If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274271511000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.308447,"lon":-113.72536,"icon":""}]} |
Location: 00/11-15-027-27W4/0 | |
Location Alias: 00/11-15-27-27 W4M | |
Location Alias 2: 00/11-15-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 15 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 11-15-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423360 | |
License Date: 2010-09-09 | |
License Status: Issued | |
Spud Date: 2010-10-31 | |
Final Drill Date: 2010-11-11 | |
Well Total Depth: 1102.00 m | |
Surface Hole Latitude: 51.308447 | |
Surface Hole Longitude: -113.725360 |
Date | Event |
---|---|
2010-09-09 | Obtained License |
2010-10-31 | Surface Casing Operation Performed |
2010-11-11 | Finished Drilling |
2010-11-11 | Well Mode changed to Drilled and Cased |
2010-11-12 | Production Casing Operation Performed |
2010-11-12 | Rig Released |
2011-01-18 | Well Log Performed |
2011-02-20 | Perforation Treatment Performed - Jet Perforation |
2011-03-10 | Perforation Treatment Performed - Fractured |
2011-03-13 | Well Fluid changed to Gas |
2011-03-13 | Well Mode changed to Testing |
2011-04-13 | Well Began Production |
2011-04-13 | Well Fluid changed to Gas |
2011-04-13 | Well Mode changed to Flowing |
2011-08-08 | Perforation Treatment Performed - Jet Perforation |
2011-08-25 | Perforation Treatment Performed - Fractured |
2011-09-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-09-09 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-20 | Perforation | 1082.50 | 1084.50 | 13 |
2011-08-08 | Perforation | 328.10 | 328.60 | 13 |
2011-08-08 | Perforation | 329.80 | 330.30 | 13 |
2011-08-08 | Perforation | 332.10 | 332.60 | 13 |
2011-08-08 | Perforation | 347.30 | 347.80 | 13 |
2011-08-08 | Perforation | 394.30 | 394.80 | 13 |
2011-08-08 | Perforation | 397.00 | 399.00 | 13 |
2011-08-08 | Perforation | 412.00 | 413.50 | 13 |
2011-08-08 | Perforation | 418.00 | 419.00 | 13 |
2011-08-08 | Perforation | 424.10 | 424.60 | 13 |
2011-08-08 | Perforation | 447.50 | 448.50 | 13 |
2011-02-20 | Perforation | 763.50 | 764.50 | 13 |
2011-08-08 | Perforation | 450.20 | 450.70 | 13 |
2011-08-08 | Perforation | 461.30 | 461.80 | 13 |
2011-08-08 | Perforation | 462.20 | 463.70 | 13 |
2011-08-08 | Perforation | 466.50 | 468.00 | 13 |
2011-08-08 | Perforation | 473.10 | 473.60 | 13 |
2011-08-08 | Perforation | 479.20 | 479.70 | 13 |
2011-08-08 | Perforation | 520.90 | 521.90 | 13 |
2011-08-08 | Perforation | 558.50 | 560.00 | 13 |
2011-08-08 | Perforation | 563.90 | 564.40 | 13 |
2011-08-08 | Perforation | 601.40 | 601.90 | 13 |
2011-02-20 | Perforation | 655.00 | 657.00 | 13 |
2011-08-08 | Perforation | 602.80 | 603.80 | 13 |
2011-08-08 | Perforation | 606.90 | 607.40 | 13 |
2011-08-08 | Perforation | 632.30 | 632.80 | 13 |
2011-08-08 | Perforation | 649.50 | 651.50 | 13 |
2011-08-08 | Perforation | 666.50 | 667.50 | 13 |
2011-08-08 | Perforation | 668.50 | 669.50 | 13 |
2011-08-08 | Perforation | 671.80 | 673.30 | 13 |
2011-08-08 | Perforation | 688.70 | 691.20 | 13 |
2011-08-08 | Perforation | 696.00 | 696.50 | 13 |
2011-08-08 | Perforation | 701.70 | 702.70 | 13 |
2011-02-20 | Perforation | 568.00 | 570.00 | 13 |
2011-08-08 | Perforation | 716.50 | 717.50 | 13 |
2011-08-08 | Perforation | 723.40 | 723.90 | 13 |
2011-08-08 | Perforation | 730.90 | 731.90 | 13 |
2011-08-08 | Perforation | 741.00 | 742.00 | 13 |
2011-08-08 | Perforation | 746.90 | 748.90 | 13 |
2011-08-08 | Perforation | 757.70 | 758.70 | 13 |
2011-08-08 | Perforation | 773.70 | 774.20 | 13 |
2011-08-25 | Fracture | 314.70 | 774.20 | 0 |
2011-03-10 | Fracture | 763.50 | 764.50 | 0 |
2011-03-10 | Fracture | 655.00 | 657.00 | 0 |
2011-03-10 | Fracture | 568.00 | 570.00 | 0 |
2011-08-08 | Perforation | 314.70 | 315.70 | 13 |
2011-08-08 | Perforation | 323.10 | 323.60 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 6314 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8751 | 0.0 | 0.0 | 0.0 |
2017 | 8630 | 0.0 | 0.0 | 0.0 |
2018 | 8627 | 0.0 | 0.0 | 0.0 |
2019 | 8701 | 0.0 | 0.0 | 0.0 |
2020 | 2173 | 0.0 | 0.0 | 0.0 |
For data sources see[5]