If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284252205000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.406086,"lon":-113.449911,"icon":""}]} |
| Location: 00/05-22-028-25W4/0 | |
| Location Alias: 00/05-22-28-25 W4M | |
| Location Alias 2: 00/05-22-028-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 22 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 5B ENTICE 5-22-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0228721 | |
| License Date: 1999-11-16 | |
| License Status: Issued | |
| Spud Date: 1999-11-23 | |
| Final Drill Date: 1999-11-25 | |
| Well Total Depth: 1000.00 m | |
| Surface Hole Latitude: 51.406086 | |
| Surface Hole Longitude: -113.449911 |
| Date | Event |
|---|---|
| 1999-11-16 | Obtained License |
| 1999-11-24 | Surface Casing Operation Performed |
| 1999-11-25 | Finished Drilling |
| 1999-11-25 | Production Casing Operation Performed |
| 1999-11-25 | Rig Released |
| 1999-11-25 | Well Mode changed to Drilled and Cased |
| 1999-12-14 | Well Log Performed |
| 2000-01-08 | Perforation Treatment Performed - Jet Perforation |
| 2000-01-15 | Perforation Treatment Performed - Jet Perforation |
| 2000-01-25 | Perforation Treatment Performed - Fractured |
| 2000-05-29 | Well Began Production |
| 2000-05-29 | Well Fluid changed to Gas |
| 2000-05-29 | Well Mode changed to Flowing |
| 2007-01-19 | Perforation Treatment Performed - Jet Perforation |
| 2007-01-25 | Perforation Treatment Performed - Fractured |
| 2007-02-06 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2007-02-06 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-01-08 | Perforation | 862.50 | 864.50 | 7 |
| 2007-01-19 | Perforation | 557.20 | 557.70 | 13 |
| 2007-01-19 | Perforation | 548.50 | 549.00 | 13 |
| 2007-01-19 | Perforation | 546.50 | 547.00 | 13 |
| 2007-01-19 | Perforation | 540.50 | 541.50 | 13 |
| 2007-01-19 | Perforation | 536.20 | 536.70 | 13 |
| 2007-01-19 | Perforation | 528.50 | 529.50 | 13 |
| 2007-01-19 | Perforation | 527.30 | 527.80 | 13 |
| 2007-01-19 | Perforation | 499.30 | 499.80 | 13 |
| 2007-01-19 | Perforation | 497.80 | 498.80 | 13 |
| 2007-01-19 | Perforation | 491.00 | 491.50 | 13 |
| 2000-01-15 | Perforation | 522.50 | 525.50 | 7 |
| 2007-01-19 | Perforation | 489.90 | 490.40 | 13 |
| 2007-01-19 | Perforation | 480.50 | 481.00 | 13 |
| 2007-01-19 | Perforation | 476.10 | 477.10 | 13 |
| 2007-01-19 | Perforation | 451.00 | 451.50 | 13 |
| 2007-01-19 | Perforation | 440.70 | 441.20 | 13 |
| 2007-01-19 | Perforation | 438.60 | 439.10 | 13 |
| 2007-01-19 | Perforation | 422.20 | 424.20 | 13 |
| 2007-01-19 | Perforation | 394.40 | 394.90 | 13 |
| 2007-01-19 | Perforation | 351.80 | 352.30 | 13 |
| 2007-01-19 | Perforation | 338.60 | 339.10 | 13 |
| 2000-01-25 | Fracture | 522.50 | 525.50 | 0 |
| 2007-01-19 | Perforation | 328.20 | 328.70 | 13 |
| 2007-01-19 | Perforation | 309.20 | 310.20 | 13 |
| 2007-01-19 | Perforation | 306.10 | 306.60 | 13 |
| 2007-01-19 | Perforation | 243.00 | 243.50 | 13 |
| 2007-01-25 | Fracture | 243.00 | 607.50 | 0 |
| 2007-01-19 | Perforation | 607.00 | 607.50 | 13 |
| 2007-01-19 | Perforation | 600.20 | 600.70 | 13 |
| 2007-01-19 | Perforation | 596.20 | 597.20 | 13 |
| 2007-01-19 | Perforation | 575.20 | 575.70 | 13 |
| 2007-01-19 | Perforation | 565.30 | 565.80 | 13 |
| 2007-01-19 | Perforation | 563.60 | 564.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2000 | 3266 | 0.0 | 0.0 | 0.0 |
| 2001 | 6979 | 0.0 | 0.0 | 0.0 |
| 2002 | 7292 | 0.0 | 0.0 | 0.0 |
| 2003 | 6855 | 0.0 | 0.0 | 0.0 |
| 2004 | 6499 | 0.0 | 0.0 | 0.0 |
| 2005 | 8653 | 0.0 | 0.0 | 0.0 |
| 2006 | 7283 | 0.0 | 0.0 | 0.0 |
| 2007 | 7844 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8677 | 0.0 | 0.0 | 0.0 |
| 2011 | 8682 | 0.0 | 0.0 | 0.0 |
| 2012 | 8755 | 0.0 | 0.0 | 0.0 |
| 2013 | 8596 | 0.0 | 0.0 | 0.0 |
| 2014 | 8529 | 0.0 | 0.0 | 0.0 |
| 2015 | 8691 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8745 | 0.0 | 0.0 | 0.0 |
| 2019 | 8562 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]