X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253216000

Well Details

Well ID: 0284253216000
Loading map...
Location: 00/16-32-028-25W4/0
Location Alias: 00/16-32-28-25 W4M
Location Alias 2: 00/16-32-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 32
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 16-32-28-25
Operator Name: Ember Resources Inc.
License Number: 0301218
License Date: 2004-01-12
License Status: Issued
Spud Date: 2004-01-26
Final Drill Date: 2004-01-26
Well Total Depth: 759.00 m
Surface Hole Latitude: 51.442190
Surface Hole Longitude: -113.480099

For data sources see[1][2]

Well History

Date Event
2004-01-12 Obtained License
2004-01-21 Surface Casing Operation Performed
2004-01-26 Finished Drilling
2004-01-26 Production Casing Operation Performed
2004-01-26 Well Mode changed to Drilled and Cased
2004-01-27 Rig Released
2004-02-23 Well Log Performed
2004-05-31 Perforation Treatment Performed - Jet Perforation
2004-06-03 Perforation Treatment Performed - Fractured
2004-07-08 Well Began Production
2004-07-08 Well Fluid changed to Gas
2004-07-08 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-05-31 Perforation 652.50 653.00 13
2004-05-31 Perforation 592.20 592.70 13
2004-05-31 Perforation 585.00 585.90 13
2004-05-31 Perforation 584.40 584.90 13
2004-05-31 Perforation 571.70 572.20 13
2004-05-31 Perforation 566.50 567.00 13
2004-05-31 Perforation 558.70 559.20 13
2004-05-31 Perforation 533.60 534.10 13
2004-05-31 Perforation 520.20 520.70 13
2004-05-31 Perforation 516.60 517.10 13
2004-05-31 Perforation 510.00 510.50 13
2004-05-31 Perforation 650.90 651.40 13
2004-05-31 Perforation 505.80 506.30 13
2004-05-31 Perforation 501.70 502.20 13
2004-05-31 Perforation 482.30 482.80 13
2004-05-31 Perforation 471.10 471.60 13
2004-05-31 Perforation 470.20 470.70 13
2004-05-31 Perforation 460.00 460.50 13
2004-05-31 Perforation 406.40 406.90 13
2004-05-31 Perforation 388.20 388.70 13
2004-05-31 Perforation 373.00 373.50 13
2004-05-31 Perforation 355.70 356.20 13
2004-05-31 Perforation 633.50 634.00 13
2004-05-31 Perforation 341.90 342.40 13
2004-05-31 Perforation 279.50 280.00 13
2004-05-31 Perforation 240.90 241.40 13
2004-05-31 Perforation 227.50 228.00 13
2004-05-31 Perforation 225.80 226.30 13
2004-05-31 Perforation 219.00 219.50 13
2004-05-31 Perforation 211.70 212.20 13
2004-06-03 Fracture 211.70 653.00 0
2004-05-31 Perforation 628.10 628.60 13
2004-05-31 Perforation 626.00 626.50 13
2004-05-31 Perforation 625.40 625.90 13
2004-05-31 Perforation 614.20 614.70 13
2004-05-31 Perforation 605.20 605.70 13
2004-05-31 Perforation 597.90 598.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 3742 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8724 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References