If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274271708000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.303637,"lon":-113.761098,"icon":""}]} |
| Location: 00/08-17-027-27W4/0 | |
| Location Alias: 00/08-17-27-27 W4M | |
| Location Alias 2: 00/08-17-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 17 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 8B ENTICE 8-17-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0230413 | |
| License Date: 1999-12-13 | |
| License Status: Issued | |
| Spud Date: 2000-01-10 | |
| Final Drill Date: 2000-01-12 | |
| Well Total Depth: 1204.00 m | |
| Surface Hole Latitude: 51.303637 | |
| Surface Hole Longitude: -113.761098 |
| Date | Event |
|---|---|
| 1999-12-13 | Obtained License |
| 2000-01-11 | Surface Casing Operation Performed |
| 2000-01-12 | Finished Drilling |
| 2000-01-12 | Production Casing Operation Performed |
| 2000-01-12 | Rig Released |
| 2000-01-12 | Well Mode changed to Drilled and Cased |
| 2000-01-16 | Well Log Performed |
| 2000-01-23 | Perforation Treatment Performed - Jet Perforation |
| 2000-02-21 | Perforation Treatment Performed - Jet Perforation |
| 2000-02-25 | Perforation Treatment Performed - Fractured |
| 2000-05-21 | Perforation Treatment Performed - Jet Perforation |
| 2000-05-29 | Perforation Treatment Performed - Jet Perforation |
| 2000-06-05 | Perforation Treatment Performed - Jet Perforation |
| 2000-08-10 | Perforation Treatment Performed - Jet Perforation |
| 2000-10-13 | Perforation Treatment Performed - Fractured |
| 2007-02-02 | Well Began Production |
| 2007-02-02 | Well Fluid changed to Gas |
| 2007-02-02 | Well Mode changed to Flowing |
| 2011-08-24 | Perforation Treatment Performed - Jet Perforation |
| 2011-09-15 | Perforation Treatment Performed - Fractured |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-01-23 | Perforation | 1173.00 | 1177.00 | 7 |
| 2011-08-24 | Perforation | 198.00 | 200.00 | 13 |
| 2011-08-24 | Perforation | 211.00 | 212.00 | 13 |
| 2011-08-24 | Perforation | 264.00 | 265.00 | 13 |
| 2011-08-24 | Perforation | 355.40 | 355.90 | 13 |
| 2011-08-24 | Perforation | 363.90 | 364.40 | 13 |
| 2011-08-24 | Perforation | 370.10 | 371.10 | 13 |
| 2011-08-24 | Perforation | 374.60 | 375.10 | 13 |
| 2011-08-24 | Perforation | 377.00 | 380.00 | 13 |
| 2011-08-24 | Perforation | 426.00 | 428.00 | 13 |
| 2011-08-24 | Perforation | 448.30 | 448.80 | 13 |
| 2000-02-21 | Perforation | 1024.00 | 1027.00 | 7 |
| 2011-08-24 | Perforation | 471.00 | 471.50 | 13 |
| 2011-08-24 | Perforation | 505.40 | 505.90 | 13 |
| 2011-08-24 | Perforation | 548.30 | 548.80 | 13 |
| 2011-08-24 | Perforation | 566.50 | 567.00 | 13 |
| 2011-08-24 | Perforation | 570.50 | 572.50 | 13 |
| 2011-08-24 | Perforation | 628.50 | 629.50 | 13 |
| 2011-08-24 | Perforation | 632.20 | 632.70 | 13 |
| 2011-08-24 | Perforation | 694.90 | 695.90 | 13 |
| 2011-08-24 | Perforation | 698.90 | 699.90 | 13 |
| 2011-08-24 | Perforation | 702.10 | 703.20 | 13 |
| 2000-02-25 | Fracture | 1024.00 | 1177.00 | 0 |
| 2011-08-24 | Perforation | 722.20 | 724.20 | 13 |
| 2011-08-24 | Perforation | 725.00 | 725.50 | 13 |
| 2011-08-24 | Perforation | 736.60 | 737.10 | 13 |
| 2011-08-24 | Perforation | 742.80 | 743.80 | 13 |
| 2011-08-24 | Perforation | 759.10 | 759.60 | 13 |
| 2011-08-24 | Perforation | 766.20 | 767.20 | 13 |
| 2011-08-24 | Perforation | 771.40 | 771.90 | 13 |
| 2011-08-24 | Perforation | 774.30 | 774.80 | 13 |
| 2011-08-24 | Perforation | 784.00 | 784.50 | 13 |
| 2011-08-24 | Perforation | 792.10 | 794.10 | 13 |
| 2000-05-21 | Perforation | 900.00 | 903.00 | 7 |
| 2011-08-24 | Perforation | 804.00 | 805.00 | 13 |
| 2011-08-24 | Perforation | 812.10 | 812.60 | 13 |
| 2011-08-24 | Perforation | 819.40 | 819.90 | 13 |
| 2011-09-15 | Fracture | 211.00 | 819.90 | 0 |
| 2000-05-21 | Perforation | 894.50 | 897.50 | 7 |
| 2000-05-29 | Perforation | 704.00 | 707.00 | 7 |
| 2000-06-05 | Perforation | 603.50 | 606.50 | 7 |
| 2000-08-10 | Perforation | 319.00 | 322.00 | 7 |
| 2000-10-13 | Fracture | 319.00 | 322.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2007 | 7991 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8743 | 0.0 | 0.0 | 0.0 |
| 2011 | 8731 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]