If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274283406000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.357144,"lon":-113.871837,"icon":""}]} |
| Location: 00/06-34-027-28W4/0 | |
| Location Alias: 00/06-34-27-28 W4M | |
| Location Alias 2: 00/06-34-027-28 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 34 | |
| County/Municipality: Rocky View County | |
| Well Name: HARVEST HZ CROSSE 6-34-27-28 | |
| Operator Name: Harvest Operations Corp. | |
| License Number: 0426079 | |
| License Date: 2010-11-19 | |
| License Status: Suspension | |
| Spud Date: 2011-01-16 | |
| Final Drill Date: 2011-02-13 | |
| Well Total Depth: 3205.00 m | |
| Surface Hole Latitude: 51.357144 | |
| Surface Hole Longitude: -113.871837 |
| Date | Event |
|---|---|
| 2010-11-19 | Obtained License |
| 2011-01-17 | Surface Casing Operation Performed |
| 2011-01-21 | Well Log Performed |
| 2011-01-22 | Direction Drilling Operation Performed - Horizontal |
| 2011-02-13 | Finished Drilling |
| 2011-02-13 | Well Log Performed |
| 2011-02-13 | Well Mode changed to Drilled and Cased |
| 2011-02-14 | Production Casing Operation Performed |
| 2011-02-15 | Rig Released |
| 2011-02-22 | Well Log Performed |
| 2011-02-25 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-27 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-11 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-12 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-03-13 | Perforation Treatment Performed - Multi-Stage Fracture |
| 2011-08-12 | Well Began Production |
| 2011-08-12 | Well Fluid changed to Crude Oil |
| 2011-08-12 | Well Mode changed to Pumping |
| 2019-10-01 | Well Fluid changed to Crude Oil |
| 2019-10-01 | Well Mode changed to Suspended |
| 2019-10-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
| 2019-10-22 | Plug Back Performed |
| 2019-10-22 | Well Fluid changed to Crude Oil |
| 2019-10-22 | Well Mode changed to Abandoned Zone |
| 2019-10-26 | Perforation Treatment Performed - Jet Perforation |
| 2019-10-27 | Perforation Treatment Performed - Cement Squeeze |
| 2019-10-28 | Perforation Treatment Performed - Cement Plug |
| 2019-10-28 | Plug Back Performed |
For data sources see[3]
| Start Date | Depth (m) | Reason |
|---|---|---|
| 2011-01-22 | 1860.00 | Horizontal |
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-25 | Perforation | 3176.00 | 3177.00 | 17 |
| 2011-03-13 | Multi-Stage Fracture | 2217.00 | 2217.10 | 0 |
| 2019-10-22 | Packing Device Capped w/Cement | 2116.00 | 2140.00 | 0 |
| 2019-10-26 | Perforation | 450.00 | 460.00 | 8 |
| 2019-10-27 | Cement Squeeze | 450.00 | 460.00 | 0 |
| 2019-10-28 | Cement Plug | 408.40 | 476.00 | 0 |
| 2011-02-27 | Multi-Stage Fracture | 3113.00 | 3113.10 | 0 |
| 2011-02-27 | Multi-Stage Fracture | 3067.00 | 3067.10 | 0 |
| 2011-03-11 | Multi-Stage Fracture | 2947.00 | 2947.10 | 0 |
| 2011-03-11 | Multi-Stage Fracture | 2825.00 | 2825.10 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 2703.00 | 2703.10 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 2582.00 | 2582.10 | 0 |
| 2011-03-12 | Multi-Stage Fracture | 2460.00 | 2460.10 | 0 |
| 2011-03-13 | Multi-Stage Fracture | 2339.00 | 2339.10 | 0 |
For data sources see[5]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 72 | 0.0 | 0.0 | 0.0 |
| 2012 | 6383 | 0.0 | 0.0 | 0.0 |
| 2013 | 7463 | 0.0 | 0.0 | 0.0 |
| 2014 | 8147 | 0.0 | 0.0 | 0.0 |
| 2015 | 8005 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8343 | 0.0 | 0.0 | 0.0 |
| 2018 | 5567 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2019-10-29 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]