X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274272707000

Well Details

Well ID: 0274272707000
Loading map...
Location: 00/07-27-027-27W4/0
Location Alias: 00/07-27-27-27 W4M
Location Alias 2: 00/07-27-027-27 W4/00
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 27
County/Municipality: Rocky View County
Well Name: EMBER 7D ENTICE 7-27-27-27
Operator Name: Ember Resources Inc.
License Number: 0228954
License Date: 1999-11-20
License Status: Issued
Spud Date: 1999-12-15
Final Drill Date: 1999-12-17
Well Total Depth: 1147.00 m
Surface Hole Latitude: 51.335765
Surface Hole Longitude: -113.715293

For data sources see[1][2]

Well History

Date Event
1999-11-20 Obtained License
1999-12-16 Surface Casing Operation Performed
1999-12-17 Finished Drilling
1999-12-18 Production Casing Operation Performed
1999-12-18 Rig Released
1999-12-18 Well Mode changed to Drilled and Cased
2000-01-02 Well Log Performed
2000-01-23 Well Log Performed
2000-01-30 Perforation Treatment Performed - Jet Perforation
2000-02-21 Perforation Treatment Performed - Jet Perforation
2000-03-01 Well Fluid changed to Gas
2000-03-01 Well Mode changed to Testing
2000-03-04 Perforation Treatment Performed - Fractured
2000-06-01 Well Fluid changed to Gas
2000-06-01 Well Mode changed to Test Completed
2004-07-07 Perforation Treatment Performed - Jet Perforation
2004-07-16 Perforation Treatment Performed - Fractured
2004-08-31 Well Log Performed
2017-04-05 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-01-30 Perforation 1053.00 1056.00 7
2004-07-07 Perforation 705.70 706.70 13
2004-07-07 Perforation 701.20 702.20 13
2004-07-07 Perforation 698.20 699.20 13
2004-07-07 Perforation 681.40 682.40 13
2004-07-07 Perforation 675.50 676.50 13
2004-07-07 Perforation 668.20 670.20 13
2004-07-07 Perforation 639.70 640.70 13
2004-07-07 Perforation 620.70 621.70 13
2004-07-07 Perforation 610.30 611.30 13
2004-07-07 Perforation 591.40 592.40 13
2000-02-21 Perforation 815.00 819.00 7
2004-07-07 Perforation 579.80 580.80 13
2004-07-07 Perforation 577.80 578.80 13
2004-07-07 Perforation 571.30 572.30 13
2004-07-07 Perforation 563.50 564.50 13
2004-07-07 Perforation 503.30 504.30 13
2004-07-07 Perforation 497.60 498.60 13
2004-07-07 Perforation 494.70 495.70 13
2004-07-07 Perforation 484.90 485.90 13
2004-07-07 Perforation 454.50 455.50 13
2004-07-07 Perforation 451.70 452.70 13
2000-02-21 Perforation 802.00 806.00 7
2004-07-07 Perforation 440.00 442.00 13
2004-07-07 Perforation 429.40 430.40 13
2004-07-07 Perforation 298.70 299.70 13
2004-07-07 Perforation 278.90 279.90 13
2004-07-07 Perforation 274.80 275.80 13
2004-07-16 Fracture 274.80 739.30 0
2000-03-04 Fracture 802.00 819.00 0
2004-07-07 Perforation 738.30 739.30 13
2004-07-07 Perforation 733.30 734.30 13
2004-07-07 Perforation 731.60 732.60 13
2004-07-07 Perforation 724.00 725.00 13
2004-07-07 Perforation 710.70 711.70 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2000 120 0.0 0.0 0.0

For data sources see[5]

References