X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252703000

Well Details

Well ID: 0284252703000
Loading map...
Location: 00/03-27-028-25W4/0
Location Alias: 00/03-27-28-25 W4M
Location Alias 2: 00/03-27-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 27
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 3-27-28-25
Operator Name: Ember Resources Inc.
License Number: 0294968
License Date: 2003-10-24
License Status: Issued
Spud Date: 2003-11-09
Final Drill Date: 2003-11-09
Well Total Depth: 713.00 m
Surface Hole Latitude: 51.417388
Surface Hole Longitude: -113.442651

For data sources see[1][2]

Well History

Date Event
2003-10-24 Obtained License
2003-11-07 Surface Casing Operation Performed
2003-11-09 Finished Drilling
2003-11-09 Production Casing Operation Performed
2003-11-09 Rig Released
2003-11-09 Well Mode changed to Drilled and Cased
2003-11-28 Well Log Performed
2004-01-15 Perforation Treatment Performed - Jet Perforation
2004-01-30 Perforation Treatment Performed - Fractured
2004-05-03 Well Began Production
2004-05-03 Well Fluid changed to Coalbed Methane-Coals Only
2004-05-03 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-01-15 Perforation 601.90 602.90 13
2004-01-15 Perforation 542.50 543.50 13
2004-01-15 Perforation 536.30 537.30 13
2004-01-15 Perforation 528.00 529.00 13
2004-01-15 Perforation 525.50 526.50 13
2004-01-15 Perforation 522.10 523.10 13
2004-01-15 Perforation 498.50 501.50 13
2004-01-15 Perforation 482.40 483.40 13
2004-01-15 Perforation 480.90 481.90 13
2004-01-15 Perforation 473.30 474.30 13
2004-01-15 Perforation 469.00 470.00 13
2004-01-15 Perforation 596.50 597.50 13
2004-01-15 Perforation 444.30 445.30 13
2004-01-15 Perforation 439.90 440.90 13
2004-01-15 Perforation 436.70 438.70 13
2004-01-15 Perforation 419.00 421.00 13
2004-01-15 Perforation 307.40 308.40 13
2004-01-15 Perforation 296.90 297.90 13
2004-01-15 Perforation 242.80 243.80 13
2004-01-15 Perforation 204.20 205.20 13
2004-01-15 Perforation 200.00 201.00 13
2004-01-15 Perforation 194.40 195.40 13
2004-01-15 Perforation 591.90 592.90 13
2004-01-15 Perforation 192.40 193.40 13
2004-01-30 Fracture 192.40 602.90 0
2004-01-15 Perforation 575.30 576.30 13
2004-01-15 Perforation 565.30 566.30 13
2004-01-15 Perforation 563.30 564.30 13
2004-01-15 Perforation 556.90 557.90 13
2004-01-15 Perforation 548.00 549.00 13
2004-01-15 Perforation 546.10 547.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 5758 0.0 0.0 0.0
2005 8678 0.0 0.0 0.0
2006 8728 0.0 0.0 0.0
2007 8615 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8704 0.0 0.0 0.0
2011 8673 0.0 0.0 0.0
2012 8762 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 8594 0.0 0.0 0.0
2015 8685 0.0 0.0 0.0
2016 8600 0.0 0.0 0.0
2017 8574 0.0 0.0 0.0
2018 8671 0.0 0.0 0.0
2019 8507 0.0 0.0 0.0
2020 2128 0.0 0.0 0.0

For data sources see[5]

References