If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284251611020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.395795,"lon":-113.467938,"icon":""}]} |
| Location: 02/11-16-028-25W4/0 | |
| Location Alias: 02/11-16-28-25 W4M | |
| Location Alias 2: 02/11-16-028-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 16 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 ENTICE 11-16-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0383902 | |
| License Date: 2007-10-29 | |
| License Status: Issued | |
| Spud Date: 2007-11-15 | |
| Final Drill Date: 2007-11-17 | |
| Well Total Depth: 726.00 m | |
| Surface Hole Latitude: 51.395795 | |
| Surface Hole Longitude: -113.467938 |
| Date | Event |
|---|---|
| 2007-10-29 | Obtained License |
| 2007-11-15 | Surface Casing Operation Performed |
| 2007-11-17 | Finished Drilling |
| 2007-11-17 | Production Casing Operation Performed |
| 2007-11-17 | Rig Released |
| 2007-11-17 | Well Mode changed to Drilled and Cased |
| 2007-11-20 | Well Log Performed |
| 2007-12-03 | Perforation Treatment Performed - Jet Perforation |
| 2007-12-17 | Perforation Treatment Performed - Fractured |
| 2007-12-21 | Well Fluid changed to Gas |
| 2007-12-21 | Well Mode changed to Testing |
| 2008-02-27 | Well Began Production |
| 2008-02-27 | Well Fluid changed to Gas |
| 2008-02-27 | Well Mode changed to Flowing |
| 2009-08-30 | Perforation Treatment Performed - Jet Perforation |
| 2009-09-12 | Perforation Treatment Performed - Fractured |
| 2009-09-22 | Well Structure changed to Commingled |
| 2009-11-06 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2007-12-03 | Perforation | 586.00 | 589.00 | 13 |
| 2009-08-30 | Perforation | 311.00 | 313.00 | 13 |
| 2009-08-30 | Perforation | 271.50 | 272.50 | 13 |
| 2009-08-30 | Perforation | 215.50 | 218.50 | 13 |
| 2009-08-30 | Perforation | 533.00 | 535.00 | 13 |
| 2009-08-30 | Perforation | 497.00 | 500.00 | 13 |
| 2009-08-30 | Perforation | 360.00 | 362.00 | 13 |
| 2009-08-30 | Perforation | 571.80 | 572.30 | 13 |
| 2009-08-30 | Perforation | 560.50 | 561.00 | 13 |
| 2009-08-30 | Perforation | 548.70 | 549.20 | 13 |
| 2009-08-30 | Perforation | 577.20 | 578.20 | 13 |
| 2007-12-17 | Fracture | 586.00 | 589.00 | 0 |
| 2009-08-30 | Perforation | 609.70 | 610.70 | 13 |
| 2009-08-30 | Perforation | 595.20 | 595.70 | 13 |
| 2009-08-30 | Perforation | 579.20 | 579.70 | 13 |
| 2009-08-30 | Perforation | 465.70 | 466.20 | 13 |
| 2009-08-30 | Perforation | 489.70 | 490.70 | 13 |
| 2009-08-30 | Perforation | 484.50 | 485.00 | 13 |
| 2009-08-30 | Perforation | 513.00 | 514.00 | 13 |
| 2009-08-30 | Perforation | 544.60 | 545.10 | 13 |
| 2009-08-30 | Perforation | 537.10 | 538.10 | 13 |
| 2009-09-12 | Fracture | 215.50 | 553.00 | 0 |
| 2009-08-30 | Perforation | 318.90 | 319.40 | 13 |
| 2009-09-12 | Fracture | 205.30 | 610.70 | 0 |
| 2009-08-30 | Perforation | 317.10 | 317.60 | 13 |
| 2009-08-30 | Perforation | 205.30 | 205.80 | 13 |
| 2009-08-30 | Perforation | 451.50 | 452.00 | 13 |
| 2009-08-30 | Perforation | 435.40 | 437.40 | 13 |
| 2009-08-30 | Perforation | 329.80 | 330.80 | 13 |
| 2009-08-30 | Perforation | 551.00 | 553.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 48 | 0.0 | 0.0 | 0.0 |
| 2008 | 7415 | 0.0 | 0.0 | 0.0 |
| 2009 | 5663 | 0.0 | 0.0 | 0.0 |
For data sources see[5]