If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0275050505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.276186,"lon":-114.679208,"icon":""}]} |
Location: 00/05-05-027-05W5/0 | |
Location Alias: 00/05-05-27-05 W5M | |
Location Alias 2: 00/05-05-027-05 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 5 | |
Range: 05 | |
Section: 05 | |
County/Municipality: Rocky View County | |
Well Name: Canlin WCATH 5-5-27-5 | |
Operator Name: Canlin Energy Corporation | |
License Number: 0185777 | |
License Date: 1996-02-14 | |
License Status: Abandoned | |
Spud Date: 1996-04-17 | |
Final Drill Date: 1996-05-11 | |
Well Total Depth: 2445.00 m | |
Surface Hole Latitude: 51.276186 | |
Surface Hole Longitude: -114.679208 |
Date | Event |
---|---|
1996-02-14 | Obtained License |
1996-04-21 | Surface Casing Operation Performed |
1996-04-27 | Direction Drilling Operation Performed - Deviate |
1996-05-05 | Drill Stem Test Performed |
1996-05-11 | Finished Drilling |
1996-05-11 | Well Log Performed |
1996-05-14 | Production Casing Operation Performed |
1996-05-14 | Rig Released |
1996-05-14 | Well Mode changed to Drilled and Cased |
1996-07-04 | Well Log Performed |
1996-07-05 | Well Log Performed |
1996-07-06 | Perforation Treatment Performed - Jet Perforation |
1996-07-12 | Perforation Treatment Performed - Fractured |
1996-07-16 | Well Log Performed |
1996-07-17 | Well Log Performed |
1996-07-18 | Perforation Treatment Performed - Jet Perforation |
2002-10-11 | Perforation Treatment Performed - Cement Plug |
2002-10-11 | Perforation Treatment Performed - Cement Squeeze |
2002-10-11 | Plug Back Performed |
2002-10-11 | Well Mode changed to Abandoned Zone |
2002-10-17 | Perforation Treatment Performed - Jet Perforation |
2002-10-17 | Well Log Performed |
2002-10-18 | Perforation Treatment Performed - Cement Squeeze |
2002-10-20 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2002-10-20 | Perforation Treatment Performed - Cement Squeeze |
2002-10-24 | Perforation Treatment Performed - Cement Squeeze |
2002-10-24 | Perforation Treatment Performed - Jet Perforation |
2002-10-24 | Well Log Performed |
2003-07-10 | Perforation Treatment Performed - Jet Perforation |
2003-07-10 | Well Log Performed |
2003-07-11 | Perforation Treatment Performed - Cement Squeeze |
2003-07-15 | Perforation Treatment Performed - Jet Perforation |
2003-07-15 | Well Log Performed |
2003-07-16 | Perforation Treatment Performed - Cement Squeeze |
2003-07-22 | Perforation Treatment Performed - Jet Perforation |
2003-07-23 | Perforation Treatment Performed - Cement Squeeze |
2003-07-25 | Perforation Treatment Performed - Jet Perforation |
2003-07-26 | Perforation Treatment Performed - Cement Squeeze |
2004-06-30 | Perforation Treatment Performed - Cement Squeeze |
2004-06-30 | Perforation Treatment Performed - Jet Perforation |
2004-06-30 | Well Log Performed |
2005-06-23 | Well Log Performed |
2005-06-28 | Perforation Treatment Performed - Jet Perforation |
2005-06-28 | Well Log Performed |
2005-06-30 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2005-06-30 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-06-30 | Perforation Treatment Performed - Cement Squeeze |
