X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275021508002

Well Details

Well ID: 0275021508002
Loading map...
Location: 00/08-15-027-02W5/2
Location Alias: 00/08-15-27-02 W5M
Location Alias 2: 00/08-15-027-02 W5/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 02
Section: 15
County/Municipality: Rocky View County
Well Name: RISE CROSS 8-15-27-2
Operator Name: Bonavista Energy Corporation
License Number: 0055799
License Date: 1975-11-14
License Status: Suspension
Spud Date: 1975-11-20
Final Drill Date: 1975-12-12
Well Total Depth: 2651.80 m
Surface Hole Latitude: 51.304916
Surface Hole Longitude: -114.192944

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-11-14 Obtained License
1975-12-12 Finished Drilling
1975-12-12 Well Mode changed to Drilled and Cased
1975-12-14 Production Casing Operation Performed
1976-01-19 Perforation Treatment Performed - Jet Perforation
1997-06-28 Perforation Treatment Performed - Jet Perforation
1997-06-29 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-20 Perforation Treatment Performed - Jet Perforation
1998-06-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-06-30 Perforation Treatment Performed - Jet Perforation
1999-03-06 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-03-06 Perforation Treatment Performed - Cement Squeeze
1999-03-06 Plug Back Performed
1999-03-07 Perforation Treatment Performed - Jet Perforation
1999-03-07 Well Mode changed to Drilled and Cased
2000-11-21 Well Began Production
2000-11-21 Well Fluid changed to Gas
2000-11-21 Well Mode changed to Flowing
2012-02-01 Well Fluid changed to Gas
2012-02-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-19 Perforation 2599.90 2601.20 7
1999-03-07 Perforation 2585.30 2587.80 20
1997-06-28 Perforation 2603.30 2604.80 18
1997-06-29 Acid Treatment 2603.30 2604.80 0
1998-06-20 Perforation 2606.30 2608.50 17
1998-06-27 Acid Treatment 2603.30 2608.50 0
1998-06-30 Perforation 2594.50 2595.10 17
1998-06-30 Perforation 2596.60 2597.20 17
1999-03-06 Acid Treatment 2594.50 2601.20 0
1999-03-06 Cement Squeeze 2594.50 2601.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 829 0.0 0.0 0.0
2001 8020 0.0 0.0 0.0
2002 7648 0.0 0.0 0.0
2003 7926 0.0 0.0 0.0
2004 8775 0.0 0.0 0.0
2005 7371 0.0 0.0 0.0
2006 4600 0.0 0.0 0.0
2007 1563 0.0 0.0 0.0
2008 712 0.0 0.0 0.0

For data sources see[5]

References