X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275030504000

Well Details

Well ID: 0275030504000
Loading map...
Location: 00/04-05-027-03W5/0
Location Alias: 00/04-05-27-03 W5M
Location Alias 2: 00/04-05-027-03 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 03
Section: 05
County/Municipality: Rocky View County
Well Name: RIDGEBACK LOCHEND 4-5-27-3
Operator Name: Ridgeback Resources Inc.
License Number: 0436429
License Date: 2011-08-30
License Status: Issued
Spud Date: 2011-10-15
Final Drill Date: 2011-11-02
Well Total Depth: 4140.00 m
Surface Hole Latitude: 51.288587
Surface Hole Longitude: -114.393415

For data sources see[1][2]

Well History

Date Event
2011-08-30 Obtained License
2011-10-18 Surface Casing Operation Performed
2011-10-21 Direction Drilling Operation Performed - Horizontal
2011-11-02 Finished Drilling
2011-11-02 Well Log Performed
2011-11-02 Well Mode changed to Drilled and Cased
2011-11-03 Well Log Performed
2011-11-04 Perforation Treatment Performed - Open-Hole Completion
2011-11-04 Production Casing Operation Performed
2011-11-04 Rig Released
2011-11-07 Well Log Performed
2011-11-14 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-15 Perforation Treatment Performed - Multi-Stage Fracture
2011-11-16 Well Began Production
2011-11-16 Well Fluid changed to Crude Oil
2011-11-16 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-10-21 1848.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-11-04 Open Hole/Barefoot Completion 4043.00 4140.00 0
2011-11-14 Multi-Stage Fracture 3454.60 3454.70 0
2011-11-14 Multi-Stage Fracture 3383.60 3383.70 0
2011-11-14 Multi-Stage Fracture 3325.40 3325.50 0
2011-11-14 Multi-Stage Fracture 3255.80 3255.90 0
2011-11-14 Multi-Stage Fracture 3185.30 3185.40 0
2011-11-15 Multi-Stage Fracture 3113.60 3113.70 0
2011-11-15 Multi-Stage Fracture 3055.30 3055.40 0
2011-11-15 Multi-Stage Fracture 2983.50 2983.60 0
2011-11-15 Multi-Stage Fracture 2912.00 2912.10 0
2011-11-15 Multi-Stage Fracture 2841.00 2841.10 0
2011-11-14 Multi-Stage Fracture 3998.90 3999.00 0
2011-11-15 Multi-Stage Fracture 2771.90 2772.00 0
2011-11-15 Multi-Stage Fracture 2713.60 2713.70 0
2011-11-14 Multi-Stage Fracture 3938.90 3939.00 0
2011-11-14 Multi-Stage Fracture 3867.10 3867.20 0
2011-11-14 Multi-Stage Fracture 3795.60 3795.70 0
2011-11-14 Multi-Stage Fracture 3723.90 3724.00 0
2011-11-14 Multi-Stage Fracture 3666.80 3666.90 0
2011-11-14 Multi-Stage Fracture 3595.10 3595.20 0
2011-11-14 Multi-Stage Fracture 3523.70 3523.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 544 0.0 0.0 0.0
2012 6953 0.0 0.0 0.0
2013 5841 0.0 0.0 0.0
2014 6954 0.0 0.0 0.0
2015 8715 0.0 0.0 0.0
2016 8744 0.0 0.0 0.0
2017 8653 0.0 0.0 0.0
2018 8637 0.0 0.0 0.0
2019 7728 0.0 0.0 0.0
2020 1944 0.0 0.0 0.0

For data sources see[6]

References