X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284222601000

Well Details

Well ID: 0284222601000
Loading map...
Location: 00/01-26-028-22W4/0
Location Alias: 00/01-26-28-22 W4M
Location Alias 2: 00/01-26-028-22 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 22
Section: 26
County/Municipality: Kneehill County
Well Name: ECA WAYNE 1-26-28-22
Operator Name: Lynx Energy ULC
License Number: 0273933
License Date: 2002-09-18
License Status: Issued
Spud Date: 2002-09-23
Final Drill Date: 2002-09-25
Well Total Depth: 1395.00 m
Surface Hole Latitude: 51.419302
Surface Hole Longitude: -112.987208

For data sources see[1][2]

Well History

Date Event
2002-09-18 Obtained License
2002-09-23 Surface Casing Operation Performed
2002-09-25 Finished Drilling
2002-09-26 Production Casing Operation Performed
2002-09-26 Rig Released
2002-09-26 Well Mode changed to Drilled and Cased
2002-10-04 Well Log Performed
2002-10-12 Perforation Treatment Performed - Jet Perforation
2002-10-12 Well Log Performed
2002-10-24 Perforation Treatment Performed - Fractured
2002-10-27 Well Fluid changed to Gas
2002-10-27 Well Mode changed to Testing
2003-02-12 Well Began Production
2003-02-12 Well Fluid changed to Gas
2003-02-12 Well Mode changed to Flowing
2006-10-29 Well Log Performed
2006-11-22 Perforation Treatment Performed - Jet Perforation
2006-12-01 Well Fluid changed to Gas
2006-12-01 Well Mode changed to Suspended
2006-12-08 Perforation Treatment Performed - Fractured
2007-01-13 Well Fluid changed to Gas
2007-01-13 Well Mode changed to Flowing
2009-10-23 Perforation Treatment Performed - Jet Perforation
2009-11-20 Perforation Treatment Performed - Fractured
2009-11-25 Well Fluid changed to Coalbed Methane-Coals and Other
2009-11-25 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2002-10-12 Perforation 1311.50 1313.50 14
2009-10-23 Perforation 433.60 434.10 13
2009-10-23 Perforation 431.00 431.50 13
2009-10-23 Perforation 407.00 407.50 13
2009-10-23 Perforation 399.60 400.10 13
2009-10-23 Perforation 345.60 347.60 13
2009-10-23 Perforation 326.00 330.00 13
2009-10-23 Perforation 304.30 306.30 13
2009-10-23 Perforation 300.30 302.30 13
2009-10-23 Perforation 295.60 296.10 13
2009-10-23 Perforation 290.10 290.60 13
2002-10-12 Perforation 1315.00 1317.00 14
2009-10-23 Perforation 286.50 287.50 13
2009-11-20 Fracture 286.50 736.40 0
2002-10-24 Fracture 1311.50 1317.00 0
2006-11-22 Perforation 753.50 755.50 13
2006-12-08 Fracture 753.50 755.50 0
2009-10-23 Perforation 735.40 736.40 13
2009-10-23 Perforation 711.50 712.00 13
2009-10-23 Perforation 473.00 473.50 13
2009-10-23 Perforation 469.40 469.90 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 7008 0.0 0.0 0.0
2004 8643 0.0 0.0 0.0
2005 8444 0.0 0.0 0.0
2006 7601 0.0 0.0 0.0
2007 8386 0.0 0.0 0.0
2008 8661 0.0 0.0 0.0
2009 8697 0.0 0.0 0.0
2010 8759 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8648 0.0 0.0 0.0
2014 8570 0.0 0.0 0.0
2015 8617 0.0 0.0 0.0
2016 8668 0.0 0.0 0.0
2017 8540 0.0 0.0 0.0
2018 8750 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References