perforation 736.00 738.00 13
2012-01-14 Perforation 773.50 775.50 13
2012-01-14 Perforation 782.50 783.00 13
2012-01-14 Perforation 783.80 784.30 13
2012-01-14 Perforation 791.70 792.70 13
2012-01-14 Perforation 811.50 813.50 13
2012-01-14 Perforation 843.00 846.00 13
2012-01-14 Perforation 498.10 498.60 13
2012-01-14 Perforation 851.50 852.00 13
2012-01-14 Perforation 865.60 867.10 13
2012-01-14 Perforation 882.00 884.00 13
2012-01-14 Perforation 891.50 892.00 13
2012-01-14 Perforation 897.20 897.70 13
2012-01-14 Perforation 913.60 914.10 13
2012-01-14 Perforation 915.50 916.50 13
2012-01-14 Perforation 919.10 920.10 13
2012-01-14 Perforation 935.10 936.10 13
2012-01-14 Perforation 937.90 938.90 13
2012-01-14 Perforation 527.10 528.60 13
2012-01-14 Perforation 953.50 954.00 13
2012-01-14 Perforation 958.30 958.80 13
2012-01-24 Fracture 491.90 958.80 0
2012-01-14 Perforation 535.30 535.80 13
2012-01-14 Perforation 604.00 607.00 13
2012-01-14 Perforation 646.00 646.50 13
2012-01-14 Perforation 648.00 648.50 13
2012-01-14 Perforation 658.00 661.00 13
2012-01-14 Perforation 663.50 664.00 13

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2012 5160 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8717 0.0 0.0 0.0
2015 8742 0.0 0.0 0.0
2016 8663 0.0 0.0 0.0
2017 8692 0.0 0.0 0.0
2018 8284 0.0 0.0 0.0
2019 8600 0.0 0.0 0.0
2020 2165 0.0 0.0 0.0

For data sources see[6]

References