| Well ID: 0284273610022 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.440377,"lon":-113.662741,"icon":""}]} |
| Location: 02/10-36-028-27W4/2 | |
| Location Alias: 02/10-36-28-27 W4M | |
| Location Alias 2: 02/10-36-028-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 36 | |
| County/Municipality: Rocky View County | |
| Well Name: NAL ENTICE 3-36-28-27 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0294135 | |
| License Date: 2003-09-30 | |
| License Status: Suspension | |
| Spud Date: 2003-10-22 | |
| Final Drill Date: 2003-11-26 | |
| Well Total Depth: 2502.00 m | |
| Surface Hole Latitude: 51.440377 | |
| Surface Hole Longitude: -113.662741 |
| Date | Event |
|---|---|
| 2003-09-30 | Obtained License |
| 2003-10-23 | Surface Casing Operation Performed |
| 2003-10-29 | Direction Drilling Operation Performed - Horizontal |
| 2003-11-06 | Intermediate Casing Operation Performed |
| 2003-11-18 | Direction Drilling Operation Performed - Horizontal |
| 2003-11-26 | Finished Drilling |
| 2003-11-26 | Well Structure changed to Drain |
| 2003-11-27 | Perforation Treatment Performed - Open-Hole Completion |
| 2003-11-27 | Rig Released |
| 2003-12-28 | Perforation Treatment Performed - Acid Squeeze - Press Used |
| 2017-02-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2017-02-06 | Plug Back Performed |
| 2017-02-06 | Well Mode changed to Abandoned Zone |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2003-10-29 | 1747.50 | Horizontal |
| 2003-11-18 | 2153.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2003-11-27 | Open Hole/Barefoot Completion | 2108.50 | 2502.00 | 0 |
| 2003-12-28 | Acid Treatment | 2108.50 | 2502.00 | 0 |
| 2017-02-06 | Packing Device Capped w/Cement | 1822.00 | 2095.00 | 0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-02-12 | No Incident Encountered | 0.00 | 0.00 |