If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0284231815000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.399452,"lon":-113.224819,"icon":""}]} |
Location: 00/15-18-028-23W4/0 | |
Location Alias: 00/15-18-28-23 W4M | |
Location Alias 2: 00/15-18-028-23 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 028 | |
Meridian: 4 | |
Range: 23 | |
Section: 18 | |
County/Municipality: Kneehill County | |
Well Name: EMBER ENTICE 15-18-28-23 | |
Operator Name: Ember Resources Inc. | |
License Number: 0319281 | |
License Date: 2004-11-19 | |
License Status: Issued | |
Spud Date: 2005-02-01 | |
Final Drill Date: 2005-02-28 | |
Well Total Depth: 737.00 m | |
Surface Hole Latitude: 51.399452 | |
Surface Hole Longitude: -113.224819 |
Date | Event |
---|---|
2004-11-19 | Obtained License |
2005-02-01 | Surface Casing Operation Performed |
2005-02-28 | Finished Drilling |
2005-02-28 | Production Casing Operation Performed |
2005-02-28 | Rig Released |
2005-02-28 | Well Mode changed to Drilled and Cased |
2005-03-18 | Well Log Performed |
2005-09-25 | Perforation Treatment Performed - Jet Perforation |
2005-10-15 | Perforation Treatment Performed - Fractured |
2005-11-16 | Well Began Production |
2005-11-16 | Well Fluid changed to Coalbed Methane-Coals Only |
2005-11-16 | Well Mode changed to Flowing |
2009-07-18 | Perforation Treatment Performed - Jet Perforation |
2009-07-23 | Well Log Performed |
2009-07-24 | Well Log Performed |
2009-07-29 | Perforation Treatment Performed - Fractured |
2009-08-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
2009-08-12 | Well Mode changed to Flowing |
2009-09-17 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2005-09-25 | Perforation | 557.60 | 558.10 | 13 |
2005-09-25 | Perforation | 444.50 | 445.00 | 13 |
2005-09-25 | Perforation | 440.20 | 440.70 | 13 |
2005-09-25 | Perforation | 436.00 | 436.50 | 13 |
2005-09-25 | Perforation | 434.30 | 434.80 | 13 |
2005-09-25 | Perforation | 407.40 | 407.90 | 13 |
2005-09-25 | Perforation | 405.90 | 406.40 | 13 |
2005-09-25 | Perforation | 403.50 | 404.00 | 13 |
2005-09-25 | Perforation | 388.10 | 388.60 | 13 |
2005-09-25 | Perforation | 382.80 | 383.30 | 13 |
2005-09-25 | Perforation | 376.00 | 376.50 | 13 |
2005-09-25 | Perforation | 549.00 | 549.50 | 13 |
2005-09-25 | Perforation | 362.90 | 363.40 | 13 |
2005-09-25 | Perforation | 264.60 | 265.10 | 13 |
2005-09-25 | Perforation | 262.70 | 263.20 | 13 |
2005-09-25 | Perforation | 202.40 | 202.90 | 13 |
2005-10-15 | Fracture | 202.40 | 558.10 | 0 |
2009-07-18 | Perforation | 224.00 | 226.00 | 13 |
2009-07-18 | Perforation | 274.00 | 276.00 | 13 |
2009-07-18 | Perforation | 285.00 | 287.00 | 13 |
2009-07-18 | Perforation | 306.00 | 308.00 | 13 |
2009-07-29 | Fracture | 224.00 | 308.00 | 0 |
2005-09-25 | Perforation | 547.70 | 548.20 | 13 |
2009-07-29 | Fracture | 202.40 | 558.10 | 0 |
2005-09-25 | Perforation | 517.50 | 518.00 | 13 |
2005-09-25 | Perforation | 508.90 | 509.40 | 13 |
2005-09-25 | Perforation | 502.00 | 502.50 | 13 |
2005-09-25 | Perforation | 493.00 | 493.50 | 13 |
2005-09-25 | Perforation | 487.70 | 488.20 | 13 |
2005-09-25 | Perforation | 478.60 | 479.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2005 | 1104 | 0.0 | 0.0 | 0.0 |
2006 | 8701 | 0.0 | 0.0 | 0.0 |
2007 | 8079 | 0.0 | 0.0 | 0.0 |
2008 | 8783 | 0.0 | 0.0 | 0.0 |
2009 | 8135 | 0.0 | 0.0 | 0.0 |
2010 | 8500 | 0.0 | 0.0 | 0.0 |
2011 | 8727 | 0.0 | 0.0 | 0.0 |
2012 | 8548 | 0.0 | 0.0 | 0.0 |
2013 | 8331 | 0.0 | 0.0 | 0.0 |
2014 | 8664 | 0.0 | 0.0 | 0.0 |
2015 | 8621 | 0.0 | 0.0 | 0.0 |
2016 | 8649 | 0.0 | 0.0 | 0.0 |
2017 | 8572 | 0.0 | 0.0 | 0.0 |
2018 | 8666 | 0.0 | 0.0 | 0.0 |
2019 | 8640 | 0.0 | 0.0 | 0.0 |
2020 | 2176 | 0.0 | 0.0 | 0.0 |
For data sources see[5]