If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274272215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.325178,"lon":-113.719591,"icon":""}]} |
| Location: 00/15-22-027-27W4/0 | |
| Location Alias: 00/15-22-27-27 W4M | |
| Location Alias 2: 00/15-22-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 22 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 15-22-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0422336 | |
| License Date: 2010-08-04 | |
| License Status: Issued | |
| Spud Date: 2010-10-23 | |
| Final Drill Date: 2010-11-15 | |
| Well Total Depth: 1083.00 m | |
| Surface Hole Latitude: 51.325178 | |
| Surface Hole Longitude: -113.719591 |
| Date | Event |
|---|---|
| 2010-08-04 | Obtained License |
| 2010-10-23 | Surface Casing Operation Performed |
| 2010-11-15 | Finished Drilling |
| 2010-11-15 | Production Casing Operation Performed |
| 2010-11-15 | Rig Released |
| 2010-11-15 | Well Mode changed to Drilled and Cased |
| 2010-11-18 | Well Log Performed |
| 2011-01-04 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-01 | Perforation Treatment Performed - Fractured |
| 2011-02-16 | Perforation Treatment Performed - Jet Perforation |
| 2011-02-18 | Perforation Treatment Performed - Fractured |
| 2011-03-02 | Well Began Production |
| 2011-03-02 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-03-02 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-01-04 | Perforation | 585.00 | 587.00 | 13 |
| 2011-02-16 | Perforation | 707.10 | 708.10 | 13 |
| 2011-02-16 | Perforation | 711.40 | 712.90 | 13 |
| 2011-02-16 | Perforation | 691.80 | 692.30 | 13 |
| 2011-02-16 | Perforation | 705.30 | 705.80 | 13 |
| 2011-02-16 | Perforation | 623.30 | 623.80 | 13 |
| 2011-02-16 | Perforation | 444.10 | 444.60 | 13 |
| 2011-02-16 | Perforation | 459.00 | 459.50 | 13 |
| 2011-02-16 | Perforation | 310.10 | 310.60 | 13 |
| 2011-02-16 | Perforation | 432.10 | 433.10 | 13 |
| 2011-02-16 | Perforation | 510.50 | 511.00 | 13 |
| 2011-01-04 | Perforation | 836.50 | 838.50 | 13 |
| 2011-02-16 | Perforation | 591.10 | 591.60 | 13 |
| 2011-02-16 | Perforation | 592.80 | 593.30 | 13 |
| 2011-02-16 | Perforation | 573.60 | 574.10 | 13 |
| 2011-02-16 | Perforation | 579.60 | 580.10 | 13 |
| 2011-02-16 | Perforation | 345.00 | 347.00 | 13 |
| 2011-02-16 | Perforation | 404.50 | 407.00 | 13 |
| 2011-02-16 | Perforation | 303.50 | 304.50 | 13 |
| 2011-02-16 | Perforation | 341.00 | 342.00 | 13 |
| 2011-02-16 | Perforation | 454.50 | 456.50 | 13 |
| 2011-02-16 | Perforation | 815.00 | 816.00 | 13 |
| 2011-02-01 | Fracture | 585.00 | 587.00 | 0 |
| 2011-02-16 | Perforation | 827.00 | 829.50 | 13 |
| 2011-02-16 | Perforation | 543.00 | 544.50 | 13 |
| 2011-02-16 | Perforation | 549.50 | 551.50 | 13 |
| 2011-02-16 | Perforation | 748.90 | 749.40 | 13 |
| 2011-02-16 | Perforation | 715.70 | 716.70 | 13 |
| 2011-02-16 | Perforation | 721.80 | 722.30 | 13 |
| 2011-02-16 | Perforation | 742.60 | 743.60 | 13 |
| 2011-02-16 | Perforation | 734.10 | 736.10 | 13 |
| 2011-02-18 | Fracture | 591.10 | 736.10 | 0 |
| 2011-02-18 | Fracture | 573.60 | 580.10 | 0 |
| 2011-02-01 | Fracture | 836.50 | 838.50 | 0 |
| 2011-02-18 | Fracture | 459.00 | 511.00 | 0 |
| 2011-02-18 | Fracture | 432.10 | 444.60 | 0 |
| 2011-02-18 | Fracture | 310.10 | 310.60 | 0 |
| 2011-02-18 | Fracture | 742.60 | 749.40 | 0 |
| 2011-02-18 | Fracture | 454.50 | 456.50 | 0 |
| 2011-02-18 | Fracture | 543.00 | 551.50 | 0 |
| 2011-02-18 | Fracture | 341.00 | 407.00 | 0 |
| 2011-02-18 | Fracture | 815.00 | 829.50 | 0 |
| 2011-02-18 | Fracture | 303.50 | 304.50 | 0 |
| 2011-02-16 | Perforation | 677.40 | 677.90 | 13 |
| 2011-02-16 | Perforation | 678.10 | 680.10 | 13 |
| 2011-02-16 | Perforation | 654.60 | 655.10 | 13 |
| 2011-02-16 | Perforation | 659.30 | 661.80 | 13 |
| 2011-02-16 | Perforation | 685.60 | 686.10 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 7318 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8746 | 0.0 | 0.0 | 0.0 |
| 2016 | 8751 | 0.0 | 0.0 | 0.0 |
| 2017 | 8630 | 0.0 | 0.0 | 0.0 |
| 2018 | 8627 | 0.0 | 0.0 | 0.0 |
| 2019 | 8701 | 0.0 | 0.0 | 0.0 |
| 2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[5]