If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0275030616000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.272738,"lon":-114.397983,"icon":""}]} |
| Location: 00/16-06-027-03W5/0 | |
| Location Alias: 00/16-06-27-03 W5M | |
| Location Alias 2: 00/16-06-027-03 W5/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 5 | |
| Range: 03 | |
| Section: 06 | |
| County/Municipality: Rocky View County | |
| Well Name: NAL LOCHEND 16-6-27-3 | |
| Operator Name: NAL Resources Limited | |
| License Number: 0446929 | |
| License Date: 2012-06-28 | |
| License Status: Issued | |
| Spud Date: 2012-09-27 | |
| Final Drill Date: 2012-10-14 | |
| Well Total Depth: 3660.00 m | |
| Surface Hole Latitude: 51.272738 | |
| Surface Hole Longitude: -114.397983 |
| Date | Event |
|---|---|
| 2012-06-28 | Obtained License |
| 2012-09-29 | Surface Casing Operation Performed |
| 2012-10-03 | Direction Drilling Operation Performed - Deviate |
| 2012-10-06 | Intermediate Casing Operation Performed |
| 2012-10-07 | Direction Drilling Operation Performed - Horizontal |
| 2012-10-07 | Well Log Performed |
| 2012-10-14 | Finished Drilling |
| 2012-10-14 | Liner Casing Operation Performed |
| 2012-10-14 | Well Mode changed to Drilled and Cased |
| 2012-10-15 | Perforation Treatment Performed - Open-Hole Completion |
| 2012-10-16 | Rig Released |
| 2012-11-02 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2012-12-04 | Well Began Production |
| 2012-12-04 | Well Fluid changed to Crude Oil |
| 2012-12-04 | Well Mode changed to Pumping |
For data sources see[3]
| Spud Date | Contractor | Rig Number | New Projected Depth (m) | Activity Type |
|---|---|---|---|---|
| 2012-09-27 | Savanna Drilling Corp. | 621 | N/A | Drill To LD |
For data sources see[4]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2012-10-03 | 2051.20 | Deviate (5 - 79 degrees) |
| 2012-10-07 | 2500.90 | Horizontal |
For data sources see[5]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2012-10-15 | Open Hole/Barefoot Completion | 3654.00 | 3660.00 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3077.50 | 3077.60 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3006.50 | 3006.60 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 2934.20 | 2934.30 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 2860.60 | 2860.70 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 2788.10 | 2788.20 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 2714.10 | 2714.20 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 2654.10 | 2654.20 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 2594.80 | 2594.90 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3636.40 | 3636.50 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3592.10 | 3592.20 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3520.40 | 3520.50 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3448.80 | 3448.90 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3375.00 | 3375.10 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3299.50 | 3299.60 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3225.30 | 3225.40 | 0 |
| 2012-11-02 | Multi-Stage Fracture | 3151.60 | 3151.70 | 0 |
For data sources see[6]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2012 | 25 | 0.0 | 0.0 | 0.0 |
| 2013 | 8098 | 0.0 | 0.0 | 0.0 |
| 2014 | 6989 | 0.0 | 0.0 | 0.0 |
| 2015 | 8741 | 0.0 | 0.0 | 0.0 |
| 2016 | 8648 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8600 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[7]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2012-10-16 | No Incident Encountered | 0.00 | 0.00 |
| 2012-10-26 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[8]