X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253404000

Well Details

Well ID: 0284253404000
Loading map...
Location: 00/04-34-028-25W4/0
Location Alias: 00/04-34-28-25 W4M
Location Alias 2: 00/04-34-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 34
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 4-34-28-25
Operator Name: Ember Resources Inc.
License Number: 0298077
License Date: 2003-12-08
License Status: Issued
Spud Date: 2003-12-15
Final Drill Date: 2003-12-15
Well Total Depth: 703.00 m
Surface Hole Latitude: 51.433753
Surface Hole Longitude: -113.446021

For data sources see[1][2]

Well History

Date Event
2003-12-08 Obtained License
2003-12-13 Surface Casing Operation Performed
2003-12-15 Finished Drilling
2003-12-15 Production Casing Operation Performed
2003-12-15 Rig Released
2003-12-15 Well Mode changed to Drilled and Cased
2004-01-09 Well Log Performed
2004-02-14 Perforation Treatment Performed - Jet Perforation
2004-02-20 Perforation Treatment Performed - Fractured
2004-07-26 Well Began Production
2004-07-26 Well Fluid changed to Gas
2004-07-26 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-02-14 Perforation 597.10 597.70 13
2004-02-14 Perforation 546.20 546.80 13
2004-02-14 Perforation 540.10 540.70 13
2004-02-14 Perforation 531.60 532.20 13
2004-02-14 Perforation 524.70 525.30 13
2004-02-14 Perforation 523.30 523.90 13
2004-02-14 Perforation 497.50 498.10 13
2004-02-14 Perforation 493.60 494.20 13
2004-02-14 Perforation 486.40 487.00 13
2004-02-14 Perforation 481.30 481.90 13
2004-02-14 Perforation 474.50 475.10 13
2004-02-14 Perforation 593.40 594.00 13
2004-02-14 Perforation 470.50 471.10 13
2004-02-14 Perforation 463.40 464.00 13
2004-02-14 Perforation 445.10 445.70 13
2004-02-14 Perforation 439.10 439.70 13
2004-02-14 Perforation 436.30 436.90 13
2004-02-14 Perforation 435.20 435.80 13
2004-02-14 Perforation 424.30 424.90 13
2004-02-14 Perforation 422.00 422.60 13
2004-02-14 Perforation 370.40 371.00 13
2004-02-14 Perforation 319.60 320.20 13
2004-02-14 Perforation 591.70 592.30 13
2004-02-14 Perforation 308.00 308.60 13
2004-02-14 Perforation 247.40 248.00 13
2004-02-14 Perforation 204.30 204.90 13
2004-02-14 Perforation 201.90 202.50 13
2004-02-14 Perforation 201.30 201.90 13
2004-02-14 Perforation 197.30 197.90 13
2004-02-20 Fracture 197.30 597.70 0
2004-02-14 Perforation 590.30 590.90 13
2004-02-14 Perforation 579.90 580.50 13
2004-02-14 Perforation 570.20 570.80 13
2004-02-14 Perforation 561.30 561.90 13
2004-02-14 Perforation 556.40 557.00 13
2004-02-14 Perforation 547.80 548.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3790 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8720 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References