If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284253206002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.435326,"lon":-113.4916,"icon":""}]} |
| Location: 00/06-32-028-25W4/2 | |
| Location Alias: 00/06-32-28-25 W4M | |
| Location Alias 2: 00/06-32-028-25 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 32 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 6-32-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0302972 | |
| License Date: 2004-01-28 | |
| License Status: Issued | |
| Spud Date: 2004-02-07 | |
| Final Drill Date: 2004-02-09 | |
| Well Total Depth: 996.00 m | |
| Surface Hole Latitude: 51.435326 | |
| Surface Hole Longitude: -113.491600 |
| Date | Event |
|---|---|
| 2004-01-28 | Obtained License |
| 2004-02-07 | Surface Casing Operation Performed |
| 2004-02-08 | Production Casing Operation Performed |
| 2004-02-09 | Finished Drilling |
| 2004-02-09 | Rig Released |
| 2004-02-09 | Well Mode changed to Drilled and Cased |
| 2004-02-24 | Well Log Performed |
| 2004-03-05 | Perforation Treatment Performed - Jet Perforation |
| 2004-05-31 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-04 | Perforation Treatment Performed - Fractured |
| 2004-07-22 | Well Began Production |
| 2004-07-22 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2004-07-22 | Well Mode changed to Flowing |
| 2017-03-27 | Well Fluid changed to Coalbed Methane-Coals Only |
| 2017-03-27 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2004-03-05 | Perforation | 876.00 | 879.00 | 13 |
| 2004-05-31 | Perforation | 576.00 | 576.50 | 13 |
| 2004-05-31 | Perforation | 567.80 | 568.30 | 13 |
| 2004-05-31 | Perforation | 566.70 | 567.20 | 13 |
| 2004-05-31 | Perforation | 540.70 | 541.20 | 13 |
| 2004-05-31 | Perforation | 535.90 | 536.40 | 13 |
| 2004-05-31 | Perforation | 524.80 | 525.30 | 13 |
| 2004-05-31 | Perforation | 520.10 | 520.60 | 13 |
| 2004-05-31 | Perforation | 514.20 | 514.70 | 13 |
| 2004-05-31 | Perforation | 496.50 | 497.00 | 13 |
| 2004-05-31 | Perforation | 485.00 | 485.50 | 13 |
| 2004-05-31 | Perforation | 637.50 | 638.00 | 13 |
| 2004-05-31 | Perforation | 472.60 | 473.10 | 13 |
| 2004-05-31 | Perforation | 363.80 | 364.30 | 13 |
| 2004-05-31 | Perforation | 356.60 | 357.10 | 13 |
| 2004-05-31 | Perforation | 349.70 | 350.20 | 13 |
| 2004-05-31 | Perforation | 344.70 | 345.20 | 13 |
| 2004-05-31 | Perforation | 244.60 | 245.10 | 13 |
| 2004-05-31 | Perforation | 239.80 | 240.30 | 13 |
| 2004-05-31 | Perforation | 239.00 | 239.50 | 13 |
| 2004-05-31 | Perforation | 237.90 | 238.40 | 13 |
| 2004-05-31 | Perforation | 230.50 | 231.00 | 13 |
| 2004-05-31 | Perforation | 632.90 | 633.40 | 13 |
| 2004-05-31 | Perforation | 218.80 | 219.30 | 13 |
| 2004-05-31 | Perforation | 216.70 | 217.20 | 13 |
| 2004-06-04 | Fracture | 216.70 | 638.00 | 0 |
| 2004-05-31 | Perforation | 622.20 | 622.70 | 13 |
| 2004-05-31 | Perforation | 613.90 | 614.40 | 13 |
| 2004-05-31 | Perforation | 611.20 | 611.70 | 13 |
| 2004-05-31 | Perforation | 604.00 | 604.50 | 13 |
| 2004-05-31 | Perforation | 594.10 | 594.60 | 13 |
| 2004-05-31 | Perforation | 581.50 | 582.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2004 | 3886 | 0.0 | 0.0 | 0.0 |
| 2005 | 8678 | 0.0 | 0.0 | 0.0 |
| 2006 | 8728 | 0.0 | 0.0 | 0.0 |
| 2007 | 8615 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8704 | 0.0 | 0.0 | 0.0 |
| 2011 | 8673 | 0.0 | 0.0 | 0.0 |
| 2012 | 8778 | 0.0 | 0.0 | 0.0 |
| 2013 | 8719 | 0.0 | 0.0 | 0.0 |
| 2014 | 8594 | 0.0 | 0.0 | 0.0 |
| 2015 | 8685 | 0.0 | 0.0 | 0.0 |
| 2016 | 8600 | 0.0 | 0.0 | 0.0 |
| 2017 | 8575 | 0.0 | 0.0 | 0.0 |
| 2018 | 8671 | 0.0 | 0.0 | 0.0 |
| 2019 | 8507 | 0.0 | 0.0 | 0.0 |
| 2020 | 2128 | 0.0 | 0.0 | 0.0 |
For data sources see[5]