X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284253002000

Well Details

Well ID: 0284253002000
Loading map...
Location: 00/02-30-028-25W4/0
Location Alias: 00/02-30-28-25 W4M
Location Alias 2: 00/02-30-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 30
County/Municipality: Rocky View County
Well Name: EMBER 2D ENTICE 2-30-28-25
Operator Name: Ember Resources Inc.
License Number: 0228663
License Date: 1999-11-13
License Status: Issued
Spud Date: 1999-11-25
Final Drill Date: 1999-11-27
Well Total Depth: 1040.00 m
Surface Hole Latitude: 51.418635
Surface Hole Longitude: -113.505616

For data sources see[1][2]

Well History

Date Event
1999-11-13 Obtained License
1999-11-26 Surface Casing Operation Performed
1999-11-27 Finished Drilling
1999-11-27 Production Casing Operation Performed
1999-11-27 Rig Released
1999-11-27 Well Mode changed to Drilled and Cased
1999-12-14 Well Log Performed
2000-01-21 Perforation Treatment Performed - Jet Perforation
2000-01-25 Perforation Treatment Performed - Jet Perforation
2003-01-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-01-22 Perforation Treatment Performed - Jet Perforation
2003-01-22 Plug Back Performed
2003-01-22 Well Mode changed to Abandoned Zone
2003-01-26 Perforation Treatment Performed - Fractured
2004-07-30 Well Log Performed
2007-08-18 Well Log Performed
2008-09-26 Well Log Performed
2009-10-08 Well Log Performed
2010-08-22 Well Log Performed
2013-10-04 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-21 Perforation 939.00 941.00 7
2003-01-22 Perforation 613.90 614.90 13
2003-01-22 Perforation 606.00 607.00 13
2003-01-22 Perforation 604.00 605.00 13
2003-01-22 Perforation 590.90 591.90 13
2003-01-22 Perforation 587.00 588.00 13
2003-01-22 Perforation 577.50 578.50 13
2003-01-22 Perforation 571.10 572.10 13
2003-01-22 Perforation 562.30 565.30 13
2003-01-22 Perforation 541.00 542.00 13
2003-01-22 Perforation 536.00 537.00 13
2000-01-25 Perforation 709.00 712.00 7
2003-01-22 Perforation 522.10 523.10 13
2003-01-22 Perforation 515.30 517.30 13
2003-01-22 Perforation 510.90 511.90 13
2003-01-22 Perforation 491.20 492.20 13
2003-01-22 Perforation 484.70 485.70 13
2003-01-22 Perforation 480.70 481.70 13
2003-01-22 Perforation 477.50 478.50 13
2003-01-22 Perforation 463.00 465.00 13
2003-01-22 Perforation 410.40 411.40 13
2003-01-22 Perforation 364.10 365.10 13
2000-01-25 Perforation 707.00 709.00 7
2003-01-22 Perforation 360.40 361.40 13
2003-01-22 Perforation 349.20 350.20 13
2003-01-22 Perforation 339.10 340.10 13
2003-01-22 Perforation 328.80 329.80 13
2003-01-22 Perforation 272.40 273.40 13
2003-01-22 Perforation 226.60 227.60 13
2003-01-22 Perforation 219.00 221.00 13
2003-01-22 Perforation 217.10 218.10 13
2003-01-22 Perforation 210.70 211.70 13
2003-01-26 Fracture 210.70 643.30 0
2003-01-22 Packing Device Capped w/Cement 922.00 930.00 0
2003-01-22 Packing Device Capped w/Cement 692.00 700.00 0
2003-01-22 Perforation 642.30 643.30 13
2003-01-22 Perforation 634.50 635.50 13
2003-01-22 Perforation 632.80 633.80 13
2003-01-22 Perforation 628.90 629.90 13

For data sources see[4]



References