If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274280910002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.291511,"lon":-113.878675,"icon":""}]} |
Location: 00/10-09-027-28W4/2 | |
Location Alias: 00/10-09-27-28 W4M | |
Location Alias 2: 00/10-09-027-28 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 28 | |
Section: 09 | |
County/Municipality: Rocky View County | |
Well Name: EMBER CROSS 10-9-27-28 | |
Operator Name: Ember Resources Inc. | |
License Number: 0409787 | |
License Date: 2009-03-18 | |
License Status: Amended | |
Spud Date: 2009-11-21 | |
Final Drill Date: 2009-12-08 | |
Well Total Depth: 1279.00 m | |
Surface Hole Latitude: 51.291511 | |
Surface Hole Longitude: -113.878675 |
Date | Event |
---|---|
2009-03-18 | Obtained License |
2009-11-21 | Surface Casing Operation Performed |
2009-12-08 | Finished Drilling |
2009-12-08 | Production Casing Operation Performed |
2009-12-08 | Rig Released |
2009-12-08 | Well Mode changed to Drilled and Cased |
2009-12-12 | Well Log Performed |
2010-01-19 | Perforation Treatment Performed - Jet Perforation |
2010-02-12 | Perforation Treatment Performed - Jet Perforation |
2010-02-20 | Perforation Treatment Performed - Fractured |
2010-03-03 | Well Began Production |
2010-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2010-03-03 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2010-01-19 | Perforation | 744.00 | 747.00 | 13 |
2010-02-12 | Perforation | 493.00 | 493.50 | 14 |
2010-02-12 | Perforation | 673.00 | 675.00 | 14 |
2010-02-12 | Perforation | 801.00 | 802.00 | 14 |
2010-02-12 | Perforation | 517.00 | 518.00 | 14 |
2010-02-12 | Perforation | 633.00 | 634.00 | 14 |
2010-02-12 | Perforation | 481.70 | 482.20 | 14 |
2010-02-12 | Perforation | 486.00 | 486.50 | 14 |
2010-02-12 | Perforation | 827.00 | 828.00 | 14 |
2010-02-12 | Perforation | 480.30 | 480.80 | 14 |
2010-02-12 | Perforation | 758.00 | 758.50 | 14 |
2010-02-12 | Perforation | 555.40 | 555.90 | 14 |
2010-02-12 | Perforation | 904.30 | 905.30 | 14 |
2010-02-12 | Perforation | 908.80 | 909.30 | 14 |
2010-02-12 | Perforation | 884.40 | 884.90 | 14 |
2010-02-12 | Perforation | 900.00 | 901.00 | 14 |
2010-02-12 | Perforation | 923.50 | 924.50 | 14 |
2010-02-12 | Perforation | 943.00 | 943.50 | 14 |
2010-02-12 | Perforation | 920.40 | 920.90 | 14 |
2010-02-12 | Perforation | 921.80 | 922.30 | 14 |
2010-02-12 | Perforation | 875.50 | 876.00 | 14 |
2010-02-12 | Perforation | 773.00 | 773.50 | 14 |
2010-02-12 | Perforation | 623.30 | 623.80 | 14 |
2010-02-12 | Perforation | 814.20 | 814.70 | 14 |
2010-02-12 | Perforation | 766.90 | 767.40 | 14 |
2010-02-12 | Perforation | 769.80 | 770.30 | 14 |
2010-02-12 | Perforation | 834.00 | 834.50 | 14 |
2010-02-12 | Perforation | 850.20 | 850.70 | 14 |
2010-02-12 | Perforation | 867.00 | 869.00 | 14 |
2010-02-12 | Perforation | 836.80 | 837.30 | 14 |
2010-02-20 | Fracture | 480.30 | 943.50 | 0 |
2010-02-12 | Perforation | 495.90 | 496.40 | 14 |
2010-02-12 | Perforation | 497.60 | 498.10 | 14 |
2010-02-12 | Perforation | 689.00 | 689.50 | 14 |
2010-02-12 | Perforation | 718.00 | 720.00 | 14 |
2010-02-12 | Perforation | 641.50 | 642.00 | 14 |
2010-02-12 | Perforation | 643.20 | 644.20 | 14 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2010 | 7280 | 0.0 | 0.0 | 0.0 |
2011 | 8013 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8723 | 0.0 | 0.0 | 0.0 |
2016 | 8690 | 0.0 | 0.0 | 0.0 |
2017 | 8690 | 0.0 | 0.0 | 0.0 |
2018 | 8622 | 0.0 | 0.0 | 0.0 |
2019 | 8540 | 0.0 | 0.0 | 0.0 |
2020 | 2167 | 0.0 | 0.0 | 0.0 |
For data sources see[5]