X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0284110106000

Well Details

Well ID: 0284110106000
Loading map...
Location: 00/06-01-028-11W4/0
Location Alias: 00/06-01-28-11 W4M
Location Alias 2: 00/06-01-028-11 W4/00
Country: Canada
Province: Alberta
Township: 028
Meridian: 4
Range: 11
Section: 01
County/Municipality: Special Areas No. 2
Well Name: SIGNALTA STANMORE 6-1-28-11
Operator Name: Signalta Resources Limited
License Number: 0058698
License Date: 1976-06-15
License Status: Abandoned
Spud Date: 1976-06-21
Final Drill Date: 1976-06-25
Well Total Depth: 896.10 m
Surface Hole Latitude: 51.363984
Surface Hole Longitude: -111.424080

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-06-15 Obtained License
1976-06-25 Finished Drilling
1976-06-26 Drill Stem Test Performed
1976-06-27 Production Casing Operation Performed
1976-07-15 Well Mode changed to Drilled and Cased
1976-09-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-09-08 Perforation Treatment Performed - Jet Perforation
1977-05-10 Well Began Production
1977-05-10 Well Fluid changed to Gas
1977-05-10 Well Mode changed to Flowing
1998-01-20 Well Fluid changed to Gas
1998-01-20 Well Mode changed to Suspended
2000-07-22 Perforation Treatment Performed - Fractured
2000-08-01 Well Fluid changed to Gas
2000-08-01 Well Mode changed to Flowing
2009-04-30 Well Fluid changed to Gas
2009-04-30 Well Mode changed to Suspended
2012-02-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-15 Plug Back Performed
2012-02-15 Well Fluid changed to Gas
2012-02-15 Well Mode changed to Abandoned Zone
2012-02-16 Perforation Treatment Performed - Jet Perforation
2012-02-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-17 Perforation Treatment Performed - Remedial Casing
2012-02-19 Perforation Treatment Performed - Cement Plug
2012-02-19 Perforation Treatment Performed - Jet Perforation
2012-02-21 Perforation Treatment Performed - Cement Plug
2012-02-21 Perforation Treatment Performed - Remedial Casing
2012-02-23 Perforation Treatment Performed - Jet Perforation
2012-02-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-24 Perforation Treatment Performed - Remedial Casing
2012-02-26 Perforation Treatment Performed - Jet Perforation
2012-02-27 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-02-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-02-27 Perforation Treatment Performed - Remedial Casing
2012-02-29 Perforation Treatment Performed - Jet Perforation
2012-03-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-01 Perforation Treatment Performed - Remedial Casing
2012-03-08 Perforation Treatment Performed - Jet Perforation
2012-03-09 Perforation Treatment Performed - Remedial Casing
2012-03-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-03-13 Well Abandoned
2012-03-13 Well Fluid changed to Gas
2012-03-13 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-08 Perforation 885.10 887.00 7
2012-02-19 Cement Plug 510.00 518.00 0
2012-02-19 Perforation 270.00 271.00 14
2012-02-19 Perforation 254.00 255.00 14
2012-02-21 Remedial Casing Cementing 254.00 271.00 0
2012-02-21 Cement Plug 238.80 286.40 0
2012-02-23 Perforation 231.00 232.00 14
2012-02-24 Remedial Casing Cementing 231.00 232.00 0
2012-02-24 Packing Device Capped w/Cement 220.00 228.00 0
2012-02-26 Perforation 175.00 176.00 14
2012-02-27 Acid Treatment 175.00 176.00 0
1976-09-08 Perforation 877.80 879.70 7
2012-02-27 Remedial Casing Cementing 175.00 176.00 0
2012-02-27 Packing Device Capped w/Cement 164.00 172.00 0
2012-02-29 Perforation 115.00 116.00 14
2012-03-01 Remedial Casing Cementing 115.00 116.00 0
2012-03-01 Packing Device Capped w/Cement 104.00 112.00 0
2012-03-08 Perforation 100.50 101.50 14
2012-03-09 Remedial Casing Cementing 100.50 101.50 0
2012-03-12 Packing Device Capped w/Cement 89.00 97.00 0
1976-09-08 Acid Treatment 877.80 887.00 0
2000-07-22 Fracture 877.80 887.00 0
2012-02-15 Packing Device Capped w/Cement 862.00 870.00 0
2012-02-16 Perforation 598.00 599.00 13
2012-02-16 Perforation 525.00 526.00 13
2012-02-17 Remedial Casing Cementing 525.00 599.00 0
2012-02-17 Packing Device Capped w/Cement 518.00 614.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 4704 0.0 0.0 0.0
1978 5513 0.0 0.0 0.0
1979 6050 0.0 0.0 0.0
1980 4724 0.0 0.0 0.0
1981 4953 0.0 0.0 0.0
1982 4010 0.0 0.0 0.0
1983 5170 0.0 0.0 0.0
1984 6162 0.0 0.0 0.0
1985 5633 0.0 0.0 0.0
1986 5997 0.0 0.0 0.0
1987 3165 0.0 0.0 0.0
1988 6458 0.0 0.0 0.0
1989 7831 0.0 0.0 0.0
1990 4533 0.0 0.0 0.0
1991 2161 0.0 0.0 0.0
1992 8043 0.0 0.0 0.0
1993 8462 0.0 0.0 0.0
1994 7727 0.0 0.0 0.0
1995 8071 0.0 0.0 0.0
1996 5530 0.0 0.0 0.0
2000 3288 0.0 0.0 0.0
2001 8723 0.0 0.0 0.0
2002 8618 0.0 0.0 0.0
2003 8665 0.0 0.0 0.0
2004 8699 0.0 0.0 0.0
2005 8553 0.0 0.0 0.0
2006 5103 0.0 0.0 0.0
2007 7055 0.0 0.0 0.0
2008 5609 0.0 0.0 0.0
2009 2879 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-03-13 No Incident Encountered 0.00 0.00

For data sources see[6]

References