If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284241310002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.396351,"lon":-113.248054,"icon":""}]} |
Location: 00/10-13-028-24W4/2 | |
Location Alias: 00/10-13-28-24 W4M | |
Location Alias 2: 00/10-13-028-24 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 24 | |
Section: 13 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 10-13-28-24 | |
Operator Name: Ember Resources Inc. | |
License Number: 0053142 | |
License Date: 1975-03-04 | |
License Status: Issued | |
Spud Date: 1975-03-07 | |
Final Drill Date: 1975-03-11 | |
Well Total Depth: 936.30 m | |
Surface Hole Latitude: 51.396351 | |
Surface Hole Longitude: -113.248054 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1975-03-04 | Obtained License |
1975-03-11 | Finished Drilling |
1975-03-11 | Well Mode changed to Drilled and Cased |
1975-03-12 | Drill Stem Test Performed |
1975-03-13 | Drill Stem Test Performed |
1975-03-14 | Drill Stem Test Performed |
1975-03-14 | Production Casing Operation Performed |
1975-05-14 | Perforation Treatment Performed - Jet Perforation |
1975-05-15 | Perforation Treatment Performed - Acid Wash - No Pressure |
1975-05-15 | Perforation Treatment Performed - Fractured |
1975-05-16 | Perforation Treatment Performed - Jet Perforation |
1975-05-17 | Perforation Treatment Performed - Acid Wash - No Pressure |
1975-05-17 | Perforation Treatment Performed - Fractured |
1977-01-19 | Well Began Production |
1977-01-19 | Well Fluid changed to Gas |
1977-01-19 | Well Mode changed to Flowing |
2006-04-20 | Well Log Performed |
2007-05-01 | Perforation Treatment Performed - Jet Perforation |
2007-05-16 | Perforation Treatment Performed - Fractured |
2007-05-29 | Well Structure changed to Commingled |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1975-05-14 | Perforation | 855.90 | 856.80 | 13 |
1975-05-17 | Fracture | 821.40 | 833.90 | 0 |
2007-05-01 | Perforation | 559.10 | 559.60 | 13 |
2007-05-01 | Perforation | 557.10 | 557.60 | 13 |
2007-05-01 | Perforation | 518.30 | 518.80 | 13 |
2007-05-01 | Perforation | 512.50 | 513.50 | 13 |
2007-05-01 | Perforation | 506.80 | 507.80 | 13 |
2007-05-01 | Perforation | 500.00 | 500.50 | 13 |
2007-05-01 | Perforation | 494.40 | 494.90 | 13 |
2007-05-01 | Perforation | 447.00 | 450.00 | 13 |
2007-05-01 | Perforation | 444.70 | 445.20 | 13 |
1975-05-14 | Perforation | 858.30 | 859.50 | 13 |
2007-05-01 | Perforation | 437.80 | 438.30 | 13 |
2007-05-01 | Perforation | 436.30 | 437.30 | 13 |
2007-05-01 | Perforation | 409.60 | 410.10 | 13 |
2007-05-01 | Perforation | 390.20 | 390.70 | 13 |
2007-05-01 | Perforation | 378.70 | 379.20 | 13 |
2007-05-01 | Perforation | 366.00 | 367.00 | 13 |
2007-05-01 | Perforation | 295.80 | 296.30 | 13 |
2007-05-16 | Fracture | 295.80 | 559.60 | 0 |
1975-05-15 | Acid Wash | 855.90 | 859.50 | 0 |
1975-05-15 | Fracture | 855.90 | 859.50 | 0 |
1975-05-16 | Perforation | 821.40 | 822.40 | 7 |
1975-05-16 | Perforation | 824.50 | 825.70 | 7 |
1975-05-16 | Perforation | 830.00 | 830.90 | 7 |
1975-05-16 | Perforation | 831.50 | 833.90 | 3 |
1975-05-17 | Acid Wash | 821.40 | 833.90 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1977 | 7517 | 0.0 | 0.0 | 0.0 |
1978 | 6708 | 0.0 | 0.0 | 0.0 |
1979 | 5788 | 0.0 | 0.0 | 0.0 |
1980 | 7105 | 0.0 | 0.0 | 0.0 |
1981 | 7426 | 0.0 | 0.0 | 0.0 |
1982 | 8224 | 0.0 | 0.0 | 0.0 |
1983 | 5247 | 0.0 | 0.0 | 0.0 |
1984 | 6091 | 0.0 | 0.0 | 0.0 |
1985 | 6547 | 0.0 | 0.0 | 0.0 |
1986 | 4794 | 0.0 | 0.0 | 0.0 |
1987 | 4243 | 0.0 | 0.0 | 0.0 |
1988 | 4781 | 0.0 | 0.0 | 0.0 |
1989 | 1360 | 0.0 | 0.0 | 0.0 |
1992 | 309 | 0.0 | 0.0 | 0.0 |
1993 | 2764 | 0.0 | 0.0 | 0.0 |
1994 | 646 | 0.0 | 0.0 | 0.0 |
1995 | 1360 | 0.0 | 0.0 | 0.0 |
1996 | 8416 | 0.0 | 0.0 | 0.0 |
1997 | 8434 | 0.0 | 0.0 | 0.0 |
1998 | 8547 | 0.0 | 0.0 | 0.0 |
1999 | 8694 | 0.0 | 0.0 | 0.0 |
2000 | 8619 | 0.0 | 0.0 | 0.0 |
2001 | 2061 | 0.0 | 0.0 | 0.0 |
For data sources see[5]