2005-06-30 | Well Log Performed |
2005-07-04 | Perforation Treatment Performed - Jet Perforation |
2005-07-04 | Well Log Performed |
2005-07-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-05 | Perforation Treatment Performed - Cement Squeeze |
2005-07-13 | Perforation Treatment Performed - Jet Perforation |
2005-07-16 | Perforation Treatment Performed - Jet Perforation |
2005-07-16 | Well Log Performed |
2005-07-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2005-07-17 | Perforation Treatment Performed - Cement Squeeze |
2005-10-03 | Well Mode changed to Abandoned |
2005-10-05 | Well Abandoned |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1996-04-27 | 982.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1996-07-06 | Perforation | 2325.00 | 2326.00 | 18 |
2002-10-20 | Hydra Jet Perforation | 455.00 | 455.50 | 13 |
2002-10-20 | Cement Squeeze | 455.00 | 455.50 | 0 |
2002-10-24 | Perforation | 369.00 | 370.00 | 17 |
2002-10-24 | Cement Squeeze | 369.00 | 370.00 | 0 |
2003-07-10 | Perforation | 454.50 | 457.50 | 13 |
2003-07-11 | Cement Squeeze | 454.50 | 457.50 | 0 |
2003-07-15 | Perforation | 453.50 | 456.50 | 13 |
2003-07-16 | Cement Squeeze | 453.50 | 456.50 | 0 |
2003-07-22 | Perforation | 401.00 | 402.00 | 14 |
2003-07-22 | Perforation | 422.00 | 423.00 | 14 |
1996-07-06 | Perforation | 2327.50 | 2330.00 | 18 |
2003-07-23 | Cement Squeeze | 422.00 | 423.00 | 0 |
2003-07-23 | Cement Squeeze | 401.00 | 402.00 | 0 |
2003-07-25 | Perforation | 368.50 | 371.50 | 13 |
2003-07-25 | Perforation | 382.50 | 385.50 | 13 |
2003-07-26 | Cement Squeeze | 382.50 | 385.50 | 0 |
2003-07-26 | Cement Squeeze | 368.50 | 371.50 | 0 |
2004-06-30 | Perforation | 375.00 | 376.00 | 13 |
2004-06-30 | Perforation | 381.00 | 383.00 | 13 |
2004-06-30 | Cement Squeeze | 381.00 | 383.00 | 0 |
2004-06-30 | Cement Squeeze | 375.00 | 376.00 | 0 |
1996-07-12 | Fracture | 2325.00 | 2330.00 | 0 |
2005-06-28 | Perforation | 696.00 | 697.00 | 14 |
2005-06-28 | Perforation | 704.00 | 705.00 | 14 |
2005-06-30 | Acid Treatment | 696.00 | 705.00 | 0 |
2005-06-30 | Cement Squeeze | 704.00 | 705.00 | 0 |
2005-06-30 | Cement Squeeze | 696.00 | 697.00 | 0 |
2005-06-30 | Packing Device Capped w/Cement | 587.80 | 700.00 | 0 |
2005-07-04 | Perforation | 445.00 | 446.00 | 14 |
2005-07-04 | Perforation | 457.00 | 462.00 | 14 |
2005-07-05 | Cement Squeeze | 445.00 | 462.00 | 0 |
2005-07-05 | Packing Device Capped w/Cement | 418.10 | 432.00 | 0 |
1996-07-18 | Perforation | 2306.00 | 2308.00 | 18 |
2005-07-13 | Perforation | 403.00 | 404.00 | 14 |
2005-07-16 | Perforation | 411.00 | 414.00 | 14 |
2005-07-17 | Cement Squeeze | 411.00 | 414.00 | 0 |
2005-07-17 | Cement Squeeze | 403.00 | 404.00 | 0 |
2005-07-17 | Packing Device Capped w/Cement | 300.60 | 406.00 | 0 |
1996-07-18 | Perforation | 2309.00 | 2310.50 | 18 |
2002-10-11 | Cement Squeeze | 2306.00 | 2310.50 | 0 |
2002-10-11 | Cement Plug | 2134.00 | 2313.80 | 0 |
2002-10-17 | Perforation | 752.50 | 753.50 | 14 |
2002-10-18 | Cement Squeeze | 752.50 | 753.50 | 0 |
For data sources see[5]