X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274282502004

Well Details

Well ID: 0274282502004
Loading map...
Location: 00/02-25-027-28W4/4
Location Alias: 00/02-25-27-28 W4M
Location Alias 2: 00/02-25-027-28 W4/04
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 28
Section: 25
County/Municipality: Rocky View County
Well Name: EMBER 2A CROSS 2-25-27-28
Operator Name: Ember Resources Inc.
License Number: 0204529
License Date: 1997-08-06
License Status: Issued
Spud Date: 1997-09-25
Final Drill Date: 1997-10-13
Well Total Depth: 2160.00 m
Surface Hole Latitude: 51.329434
Surface Hole Longitude: -113.809492

For data sources see[1][2]

Well History

Date Event
1997-08-06 Obtained License
1997-09-28 Surface Casing Operation Performed
1997-09-30 Direction Drilling Operation Performed - Deviate
1997-10-02 Well Log Performed
1997-10-13 Finished Drilling
1997-10-13 Well Log Performed
1997-10-13 Well Mode changed to Drilled and Cased
1997-10-14 Lost Circulation Occurred
1997-10-14 Production Casing Operation Performed
1997-10-15 Rig Released
1997-10-17 Well Log Performed
1997-11-01 Well Log Performed
1997-11-02 Well Log Performed
1997-11-03 Perforation Treatment Performed - Jet Perforation
1997-11-06 Perforation Treatment Performed - Fractured
1999-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-23 Perforation Treatment Performed - Jet Perforation
1999-11-23 Plug Back Performed
1999-11-24 Well Log Performed
1999-11-28 Perforation Treatment Performed - Fractured
2002-02-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-02-01 Perforation Treatment Performed - Jet Perforation
2002-02-01 Plug Back Performed
2002-03-18 Perforation Treatment Performed - Fractured
2002-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-06-18 Plug Back Performed
2002-06-19 Well Log Performed
2004-05-03 Perforation Treatment Performed - Jet Perforation
2004-05-04 Well Log Performed
2004-05-15 Well Fluid changed to Gas
2004-05-15 Well Mode changed to Testing
2004-08-03 Perforation Treatment Performed - Jet Perforation
2004-08-03 Well Log Performed
2004-08-05 Perforation Treatment Performed - Remedial Casing
2007-11-16 Well Began Production
2007-11-16 Well Fluid changed to Gas
2007-11-16 Well Mode changed to Flowing
2010-02-19 Perforation Treatment Performed - Jet Perforation
2010-02-27 Perforation Treatment Performed - Fractured
2010-03-11 Well Fluid changed to Coalbed Methane-Coals and Other
2010-03-11 Well Mode changed to Flowing
2011-03-29 Well Fluid changed to Coalbed Methane-Coals and Other
2011-03-29 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-30 1466.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-11-03 Perforation 2142.50 2148.50 20
2004-05-03 Perforation 1150.50 1153.50 13
2004-08-03 Perforation 574.00 575.00 17
2004-08-05 Remedial Casing Cementing 574.00 575.00 0
2010-02-19 Perforation 828.60 829.10 13
2010-02-19 Perforation 811.00 812.00 13
2010-02-19 Perforation 800.90 801.40 13
2010-02-19 Perforation 797.00 798.00 13
2010-02-19 Perforation 794.40 795.40 13
2010-02-19 Perforation 792.30 792.80 13
2010-02-19 Perforation 776.20 776.70 13
1997-11-06 Fracture 2142.50 2148.50 0
2010-02-19 Perforation 770.00 770.50 13
2010-02-19 Perforation 761.10 763.10 13
2010-02-19 Perforation 742.40 743.40 13
2010-02-19 Perforation 731.70 732.20 13
2010-02-19 Perforation 729.20 729.70 13
2010-02-19 Perforation 667.10 667.60 13
2010-02-19 Perforation 591.60 592.10 13
2010-02-19 Perforation 457.90 458.40 13
2010-02-19 Perforation 404.00 404.50 13
2010-02-19 Perforation 390.40 390.90 13
1999-11-23 Packing Device Capped w/Cement 2132.00 2141.00 0
2010-02-27 Fracture 390.40 829.10 0
1999-11-23 Perforation 2116.00 2118.00 16
1999-11-28 Fracture 2116.00 2118.00 0
2002-02-01 Packing Device Capped w/Cement 2099.00 2107.00 0
2002-02-01 Perforation 1790.50 1792.00 17
2002-03-18 Fracture 1790.50 1792.00 0
2002-06-18 Packing Device Capped w/Cement 1777.00 1785.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2007 1066 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 7621 0.0 0.0 0.0
2011 7397 0.0 0.0 0.0
2012 8759 0.0 0.0 0.0
2013 8748 0.0 0.0 0.0
2014 8543 0.0 0.0 0.0
2015 6912 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8534 0.0 0.0 0.0
2018 8524 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1997-10-14 Lost Circulation 2160.00 2160.00

For data sources see[7]

References