If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284281104000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.375105,"lon":-113.840977,"icon":""}]} |
Location: 00/04-11-028-28W4/0 | |
Location Alias: 00/04-11-28-28 W4M | |
Location Alias 2: 00/04-11-028-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 28 | |
Section: 11 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSSE 4-11-28-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0438271 | |
License Date: 2011-11-01 | |
License Status: Issued | |
Spud Date: 2011-12-31 | |
Final Drill Date: 2012-01-02 | |
Well Total Depth: 1257.00 m | |
Surface Hole Latitude: 51.375105 | |
Surface Hole Longitude: -113.840977 |
Date | Event |
---|---|
2011-11-01 | Obtained License |
2011-12-31 | Direction Drilling Operation Performed - Deviate |
2012-01-01 | Surface Casing Operation Performed |
2012-01-02 | Finished Drilling |
2012-01-02 | Production Casing Operation Performed |
2012-01-02 | Well Log Performed |
2012-01-02 | Well Mode changed to Drilled and Cased |
2012-01-03 | Rig Released |
2012-01-10 | Well Log Performed |
2012-01-20 | Perforation Treatment Performed - Jet Perforation |
2012-01-31 | Perforation Treatment Performed - Jet Perforation |
2012-02-06 | Perforation Treatment Performed - Fractured |
2012-02-07 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-02-07 | Well Mode changed to Testing |
2012-06-01 | Well Began Production |
2012-06-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2012-06-01 | Well Mode changed to Flowing |
For data sources see[3]
Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
---|---|---|---|---|
2011-12-31 | Precision Drilling Corporation | 239 | N/A | Drill To LD |
For data sources see[4]
Start Date | Depth (m) | Reason |
---|---|---|
2011-12-31 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[5]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2012-01-20 | Perforation | 828.90 | 829.40 | 13 |
2012-01-31 | Perforation | 413.60 | 415.10 | 13 |
2012-01-31 | Perforation | 423.60 | 424.10 | 13 |
2012-01-31 | Perforation | 429.40 | 429.90 | 13 |
2012-01-31 | Perforation | 436.70 | 437.20 | 13 |
2012-01-31 | Perforation | 439.10 | 439.60 | 13 |
2012-01-31 | Perforation | 454.50 | 455.50 | 13 |
2012-01-31 | Perforation | 463.70 | 464.20 | 13 |
2012-01-31 | Perforation | 474.00 | 477.00 | 13 |
2012-01-31 | Perforation | 564.40 | 564.90 | 13 |
2012-01-31 | Perforation | 574.60 | 575.10 | 13 |
2012-01-20 | Perforation | 834.60 | 835.10 | 13 |
2012-01-31 | Perforation | 578.30 | 578.80 | 13 |
2012-01-31 | Perforation | 591.50 | 592.00 | 13 |
2012-01-31 | Perforation | 603.50 | 606.00 | 13 |
2012-01-31 | Perforation | 680.50 | 683.00 | 13 |
2012-01-31 | Perforation | 713.70 | 714.20 | 13 |
2012-01-31 | Perforation | 722.10 | 723.10 | 13 |
2012-01-31 | Perforation | 727.50 | 728.50 | 13 |
2012-01-31 | Perforation | 730.60 | 731.10 | 13 |
2012-01-31 | Perforation | 743.00 | 745.00 | 13 |
2012-01-31 | Perforation | 786.40 | 787.40 | 13 |
2012-01-20 | Perforation | 854.70 | 855.70 | 13 |
2012-01-31 | Perforation | 790.80 | 791.30 | 13 |
2012-01-31 | Perforation | 802.10 | 803.10 | 13 |
2012-01-31 | Perforation | 819.70 | 821.70 | 13 |
2012-02-06 | Fracture | 413.60 | 902.90 | 0 |
2012-01-20 | Perforation | 857.50 | 858.50 | 13 |
2012-01-20 | Perforation | 874.30 | 874.80 | 13 |
2012-01-20 | Perforation | 877.80 | 878.80 | 13 |
2012-01-20 | Perforation | 895.10 | 895.60 | 13 |
2012-01-20 | Perforation | 901.00 | 901.50 | 13 |
2012-01-20 | Perforation | 902.40 | 902.90 | 13 |
For data sources see[6]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2012 | 5256 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8717 | 0.0 | 0.0 | 0.0 |
2015 | 8742 | 0.0 | 0.0 | 0.0 |
2016 | 8663 | 0.0 | 0.0 | 0.0 |
2017 | 8692 | 0.0 | 0.0 | 0.0 |
2018 | 8283 | 0.0 | 0.0 | 0.0 |
2019 | 8600 | 0.0 | 0.0 | 0.0 |
2020 | 2165 | 0.0 | 0.0 | 0.0 |
For data sources see[7]