If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274273116000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.357351,"lon":-113.78204,"icon":""}]} |
Location: 00/16-31-027-27W4/0 | |
Location Alias: 00/16-31-27-27 W4M | |
Location Alias 2: 00/16-31-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 31 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 16-31-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0332822 | |
License Date: 2005-06-13 | |
License Status: Issued | |
Spud Date: 2005-11-18 | |
Final Drill Date: 2006-02-13 | |
Well Total Depth: 973.00 m | |
Surface Hole Latitude: 51.357351 | |
Surface Hole Longitude: -113.782040 |
Date | Event |
---|---|
2005-06-13 | Obtained License |
2005-11-18 | Surface Casing Operation Performed |
2005-12-01 | Well Log Performed |
2006-02-13 | Finished Drilling |
2006-02-13 | Production Casing Operation Performed |
2006-02-13 | Rig Released |
2006-02-13 | Well Mode changed to Drilled and Cased |
2006-02-19 | Well Log Performed |
2006-03-11 | Perforation Treatment Performed - Jet Perforation |
2006-03-25 | Well Fluid changed to Gas |
2006-03-25 | Well Mode changed to Testing |
2006-06-03 | Perforation Treatment Performed - Fractured |
2006-12-20 | Well Began Production |
2006-12-20 | Well Fluid changed to Gas |
2006-12-20 | Well Mode changed to Flowing |
2007-12-19 | Perforation Treatment Performed - Jet Perforation |
2008-01-19 | Perforation Treatment Performed - Fractured |
2008-02-06 | Perforation Treatment Performed - Jet Perforation |
2008-02-20 | Perforation Treatment Performed - Fractured |
2008-03-03 | Well Fluid changed to Coalbed Methane-Coals and Other |
2008-03-03 | Well Mode changed to Flowing |
2009-09-11 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2006-03-11 | Perforation | 883.00 | 885.00 | 13 |
2008-02-06 | Perforation | 777.70 | 778.70 | 13 |
2008-02-06 | Perforation | 774.50 | 775.50 | 13 |
2008-02-06 | Perforation | 772.60 | 773.10 | 13 |
2008-02-06 | Perforation | 755.70 | 756.20 | 13 |
2008-02-06 | Perforation | 750.80 | 751.30 | 13 |
2008-02-06 | Perforation | 741.10 | 742.10 | 13 |
2008-02-06 | Perforation | 710.70 | 711.20 | 13 |
2008-02-06 | Perforation | 706.30 | 706.80 | 13 |
2008-02-06 | Perforation | 681.40 | 681.90 | 13 |
2008-02-06 | Perforation | 658.50 | 659.00 | 13 |
2006-06-03 | Fracture | 883.00 | 885.00 | 0 |
2008-02-06 | Perforation | 650.30 | 650.80 | 13 |
2008-02-06 | Perforation | 645.00 | 645.50 | 13 |
2008-02-06 | Perforation | 641.40 | 641.90 | 13 |
2008-02-06 | Perforation | 517.20 | 517.70 | 13 |
2008-02-06 | Perforation | 513.30 | 513.80 | 13 |
2008-02-06 | Perforation | 506.00 | 506.50 | 13 |
2008-02-06 | Perforation | 475.20 | 475.70 | 13 |
2008-02-06 | Perforation | 346.50 | 348.50 | 13 |
2008-02-20 | Fracture | 346.50 | 348.50 | 0 |
2008-02-20 | Fracture | 475.20 | 822.80 | 0 |
2007-12-19 | Perforation | 346.50 | 348.50 | 13 |
2008-01-19 | Fracture | 346.50 | 348.50 | 0 |
2008-02-06 | Perforation | 822.30 | 822.80 | 13 |
2008-02-06 | Perforation | 813.90 | 814.90 | 13 |
2008-02-06 | Perforation | 796.40 | 796.90 | 13 |
2008-02-06 | Perforation | 783.50 | 784.00 | 13 |
2008-02-06 | Perforation | 782.60 | 783.10 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 384 | 0.0 | 0.0 | 0.0 |
2008 | 4416 | 0.0 | 0.0 | 0.0 |
2009 | 8759 | 0.0 | 0.0 | 0.0 |
2010 | 8743 | 0.0 | 0.0 | 0.0 |
2011 | 8742 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8756 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]