X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275021108000

Well Details

Well ID: 0275021108000
Loading map...
Location: 00/08-11-027-02W5/0
Location Alias: 00/08-11-27-02 W5M
Location Alias 2: 00/08-11-027-02 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 02
Section: 11
County/Municipality: Rocky View County
Well Name: STAR ETAL CROSSFIELD 8-11-27-2
Operator Name: Bonavista Energy Corporation
License Number: 0024919
License Date: 1963-10-04
License Status: Suspension
Spud Date: 1963-10-11
Final Drill Date: 1963-11-14
Well Total Depth: 2642.60 m
Surface Hole Latitude: 51.291058
Surface Hole Longitude: -114.168852

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1963-10-04 Obtained License
1963-11-09 Drill Stem Test Performed
1963-11-14 Drill Stem Test Performed
1963-11-14 Finished Drilling
1963-11-14 Well Mode changed to Drilled and Cased
1963-11-15 Production Casing Operation Performed
1963-11-17 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-11-17 Perforation Treatment Performed - Selective Jet Perforations
1963-11-22 Well Began Production
1963-11-22 Well Fluid changed to Crude Oil
1963-11-22 Well Mode changed to Flowing
1981-07-09 Perforation Treatment Performed - Jet Perforation
1981-07-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1981-07-13 Perforation Treatment Performed - Cement Squeeze
2001-02-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2002-09-17 Well Fluid changed to Crude Oil
2002-09-17 Well Mode changed to Pumping
2005-06-03 Well Log Performed
2017-12-01 Well Fluid changed to Crude Oil
2017-12-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1963-11-17 Selective Jet Perforations 2614.30 2615.80 0
1963-11-17 Selective Jet Perforations 2617.00 2617.90 0
1963-11-17 Selective Jet Perforations 2618.50 2618.80 0
1963-11-17 Acid Treatment 2614.30 2618.80 0
1981-07-09 Perforation 2195.20 2203.10 13
1981-07-10 Acid Treatment 2195.20 2203.10 0
1981-07-13 Cement Squeeze 2195.20 2203.10 0
2001-02-24 Acid Treatment 2614.30 2618.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 648 0.0 0.0 0.0
1969 2973 0.0 0.0 0.0
1970 3878 0.0 0.0 0.0
1971 4835 0.0 0.0 0.0
1972 5955 0.0 0.0 0.0
1973 5022 0.0 0.0 0.0
1974 2297 0.0 0.0 0.0
1975 1564 0.0 0.0 0.0
1976 1644 0.0 0.0 0.0
1977 1473 0.0 0.0 0.0
1978 1522 0.0 0.0 0.0
1979 1578 0.0 0.0 0.0
1980 1207 0.0 0.0 0.0
1981 1646 0.0 0.0 0.0
1982 3187 0.0 0.0 0.0
1983 6486 0.0 0.0 0.0
1984 5557 0.0 0.0 0.0
1985 6054 0.0 0.0 0.0
1986 3936 0.0 0.0 0.0
1987 7294 0.0 0.0 0.0
1988 8719 0.0 0.0 0.0
1989 8394 0.0 0.0 0.0
1990 7542 0.0 0.0 0.0
1991 6829 0.0 0.0 0.0
1992 8151 0.0 0.0 0.0
1993 8138 0.0 0.0 0.0
1994 8324 0.0 0.0 0.0
1995 8697 0.0 0.0 0.0
1996 8259 0.0 0.0 0.0
1997 8536 0.0 0.0 0.0
1998 8052 0.0 0.0 0.0
1999 7477 0.0 0.0 0.0
2000 8268 0.0 0.0 0.0
2001 7433 0.0 0.0 0.0
2002 8286 0.0 0.0 0.0
2003 8138 0.0 0.0 0.0
2004 8084 0.0 0.0 0.0
2005 8334 0.0 0.0 0.0
2006 8479 0.0 0.0 0.0
2007 8081 0.0 0.0 0.0
2008 7745 0.0 0.0 0.0
2009 5591 0.0 0.0 0.0
2010 3989 0.0 0.0 0.0
2011 4834 0.0 0.0 0.0
2012 7946 0.0 0.0 0.0
2013 7120 0.0 0.0 0.0
2014 6090 0.0 0.0 0.0
2015 5683 0.0 0.0 0.0
2016 4135 0.0 0.0 0.0

For data sources see[5]

References