X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253501000

Well Details

Well ID: 0284253501000
Loading map...
Location: 00/01-35-028-25W4/0
Location Alias: 00/01-35-28-25 W4M
Location Alias 2: 00/01-35-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 35
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 1-35-28-25
Operator Name: Ember Resources Inc.
License Number: 0298058
License Date: 2003-12-05
License Status: Issued
Spud Date: 2003-12-17
Final Drill Date: 2003-12-17
Well Total Depth: 703.00 m
Surface Hole Latitude: 51.432697
Surface Hole Longitude: -113.409375

For data sources see[1][2]

Well History

Date Event
2003-12-05 Obtained License
2003-12-14 Surface Casing Operation Performed
2003-12-17 Finished Drilling
2003-12-17 Production Casing Operation Performed
2003-12-17 Well Mode changed to Drilled and Cased
2003-12-18 Rig Released
2004-01-10 Well Log Performed
2004-01-20 Perforation Treatment Performed - Jet Perforation
2004-02-15 Perforation Treatment Performed - Fractured
2004-02-19 Well Fluid changed to Gas
2004-02-19 Well Mode changed to Testing
2004-07-22 Well Began Production
2004-07-22 Well Fluid changed to Gas
2004-07-22 Well Mode changed to Flowing
2005-01-25 Perforation Treatment Performed - Jet Perforation
2005-01-30 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-20 Perforation 648.00 651.00 14
2005-01-25 Perforation 537.70 538.20 13
2005-01-25 Perforation 525.30 525.80 13
2005-01-25 Perforation 517.50 518.00 13
2005-01-25 Perforation 514.00 514.50 13
2005-01-25 Perforation 483.60 484.10 13
2005-01-25 Perforation 477.20 477.70 13
2005-01-25 Perforation 469.10 469.60 13
2005-01-25 Perforation 463.40 463.90 13
2005-01-25 Perforation 459.20 459.70 13
2005-01-25 Perforation 439.60 440.10 13
2004-02-15 Fracture 648.00 651.00 0
2005-01-25 Perforation 432.40 432.90 13
2005-01-25 Perforation 429.40 429.90 13
2005-01-25 Perforation 412.40 412.90 13
2005-01-25 Perforation 355.80 356.30 13
2005-01-25 Perforation 239.60 240.10 13
2005-01-25 Perforation 197.40 197.90 13
2005-01-25 Perforation 196.20 196.70 13
2005-01-25 Perforation 195.30 195.80 13
2005-01-25 Perforation 190.30 190.80 13
2005-01-30 Fracture 190.30 584.90 0
2005-01-25 Perforation 584.40 584.90 13
2005-01-25 Perforation 569.30 569.80 13
2005-01-25 Perforation 568.50 569.00 13
2005-01-25 Perforation 561.40 561.90 13
2005-01-25 Perforation 550.90 551.40 13
2005-01-25 Perforation 546.00 546.50 13
2005-01-25 Perforation 538.80 539.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3886 0.0 0.0 0.0
2005 2688 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8649 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8574 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References