X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252816020

Well Details

Well ID: 0284252816020
Loading map...
Location: 02/16-28-028-25W4/0
Location Alias: 02/16-28-28-25 W4M
Location Alias 2: 02/16-28-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 28
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 16-28-28-25
Operator Name: Ember Resources Inc.
License Number: 0269799
License Date: 2002-05-06
License Status: Issued
Spud Date: 2002-05-28
Final Drill Date: 2002-05-31
Well Total Depth: 664.00 m
Surface Hole Latitude: 51.429591
Surface Hole Longitude: -113.451771

For data sources see[1][2]

Well History

Date Event
2002-05-06 Obtained License
2002-05-28 Surface Casing Operation Performed
2002-05-31 Finished Drilling
2002-05-31 Production Casing Operation Performed
2002-05-31 Rig Released
2002-05-31 Well Mode changed to Drilled and Cased
2002-06-19 Well Log Performed
2002-07-14 Perforation Treatment Performed - Jet Perforation
2002-07-18 Perforation Treatment Performed - Fractured
2003-07-17 Well Began Production
2003-07-17 Well Fluid changed to Coalbed Methane-Coals Only
2003-07-17 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-07-14 Perforation 601.10 602.10 13
2002-07-14 Perforation 539.70 540.70 13
2002-07-14 Perforation 531.10 533.10 13
2002-07-14 Perforation 527.80 528.80 13
2002-07-14 Perforation 486.80 487.80 13
2002-07-14 Perforation 479.30 480.30 13
2002-07-14 Perforation 475.70 477.70 13
2002-07-14 Perforation 471.80 472.80 13
2002-07-14 Perforation 452.00 453.00 13
2002-07-14 Perforation 446.40 447.40 13
2002-07-14 Perforation 441.30 443.30 13
2002-07-14 Perforation 597.00 598.00 13
2002-07-14 Perforation 429.20 430.20 13
2002-07-14 Perforation 427.00 428.00 13
2002-07-14 Perforation 376.20 377.20 13
2002-07-14 Perforation 324.30 325.30 13
2002-07-14 Perforation 315.00 316.00 13
2002-07-14 Perforation 207.70 208.70 13
2002-07-14 Perforation 202.50 203.50 13
2002-07-14 Perforation 201.00 202.00 13
2002-07-14 Perforation 199.50 200.50 13
2002-07-18 Fracture 199.50 602.10 0
2002-07-14 Perforation 594.10 596.10 13
2002-07-14 Perforation 583.60 585.60 13
2002-07-14 Perforation 573.50 574.50 13
2002-07-14 Perforation 568.10 569.10 13
2002-07-14 Perforation 562.70 563.70 13
2002-07-14 Perforation 553.80 554.80 13
2002-07-14 Perforation 545.10 546.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1983 0.0 0.0 0.0
2004 3516 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8452 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8575 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References