If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274272309002 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.32433,"lon":-113.687188,"icon":""}]} |
| Location: 00/09-23-027-27W4/2 | |
| Location Alias: 00/09-23-27-27 W4M | |
| Location Alias 2: 00/09-23-027-27 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 23 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 9-23-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0421961 | |
| License Date: 2010-07-20 | |
| License Status: Issued | |
| Spud Date: 2010-10-21 | |
| Final Drill Date: 2010-11-12 | |
| Well Total Depth: 834.00 m | |
| Surface Hole Latitude: 51.324330 | |
| Surface Hole Longitude: -113.687188 |
| Date | Event |
|---|---|
| 2010-07-20 | Obtained License |
| 2010-10-21 | Surface Casing Operation Performed |
| 2010-11-12 | Finished Drilling |
| 2010-11-12 | Well Mode changed to Drilled and Cased |
| 2010-11-13 | Production Casing Operation Performed |
| 2010-11-13 | Rig Released |
| 2010-11-18 | Well Log Performed |
| 2011-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-01-19 | Perforation Treatment Performed - Fractured |
| 2011-02-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-10 | Perforation Treatment Performed - Fractured |
| 2011-02-17 | Well Began Production |
| 2011-02-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-02-17 | Well Mode changed to Flowing |
| 2017-11-17 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2017-11-17 | Well Log Performed |
| 2017-11-17 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-04 | Perforation | 663.00 | 665.00 | 13 |
| 2011-02-04 | Perforation | 674.90 | 675.40 | 13 |
| 2011-02-04 | Perforation | 675.50 | 677.20 | 13 |
| 2011-02-04 | Perforation | 650.70 | 651.20 | 13 |
| 2011-02-04 | Perforation | 656.50 | 657.50 | 13 |
| 2011-02-04 | Perforation | 415.10 | 415.60 | 13 |
| 2011-02-04 | Perforation | 421.60 | 422.10 | 13 |
| 2011-02-04 | Perforation | 278.30 | 278.80 | 13 |
| 2011-02-04 | Perforation | 403.80 | 404.30 | 13 |
| 2011-02-04 | Perforation | 433.80 | 434.30 | 13 |
| 2011-02-04 | Perforation | 553.00 | 553.50 | 13 |
| 2011-01-04 | Perforation | 626.50 | 628.00 | 13 |
| 2011-02-04 | Perforation | 557.10 | 557.60 | 13 |
| 2011-02-04 | Perforation | 535.50 | 536.00 | 13 |
| 2011-02-04 | Perforation | 541.20 | 542.20 | 13 |
| 2011-02-04 | Perforation | 299.00 | 300.00 | 13 |
| 2011-02-04 | Perforation | 304.50 | 306.50 | 13 |
| 2011-02-04 | Perforation | 281.00 | 282.00 | 13 |
| 2011-02-04 | Perforation | 291.50 | 292.50 | 13 |
| 2011-02-04 | Perforation | 775.50 | 776.50 | 13 |
| 2011-02-04 | Perforation | 793.50 | 795.00 | 13 |
| 2011-02-04 | Perforation | 463.00 | 465.00 | 13 |
| 2011-01-19 | Fracture | 663.00 | 665.00 | 0 |
| 2011-02-04 | Perforation | 605.50 | 606.50 | 13 |
| 2011-02-04 | Perforation | 701.00 | 703.00 | 13 |
| 2011-02-04 | Perforation | 710.70 | 711.70 | 13 |
| 2011-02-04 | Perforation | 681.00 | 682.50 | 13 |
| 2011-02-04 | Perforation | 694.30 | 694.80 | 13 |
| 2011-02-04 | Perforation | 717.20 | 717.70 | 13 |
| 2011-02-04 | Perforation | 685.50 | 686.50 | 13 |
| 2011-02-10 | Fracture | 618.30 | 622.30 | 0 |
| 2011-02-10 | Fracture | 642.90 | 657.50 | 0 |
| 2011-02-10 | Fracture | 535.50 | 588.00 | 0 |
| 2011-01-19 | Fracture | 626.50 | 628.00 | 0 |
| 2011-02-10 | Fracture | 403.80 | 434.30 | 0 |
| 2011-02-10 | Fracture | 278.30 | 278.80 | 0 |
| 2011-02-10 | Fracture | 674.90 | 703.00 | 0 |
| 2011-02-10 | Fracture | 463.00 | 465.00 | 0 |
| 2011-02-10 | Fracture | 775.50 | 795.00 | 0 |
| 2011-02-10 | Fracture | 281.00 | 306.50 | 0 |
| 2011-02-10 | Fracture | 710.70 | 717.70 | 0 |
| 2011-02-10 | Fracture | 605.50 | 606.50 | 0 |
| 2011-02-04 | Perforation | 618.30 | 618.80 | 13 |
| 2011-02-04 | Perforation | 621.80 | 622.30 | 13 |
| 2011-02-04 | Perforation | 560.20 | 560.70 | 13 |
| 2011-02-04 | Perforation | 587.50 | 588.00 | 13 |
| 2011-02-04 | Perforation | 642.90 | 645.40 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7629 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8746 | 0.0 | 0.0 | 0.0 |
| 2016 | 8751 | 0.0 | 0.0 | 0.0 |
| 2017 | 8630 | 0.0 | 0.0 | 0.0 |
| 2018 | 8626 | 0.0 | 0.0 | 0.0 |
| 2019 | 8701 | 0.0 | 0.0 | 0.0 |
| 2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
| Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
|---|---|---|---|
| 2017-11-17 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]