X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284250909020

Well Details

Well ID: 0284250909020
Loading map...
Location: 02/09-09-028-25W4/0
Location Alias: 02/09-09-28-25 W4M
Location Alias 2: 02/09-09-028-25 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 25
Section: 09
County/Municipality: Rocky View County
Well Name: EMBER 102 ENTICE 9-9-28-25
Operator Name: Ember Resources Inc.
License Number: 0268754
License Date: 2002-03-19
License Status: Issued
Spud Date: 2002-03-25
Final Drill Date: 2002-03-27
Well Total Depth: 612.00 m
Surface Hole Latitude: 51.380070
Surface Hole Longitude: -113.451846

For data sources see[1][2]

Well History

Date Event
2002-03-19 Obtained License
2002-03-25 Surface Casing Operation Performed
2002-03-27 Finished Drilling
2002-03-27 Production Casing Operation Performed
2002-03-27 Rig Released
2002-03-27 Well Mode changed to Drilled and Cased
2002-04-29 Well Log Performed
2002-05-22 Perforation Treatment Performed - Jet Perforation
2002-05-26 Perforation Treatment Performed - Fractured
2003-07-18 Well Began Production
2003-07-18 Well Fluid changed to Coalbed Methane-Coals Only
2003-07-18 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-05-22 Perforation 586.90 588.90 13
2002-05-22 Perforation 502.50 505.50 13
2002-05-22 Perforation 489.20 490.20 13
2002-05-22 Perforation 482.60 484.60 13
2002-05-22 Perforation 458.00 459.00 13
2002-05-22 Perforation 452.50 453.50 13
2002-05-22 Perforation 448.90 449.90 13
2002-05-22 Perforation 443.60 444.60 13
2002-05-22 Perforation 438.60 439.60 13
2002-05-22 Perforation 426.50 429.50 13
2002-05-22 Perforation 378.50 379.50 13
2002-05-22 Perforation 579.80 580.80 13
2002-05-22 Perforation 372.30 373.30 13
2002-05-22 Perforation 333.70 334.70 13
2002-05-22 Perforation 326.40 327.40 13
2002-05-22 Perforation 319.60 320.60 13
2002-05-22 Perforation 315.70 316.70 13
2002-05-22 Perforation 312.50 313.50 13
2002-05-22 Perforation 247.20 248.20 13
2002-05-22 Perforation 220.60 221.60 13
2002-05-22 Perforation 209.00 210.00 13
2002-05-26 Fracture 209.00 588.90 0
2002-05-22 Perforation 575.30 576.30 13
2002-05-22 Perforation 557.60 558.60 13
2002-05-22 Perforation 555.70 556.70 13
2002-05-22 Perforation 547.10 548.10 13
2002-05-22 Perforation 540.80 541.80 13
2002-05-22 Perforation 534.70 535.70 13
2002-05-22 Perforation 530.30 531.30 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 1494 0.0 0.0 0.0
2004 7828 0.0 0.0 0.0
2005 8653 0.0 0.0 0.0
2006 8685 0.0 0.0 0.0
2007 8639 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8746 0.0 0.0 0.0
2011 8728 0.0 0.0 0.0
2012 8778 0.0 0.0 0.0
2013 8715 0.0 0.0 0.0
2014 8671 0.0 0.0 0.0
2015 8699 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8745 0.0 0.0 0.0
2019 8562 0.0 0.0 0.0
2020 2171 0.0 0.0 0.0

For data sources see[5]

References