If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274281308003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.305745,"lon":-113.806989,"icon":""}]} |
| Location: 00/08-13-027-28W4/3 | |
| Location Alias: 00/08-13-27-28 W4M | |
| Location Alias 2: 00/08-13-027-28 W4/03 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 28 | |
| Section: 13 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER CROSS 8-13-27-28 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0370067 | |
| License Date: 2006-12-22 | |
| License Status: Issued | |
| Spud Date: 2007-12-16 | |
| Final Drill Date: 2007-12-17 | |
| Well Total Depth: 962.00 m | |
| Surface Hole Latitude: 51.305745 | |
| Surface Hole Longitude: -113.806989 |
| Date | Event |
|---|---|
| 2006-12-22 | Obtained License |
| 2007-12-16 | Surface Casing Operation Performed |
| 2007-12-17 | Finished Drilling |
| 2007-12-17 | Production Casing Operation Performed |
| 2007-12-17 | Rig Released |
| 2007-12-17 | Well Mode changed to Drilled and Cased |
| 2007-12-29 | Well Log Performed |
| 2008-01-22 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-06 | Perforation Treatment Performed - Fractured |
| 2008-08-15 | Perforation Treatment Performed - Jet Perforation |
| 2008-10-28 | Perforation Treatment Performed - Fractured |
| 2010-02-05 | Perforation Treatment Performed - Jet Perforation |
| 2010-02-19 | Perforation Treatment Performed - Fractured |
| 2010-02-22 | Well Fluid changed to Gas |
| 2010-02-22 | Well Mode changed to Testing |
| 2010-02-27 | Perforation Treatment Performed - Jet Perforation |
| 2010-03-15 | Well Began Production |
| 2010-03-15 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2010-03-15 | Well Mode changed to Flowing |
| 2010-05-17 | Well Log Performed |
| 2010-05-19 | Well Log Performed |
| 2010-05-22 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-01-22 | Perforation | 764.00 | 767.00 | 13 |
| 2010-02-27 | Perforation | 803.10 | 803.60 | 13 |
| 2010-02-27 | Perforation | 798.60 | 799.10 | 13 |
| 2010-02-27 | Perforation | 785.90 | 786.90 | 13 |
| 2010-02-27 | Perforation | 752.60 | 753.10 | 13 |
| 2010-02-27 | Perforation | 743.50 | 744.50 | 13 |
| 2010-02-27 | Perforation | 729.10 | 730.10 | 13 |
| 2010-02-27 | Perforation | 719.20 | 719.70 | 13 |
| 2010-02-27 | Perforation | 718.00 | 718.50 | 13 |
| 2010-02-27 | Perforation | 651.00 | 651.50 | 13 |
| 2010-02-27 | Perforation | 525.10 | 525.60 | 13 |
| 2008-02-06 | Fracture | 764.00 | 767.00 | 0 |
| 2010-02-27 | Perforation | 497.90 | 498.40 | 13 |
| 2010-02-27 | Perforation | 455.70 | 456.20 | 13 |
| 2010-02-27 | Perforation | 647.00 | 648.00 | 13 |
| 2010-02-27 | Perforation | 627.00 | 630.00 | 13 |
| 2010-02-27 | Perforation | 616.00 | 618.00 | 13 |
| 2010-02-27 | Perforation | 599.00 | 602.00 | 13 |
| 2010-02-27 | Perforation | 485.00 | 487.00 | 13 |
| 2010-02-27 | Perforation | 464.00 | 466.00 | 13 |
| 2010-02-27 | Perforation | 459.00 | 461.00 | 13 |
| 2010-02-27 | Perforation | 407.00 | 410.00 | 13 |
| 2008-08-15 | Perforation | 710.00 | 714.00 | 13 |
| 2010-02-27 | Perforation | 386.00 | 388.00 | 13 |
| 2010-05-22 | Fracture | 455.70 | 822.00 | 0 |
| 2010-05-22 | Fracture | 386.00 | 648.00 | 0 |
| 2008-08-15 | Perforation | 704.50 | 708.50 | 13 |
| 2008-10-28 | Fracture | 704.50 | 714.00 | 0 |
| 2010-02-05 | Perforation | 886.00 | 889.00 | 13 |
| 2010-02-19 | Fracture | 886.00 | 889.00 | 0 |
| 2010-02-27 | Perforation | 821.50 | 822.00 | 13 |
| 2010-02-27 | Perforation | 812.00 | 812.50 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2010 | 6564 | 0.0 | 0.0 | 0.0 |
| 2011 | 8753 | 0.0 | 0.0 | 0.0 |
| 2012 | 8446 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]