X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284252209000

Well Details

Well ID: 0284252209000
Loading map...
Location: 00/09-22-028-25W4/0
Location Alias: 00/09-22-28-25 W4M
Location Alias 2: 00/09-22-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 22
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 9-22-28-25
Operator Name: Ember Resources Inc.
License Number: 0291516
License Date: 2003-08-19
License Status: Issued
Spud Date: 2003-09-08
Final Drill Date: 2003-09-08
Well Total Depth: 723.00 m
Surface Hole Latitude: 51.411069
Surface Hole Longitude: -113.431636

For data sources see[1][2]

Well History

Date Event
2003-08-19 Obtained License
2003-09-03 Conductor Casing Operation Performed
2003-09-08 Finished Drilling
2003-09-08 Well Mode changed to Drilled and Cased
2003-09-09 Production Casing Operation Performed
2003-09-09 Rig Released
2003-09-21 Well Log Performed
2003-10-04 Perforation Treatment Performed - Jet Perforation
2003-12-11 Perforation Treatment Performed - Jet Perforation
2004-02-13 Well Began Production
2004-02-13 Well Fluid changed to Gas
2004-02-13 Well Mode changed to Flowing
2005-01-27 Perforation Treatment Performed - Jet Perforation
2005-02-07 Perforation Treatment Performed - Fractured
2005-02-13 Well Fluid changed to Coalbed Methane-Coals and Other
2005-02-13 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-10-04 Perforation 668.00 670.00 13
2005-01-27 Perforation 548.60 549.10 13
2005-01-27 Perforation 540.80 541.30 13
2005-01-27 Perforation 535.00 535.50 13
2005-01-27 Perforation 527.40 527.90 13
2005-01-27 Perforation 484.40 484.90 13
2005-01-27 Perforation 483.20 483.70 13
2005-01-27 Perforation 471.10 471.60 13
2005-01-27 Perforation 468.00 468.50 13
2005-01-27 Perforation 448.40 448.90 13
2005-01-27 Perforation 444.20 444.70 13
2003-12-11 Perforation 489.00 492.00 13
2005-01-27 Perforation 440.10 440.60 13
2005-01-27 Perforation 422.70 423.20 13
2005-01-27 Perforation 317.30 317.80 13
2005-01-27 Perforation 309.30 309.80 13
2005-01-27 Perforation 244.50 245.00 13
2005-01-27 Perforation 201.20 201.70 13
2005-01-27 Perforation 195.50 196.00 13
2005-02-07 Fracture 195.50 594.40 0
2003-12-11 Perforation 495.00 498.00 13
2005-01-27 Perforation 593.90 594.40 13
2005-01-27 Perforation 577.60 578.10 13
2005-01-27 Perforation 567.90 568.40 13
2005-01-27 Perforation 566.20 566.70 13
2005-01-27 Perforation 559.90 560.40 13
2005-01-27 Perforation 550.50 551.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 7641 0.0 0.0 0.0
2005 7808 0.0 0.0 0.0
2006 8685 0.0 0.0 0.0
2007 8708 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8677 0.0 0.0 0.0
2011 8682 0.0 0.0 0.0
2012 8755 0.0 0.0 0.0
2013 8596 0.0 0.0 0.0
2014 8529 0.0 0.0 0.0
2015 8691 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References