If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274272003020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.316028,"lon":-113.767726,"icon":""}]} |
| Location: 02/03-20-027-27W4/0 | |
| Location Alias: 02/03-20-27-27 W4M | |
| Location Alias 2: 02/03-20-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 20 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 ENTICE 3-20-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0426991 | |
| License Date: 2010-12-03 | |
| License Status: Issued | |
| Spud Date: 2010-12-29 | |
| Final Drill Date: 2011-01-06 | |
| Well Total Depth: 1165.00 m | |
| Surface Hole Latitude: 51.316028 | |
| Surface Hole Longitude: -113.767726 |
| Date | Event |
|---|---|
| 2010-12-03 | Obtained License |
| 2010-12-29 | Surface Casing Operation Performed |
| 2011-01-06 | Finished Drilling |
| 2011-01-06 | Well Mode changed to Drilled and Cased |
| 2011-01-07 | Production Casing Operation Performed |
| 2011-01-07 | Rig Released |
| 2011-01-14 | Well Log Performed |
| 2011-02-20 | Perforation Treatment Performed - Jet Perforation |
| 2011-07-15 | Perforation Treatment Performed - Fractured |
| 2011-07-18 | Well Fluid changed to Gas |
| 2011-07-18 | Well Mode changed to Testing |
| 2011-09-10 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-25 | Perforation Treatment Performed - Fractured |
| 2011-10-12 | Well Began Production |
| 2011-10-12 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2011-10-12 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2011-02-20 | Perforation | 597.00 | 599.00 | 13 |
| 2011-09-10 | Perforation | 341.40 | 341.90 | 13 |
| 2011-09-10 | Perforation | 357.90 | 358.40 | 13 |
| 2011-09-10 | Perforation | 370.40 | 371.40 | 13 |
| 2011-09-10 | Perforation | 385.50 | 386.50 | 13 |
| 2011-09-10 | Perforation | 388.50 | 390.50 | 13 |
| 2011-09-10 | Perforation | 392.50 | 393.50 | 13 |
| 2011-09-10 | Perforation | 413.50 | 415.50 | 13 |
| 2011-09-10 | Perforation | 424.00 | 426.00 | 13 |
| 2011-09-10 | Perforation | 438.50 | 440.50 | 13 |
| 2011-09-10 | Perforation | 473.70 | 474.20 | 13 |
| 2011-02-20 | Perforation | 850.00 | 852.00 | 13 |
| 2011-09-10 | Perforation | 485.30 | 485.80 | 13 |
| 2011-09-10 | Perforation | 502.30 | 502.80 | 13 |
| 2011-09-10 | Perforation | 531.50 | 533.50 | 13 |
| 2011-09-10 | Perforation | 573.50 | 575.50 | 13 |
| 2011-09-10 | Perforation | 577.50 | 579.00 | 13 |
| 2011-09-10 | Perforation | 601.00 | 603.00 | 13 |
| 2011-09-10 | Perforation | 610.00 | 612.00 | 13 |
| 2011-09-10 | Perforation | 619.90 | 620.40 | 13 |
| 2011-09-10 | Perforation | 628.20 | 628.70 | 13 |
| 2011-09-10 | Perforation | 631.70 | 632.20 | 13 |
| 2011-02-20 | Perforation | 1044.00 | 1046.00 | 13 |
| 2011-09-10 | Perforation | 634.00 | 636.00 | 13 |
| 2011-09-10 | Perforation | 644.50 | 645.50 | 13 |
| 2011-09-10 | Perforation | 690.00 | 692.00 | 13 |
| 2011-09-10 | Perforation | 694.40 | 694.90 | 13 |
| 2011-09-10 | Perforation | 700.20 | 701.70 | 13 |
| 2011-09-10 | Perforation | 720.60 | 722.60 | 13 |
| 2011-09-10 | Perforation | 730.00 | 730.50 | 13 |
| 2011-09-10 | Perforation | 735.70 | 736.20 | 13 |
| 2011-09-10 | Perforation | 745.00 | 747.00 | 13 |
| 2011-09-10 | Perforation | 750.90 | 752.90 | 13 |
| 2011-02-20 | Perforation | 1086.50 | 1088.50 | 13 |
| 2011-09-10 | Perforation | 755.50 | 756.50 | 13 |
| 2011-09-10 | Perforation | 769.90 | 770.40 | 13 |
| 2011-09-10 | Perforation | 775.60 | 776.60 | 13 |
| 2011-09-10 | Perforation | 790.70 | 791.20 | 13 |
| 2011-09-25 | Fracture | 322.50 | 791.20 | 0 |
| 2011-07-15 | Fracture | 597.00 | 599.00 | 0 |
| 2011-07-15 | Fracture | 850.00 | 852.00 | 0 |
| 2011-07-15 | Fracture | 1044.00 | 1046.00 | 0 |
| 2011-07-15 | Fracture | 1086.50 | 1088.50 | 0 |
| 2011-09-10 | Perforation | 322.50 | 325.00 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2011 | 1204 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]