X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275053015000

Well Details

Well ID: 0275053015000
Loading map...
Location: 00/15-30-027-05W5/0
Location Alias: 00/15-30-27-05 W5M
Location Alias 2: 00/15-30-027-05 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 05
Section: 30
County/Municipality: Rocky View County
Well Name: Canlin WCATH 15-30-27-5
Operator Name: Canlin Energy Corporation
License Number: 0184816
License Date: 1996-01-19
License Status: Suspension
Spud Date: 1996-03-14
Final Drill Date: 1996-03-31
Well Total Depth: 1920.00 m
Surface Hole Latitude: 51.340499
Surface Hole Longitude: -114.698842

For data sources see[1][2]

Well History

Date Event
1996-01-19 Obtained License
1996-03-14 Well Log Performed
1996-03-17 Direction Drilling Operation Performed - Deviate
1996-03-17 Surface Casing Operation Performed
1996-03-31 Finished Drilling
1996-03-31 Well Mode changed to Drilled and Cased
1996-04-01 Well Log Performed
1996-04-03 Production Casing Operation Performed
1996-04-03 Rig Released
1996-04-03 Well Log Performed
1996-06-13 Perforation Treatment Performed - Jet Perforation
1996-06-15 Perforation Treatment Performed - Jet Perforation
1996-06-18 Perforation Treatment Performed - Jet Perforation
1996-06-20 Perforation Treatment Performed - Jet Perforation
1996-06-24 Perforation Treatment Performed - Jet Perforation
1996-07-09 Perforation Treatment Performed - Fractured
1997-07-11 Well Began Production
1997-07-11 Well Fluid changed to Gas
1997-07-11 Well Mode changed to Flowing
2003-10-31 Well Log Performed
2011-12-01 Well Fluid changed to Gas
2011-12-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-03-17 343.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1996-06-13 Perforation 1875.00 1887.00 18
1996-06-15 Perforation 1850.00 1854.00 18
1996-06-18 Perforation 1715.50 1717.50 18
1996-06-20 Perforation 1695.00 1696.00 18
1996-06-20 Perforation 1702.00 1704.00 18
1996-06-24 Perforation 1669.50 1671.00 18
1996-06-24 Perforation 1673.50 1674.00 18
1996-07-09 Fracture 1669.50 1671.00 0
1996-07-09 Fracture 1673.50 1674.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3733 0.0 0.0 0.0
1998 8249 0.0 0.0 0.0
1999 8499 0.0 0.0 0.0
2000 5731 0.0 0.0 0.0
2001 4665 0.0 0.0 0.0
2002 4112 0.0 0.0 0.0
2003 1429 0.0 0.0 0.0
2004 8470 0.0 0.0 0.0
2005 7813 0.0 0.0 0.0
2006 7696 0.0 0.0 0.0
2007 8110 0.0 0.0 0.0
2008 7130 0.0 0.0 0.0
2009 3425 0.0 0.0 0.0
2010 5396 0.0 0.0 0.0

For data sources see[6]

References