If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0284250114020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.371705,"lon":-113.396949,"icon":""}]} |
| Location: 02/14-01-028-25W4/0 | |
| Location Alias: 02/14-01-28-25 W4M | |
| Location Alias 2: 02/14-01-028-25 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 028 | |
| Meridian: 4 | |
| Range: 25 | |
| Section: 01 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 ENTICE 14-1-28-25 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0422384 | |
| License Date: 2010-08-05 | |
| License Status: Issued | |
| Spud Date: 2010-10-30 | |
| Final Drill Date: 2010-11-04 | |
| Well Total Depth: 960.00 m | |
| Surface Hole Latitude: 51.371705 | |
| Surface Hole Longitude: -113.396949 |
| Date | Event |
|---|---|
| 2010-08-05 | Obtained License |
| 2010-10-30 | Surface Casing Operation Performed |
| 2010-11-04 | Finished Drilling |
| 2010-11-04 | Production Casing Operation Performed |
| 2010-11-04 | Rig Released |
| 2010-11-04 | Well Mode changed to Drilled and Cased |
| 2010-11-08 | Well Log Performed |
| 2011-01-06 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-23 | Perforation Treatment Performed - Fractured |
| 2011-02-27 | Well Fluid changed to Gas |
| 2011-02-27 | Well Mode changed to Testing |
| 2011-04-08 | Well Began Production |
| 2011-04-08 | Well Fluid changed to Gas |
| 2011-04-08 | Well Mode changed to Flowing |
| 2011-07-17 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-17 | Well Fluid changed to Gas |
| 2011-07-17 | Well Mode changed to Suspended |
| 2011-08-05 | Perforation Treatment Performed - Fractured |
| 2011-08-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-08-17 | Well Mode changed to Flowing |
| 2017-11-20 | Well Log Performed |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-06 | Perforation | 876.50 | 878.50 | 13 |
| 2011-07-17 | Perforation | 296.50 | 297.00 | 13 |
| 2011-07-17 | Perforation | 306.40 | 306.90 | 13 |
| 2011-07-17 | Perforation | 334.00 | 336.00 | 13 |
| 2011-07-17 | Perforation | 352.50 | 354.50 | 13 |
| 2011-07-17 | Perforation | 358.00 | 358.50 | 13 |
| 2011-07-17 | Perforation | 406.70 | 408.20 | 13 |
| 2011-07-17 | Perforation | 408.20 | 408.70 | 13 |
| 2011-07-17 | Perforation | 409.30 | 410.30 | 13 |
| 2011-07-17 | Perforation | 419.10 | 419.60 | 13 |
| 2011-07-17 | Perforation | 427.10 | 428.10 | 13 |
| 2011-01-06 | Perforation | 656.50 | 658.50 | 13 |
| 2011-07-17 | Perforation | 437.70 | 438.70 | 13 |
| 2011-07-17 | Perforation | 456.60 | 457.60 | 13 |
| 2011-07-17 | Perforation | 458.80 | 460.80 | 13 |
| 2011-07-17 | Perforation | 464.60 | 465.10 | 13 |
| 2011-07-17 | Perforation | 472.70 | 473.20 | 13 |
| 2011-07-17 | Perforation | 473.50 | 474.00 | 13 |
| 2011-07-17 | Perforation | 478.80 | 480.30 | 13 |
| 2011-07-17 | Perforation | 508.10 | 508.60 | 13 |
| 2011-07-17 | Perforation | 515.20 | 515.70 | 13 |
| 2011-07-17 | Perforation | 524.30 | 525.30 | 13 |
| 2011-01-06 | Perforation | 628.50 | 630.50 | 13 |
| 2011-07-17 | Perforation | 532.20 | 533.70 | 13 |
| 2011-07-17 | Perforation | 539.50 | 540.50 | 13 |
| 2011-07-17 | Perforation | 545.60 | 546.10 | 13 |
| 2011-07-17 | Perforation | 548.80 | 549.30 | 13 |
| 2011-07-17 | Perforation | 554.50 | 556.50 | 13 |
| 2011-07-17 | Perforation | 563.00 | 564.00 | 13 |
| 2011-07-17 | Perforation | 579.70 | 580.20 | 13 |
| 2011-07-17 | Perforation | 590.90 | 591.40 | 13 |
| 2011-08-05 | Fracture | 207.50 | 591.40 | 0 |
| 2011-02-23 | Fracture | 876.50 | 878.50 | 0 |
| 2011-02-23 | Fracture | 656.50 | 658.50 | 0 |
| 2011-02-23 | Fracture | 628.50 | 630.50 | 0 |
| 2011-07-17 | Perforation | 207.50 | 209.50 | 13 |
| 2011-07-17 | Perforation | 236.50 | 238.50 | 13 |
| 2011-07-17 | Perforation | 287.40 | 287.90 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 6432 | 0.0 | 0.0 | 0.0 |
| 2012 | 8755 | 0.0 | 0.0 | 0.0 |
| 2013 | 8608 | 0.0 | 0.0 | 0.0 |
| 2014 | 8529 | 0.0 | 0.0 | 0.0 |
| 2015 | 8691 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8745 | 0.0 | 0.0 | 0.0 |
| 2019 | 8562 | 0.0 | 0.0 | 0.0 |
| 2020 | 2171 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-11-20 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]