X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284263501002

Well Details

Well ID: 0284263501002
Loading map...
Location: 00/01-35-028-26W4/2
Location Alias: 00/01-35-28-26 W4M
Location Alias 2: 00/01-35-028-26 W4/02
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 26
Section: 35
County/Municipality: Rocky View County
Well Name: CPC RESOURCES ENTICE 1-35-28-26
Operator Name: Lynx Energy ULC
License Number: 0236492
License Date: 2000-04-26
License Status: Issued
Spud Date: 2000-09-16
Final Drill Date: 2000-09-24
Well Total Depth: 1830.00 m
Surface Hole Latitude: 51.431334
Surface Hole Longitude: -113.547690

For data sources see[1][2]

Well History

Date Event
2000-04-26 Obtained License
2000-09-18 Surface Casing Operation Performed
2000-09-24 Finished Drilling
2000-09-24 Well Log Performed
2000-09-24 Well Mode changed to Drilled and Cased
2000-09-25 Production Casing Operation Performed
2000-09-26 Rig Released
2000-09-29 Well Log Performed
2000-10-09 Perforation Treatment Performed - Jet Perforation
2001-01-07 Perforation Treatment Performed - Fractured
2001-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-01-22 Plug Back Performed
2001-01-24 Perforation Treatment Performed - Jet Perforation
2001-01-24 Well Mode changed to Drilled and Cased
2001-05-06 Perforation Treatment Performed - Fractured
2001-06-01 Well Began Production
2001-06-01 Well Fluid changed to Gas
2001-06-01 Well Mode changed to Flowing
2001-07-27 Perforation Treatment Performed - Jet Perforation
2001-07-28 Well Log Performed
2001-09-01 Well Fluid changed to Gas
2001-09-01 Well Mode changed to Suspended
2003-04-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-04-21 Perforation Treatment Performed - Bridge Plug No Cement Required
2003-04-21 Plug Back Performed
2003-04-21 Well Fluid changed to Gas
2003-04-21 Well Mode changed to Abandoned Zone
2003-04-22 Perforation Treatment Performed - Jet Perforation
2003-05-18 Perforation Treatment Performed - Jet Perforation
2003-05-20 Perforation Treatment Performed - Jet Perforation
2003-05-22 Perforation Treatment Performed - Jet Perforation
2003-05-24 Perforation Treatment Performed - Jet Perforation
2003-05-26 Perforation Treatment Performed - Jet Perforation
2003-05-28 Perforation Treatment Performed - Jet Perforation
2004-01-22 Well Log Performed
2004-02-24 Well Log Performed
2004-03-12 Perforation Treatment Performed - Jet Perforation
2004-05-25 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-10-09 Perforation 1742.00 1744.00 20
2003-04-22 Perforation 881.00 883.00 7
2003-05-18 Perforation 737.50 740.50 7
2003-05-18 Perforation 725.00 727.00 7
2003-05-18 Perforation 701.00 704.00 7
2003-05-20 Perforation 651.00 654.00 7
2003-05-20 Perforation 616.50 619.50 7
2003-05-22 Perforation 558.00 561.00 7
2003-05-22 Perforation 543.00 546.00 7
2003-05-24 Perforation 457.00 459.00 7
2003-05-24 Perforation 445.00 447.00 7
2001-01-07 Fracture 1742.00 1744.00 0
2003-05-24 Perforation 442.00 444.00 7
2003-05-26 Perforation 396.00 398.00 7
2003-05-26 Perforation 385.00 387.00 7
2003-05-28 Perforation 348.00 351.00 7
2004-03-12 Perforation 658.00 659.00 7
2004-03-12 Perforation 648.00 649.00 7
2004-03-12 Perforation 644.00 645.00 7
2004-03-12 Perforation 632.50 635.50 7
2004-03-12 Perforation 625.00 627.00 7
2004-03-12 Perforation 614.20 615.20 7
2001-01-22 Packing Device Capped w/Cement 1720.00 1730.00 0
2004-03-12 Perforation 604.00 606.00 7
2004-03-12 Perforation 593.50 594.50 7
2004-03-12 Perforation 589.00 590.00 7
2004-03-12 Perforation 581.00 584.00 7
2004-03-12 Perforation 548.00 552.00 7
2004-03-12 Perforation 530.00 532.00 7
2004-03-12 Perforation 525.50 526.50 7
2004-05-25 Fracture 525.50 659.00 0
2001-01-24 Perforation 1561.00 1565.50 20
2001-05-06 Fracture 1561.00 1565.50 0
2001-07-27 Perforation 945.00 946.50 20
2003-04-21 Bridge Plug, No Cement 940.00 941.00 0
2003-04-21 Packing Device Capped w/Cement 1542.00 1550.00 0
2003-04-22 Perforation 889.00 891.00 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 1305 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-12-19 No Incident Encountered 0.00 0.00

For data sources see[6]

References