X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0275021105000

Well Details

Well ID: 0275021105000
Loading map...
Location: 00/05-11-027-02W5/0
Location Alias: 00/05-11-27-02 W5M
Location Alias 2: 00/05-11-027-02 W5/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 5
Range: 02
Section: 11
County/Municipality: Rocky View County
Well Name: HUSKY ET AL CROSSFIELD 5-11-27-2
Operator Name: Husky Oil Operations Limited
License Number: 0072811
License Date: 1978-11-06
License Status: RecCertified
Spud Date: 1978-11-13
Final Drill Date: 1978-12-13
Well Total Depth: 2665.00 m
Surface Hole Latitude: 51.290554
Surface Hole Longitude: -114.183412

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-11-06 Obtained License
1978-12-13 Finished Drilling
1978-12-13 Well Mode changed to Drilled and Cased
1978-12-20 Production Casing Operation Performed
1979-01-22 Perforation Treatment Performed - Jet Perforation
1979-02-07 Well Began Production
1979-02-07 Well Fluid changed to Crude Oil
1979-02-07 Well Mode changed to Pumping
1979-12-08 Perforation Treatment Performed - Jet Perforation
1979-12-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-12 Perforation Treatment Performed - Cement Squeeze
1979-12-18 Perforation Treatment Performed - Jet Perforation
1979-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-01-14 Well Fluid changed to Crude Oil
1984-01-14 Well Mode changed to Suspended
1988-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1988-05-26 Plug Back Performed
1988-05-26 Well Abandoned
1988-05-26 Well Fluid changed to Crude Oil
1988-05-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-01-22 Perforation 2616.00 2620.00 7
1979-12-08 Perforation 2605.00 2612.50 6
1979-12-12 Acid Treatment 2605.00 2620.00 0
1979-12-12 Cement Squeeze 2605.00 2620.00 0
1979-12-18 Perforation 2616.00 2620.00 7
1979-12-20 Acid Treatment 2616.00 2620.00 0
1979-12-28 Acid Treatment 2616.00 2620.00 0
1988-05-26 Packing Device Capped w/Cement 2547.00 2555.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 864 0.0 0.0 0.0
1980 4740 0.0 0.0 0.0
1981 4894 0.0 0.0 0.0
1982 7408 0.0 0.0 0.0
1983 8210 0.0 0.0 0.0
1984 327 0.0 0.0 0.0

For data sources see[5]

References