X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275030801000

Well Details

Well ID: 0275030801000
Loading map...
Location: 00/01-08-027-03W5/0
Location Alias: 00/01-08-27-03 W5M
Location Alias 2: 00/01-08-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 08
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 1-8-27-3
Operator Name: Ridgeback Resources Inc.
License Number: 0433073
License Date: 2011-04-20
License Status: Issued
Spud Date: 2011-08-09
Final Drill Date: 2011-08-30
Well Total Depth: 3634.00 m
Surface Hole Latitude: 51.300809
Surface Hole Longitude: -114.382106

For data sources see[1][2]

Well History

Date Event
2011-04-20 Obtained License
2011-08-09 Well Log Performed
2011-08-13 Surface Casing Operation Performed
2011-08-15 Direction Drilling Operation Performed - Horizontal
2011-08-30 Finished Drilling
2011-08-30 Well Log Performed
2011-08-30 Well Mode changed to Drilled and Cased
2011-08-31 Production Casing Operation Performed
2011-09-02 Perforation Treatment Performed - Open-Hole Completion
2011-09-02 Rig Released
2011-09-09 Well Log Performed
2011-09-18 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-19 Perforation Treatment Performed - Multi-Stage Fracture
2011-09-19 Well Began Production
2011-09-19 Well Fluid changed to Crude Oil
2011-09-19 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-08-15 1908.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-02 Open Hole/Barefoot Completion 3587.00 3634.00 0
2011-09-19 Multi-Stage Fracture 3111.00 3111.10 0
2011-09-19 Multi-Stage Fracture 3059.80 3059.90 0
2011-09-19 Multi-Stage Fracture 2997.60 2997.70 0
2011-09-19 Multi-Stage Fracture 2935.00 2935.10 0
2011-09-19 Multi-Stage Fracture 2883.60 2883.70 0
2011-09-19 Multi-Stage Fracture 2821.50 2821.60 0
2011-09-19 Multi-Stage Fracture 2758.40 2758.50 0
2011-09-19 Multi-Stage Fracture 2696.60 2696.70 0
2011-09-19 Multi-Stage Fracture 2646.00 2646.10 0
2011-09-19 Multi-Stage Fracture 2595.10 2595.20 0
2011-09-18 Multi-Stage Fracture 3595.40 3595.50 0
2011-09-19 Multi-Stage Fracture 2532.20 2532.30 0
2011-09-19 Multi-Stage Fracture 2458.50 2458.60 0
2011-09-18 Multi-Stage Fracture 3526.00 3526.10 0
2011-09-18 Multi-Stage Fracture 3474.90 3475.00 0
2011-09-18 Multi-Stage Fracture 3412.30 3412.40 0
2011-09-18 Multi-Stage Fracture 3350.40 3350.50 0
2011-09-18 Multi-Stage Fracture 3288.00 3288.10 0
2011-09-18 Multi-Stage Fracture 3237.20 3237.30 0
2011-09-19 Multi-Stage Fracture 3174.10 3174.20 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 2226 0.0 0.0 0.0
2012 7629 0.0 0.0 0.0
2013 6702 0.0 0.0 0.0
2014 4927 0.0 0.0 0.0
2015 8643 0.0 0.0 0.0
2016 8757 0.0 0.0 0.0
2017 8713 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 5616 0.0 0.0 0.0

For data sources see[6]

References