If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274280916000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.291511,"lon":-113.878995,"icon":""}]} |
Location: 00/16-09-027-28W4/0 | |
Location Alias: 00/16-09-27-28 W4M | |
Location Alias 2: 00/16-09-027-28 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 09 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 16-9-27-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0409944 | |
License Date: 2009-03-27 | |
License Status: Amended | |
Spud Date: 2009-11-26 | |
Final Drill Date: 2009-11-28 | |
Well Total Depth: 1579.30 m | |
Surface Hole Latitude: 51.291511 | |
Surface Hole Longitude: -113.878995 |
Date | Event |
---|---|
2009-03-27 | Obtained License |
2009-11-26 | Direction Drilling Operation Performed - Deviate |
2009-11-27 | Surface Casing Operation Performed |
2009-11-28 | Finished Drilling |
2009-11-28 | Well Mode changed to Drilled and Cased |
2009-11-29 | Production Casing Operation Performed |
2009-11-29 | Rig Released |
2009-12-11 | Well Log Performed |
2010-01-11 | Perforation Treatment Performed - Jet Perforation |
2010-02-02 | Well Fluid changed to Gas |
2010-02-02 | Well Mode changed to Testing |
2010-07-09 | Perforation Treatment Performed - Fractured |
2010-07-27 | Well Began Production |
2010-07-27 | Well Fluid changed to Gas |
2010-07-27 | Well Mode changed to Flowing |
2011-10-21 | Perforation Treatment Performed - Jet Perforation |
2011-10-27 | Perforation Treatment Performed - Fractured |
2011-11-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-11-09 | Well Mode changed to Flowing |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2009-11-26 | 0.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-11 | Perforation | 1526.50 | 1527.50 | 13 |
2011-10-21 | Perforation | 637.00 | 638.50 | 13 |
2011-10-21 | Perforation | 684.50 | 685.00 | 13 |
2011-10-21 | Perforation | 715.90 | 716.40 | 13 |
2011-10-21 | Perforation | 767.80 | 768.80 | 13 |
2011-10-21 | Perforation | 852.00 | 852.50 | 13 |
2011-10-21 | Perforation | 858.50 | 860.50 | 13 |
2011-10-21 | Perforation | 943.70 | 944.20 | 13 |
2011-10-21 | Perforation | 947.50 | 948.00 | 13 |
2011-10-21 | Perforation | 1004.00 | 1004.50 | 13 |
2011-10-21 | Perforation | 1029.50 | 1030.00 | 13 |
2010-01-11 | Perforation | 1001.00 | 1002.00 | 13 |
2011-10-21 | Perforation | 1033.70 | 1034.20 | 13 |
2011-10-21 | Perforation | 1049.50 | 1050.00 | 13 |
2011-10-21 | Perforation | 1070.10 | 1072.10 | 13 |
2011-10-21 | Perforation | 1080.60 | 1081.10 | 13 |
2011-10-21 | Perforation | 1090.30 | 1090.80 | 13 |
2011-10-21 | Perforation | 1110.80 | 1111.80 | 13 |
2011-10-21 | Perforation | 1115.40 | 1116.40 | 13 |
2011-10-21 | Perforation | 1119.50 | 1120.00 | 13 |
2011-10-21 | Perforation | 1130.60 | 1131.10 | 13 |
2011-10-21 | Perforation | 1134.90 | 1135.40 | 13 |
2010-01-11 | Perforation | 902.00 | 904.00 | 13 |
2011-10-21 | Perforation | 1136.30 | 1138.30 | 13 |
2011-10-21 | Perforation | 1150.60 | 1151.10 | 13 |
2011-10-21 | Perforation | 1155.10 | 1155.60 | 13 |
2011-10-21 | Perforation | 1163.00 | 1163.50 | 13 |
2011-10-27 | Fracture | 599.80 | 1163.50 | 0 |
2010-07-09 | Fracture | 1526.50 | 1527.50 | 0 |
2010-07-09 | Fracture | 1001.00 | 1002.00 | 0 |
2011-10-21 | Perforation | 599.80 | 600.30 | 13 |
2011-10-21 | Perforation | 614.30 | 614.80 | 13 |
2011-10-21 | Perforation | 616.80 | 617.30 | 13 |
2011-10-21 | Perforation | 618.10 | 618.60 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 3840 | 0.0 | 0.0 | 0.0 |
2011 | 7773 | 0.0 | 0.0 | 0.0 |
2012 | 5449 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[6]