If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274271505000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.304457,"lon":-113.726671,"icon":""}]} |
Location: 00/05-15-027-27W4/0 | |
Location Alias: 00/05-15-27-27 W4M | |
Location Alias 2: 00/05-15-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 15 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 5-15-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0423346 | |
License Date: 2010-09-09 | |
License Status: Suspension | |
Spud Date: 2010-11-01 | |
Final Drill Date: 2010-11-14 | |
Well Total Depth: 1099.40 m | |
Surface Hole Latitude: 51.304457 | |
Surface Hole Longitude: -113.726671 |
Date | Event |
---|---|
2010-09-09 | Obtained License |
2010-11-01 | Lost Circulation Occurred |
2010-11-01 | Surface Casing Operation Performed |
2010-11-14 | Finished Drilling |
2010-11-14 | Well Mode changed to Drilled and Cased |
2010-11-16 | Production Casing Operation Performed |
2010-11-16 | Rig Released |
2010-11-20 | Well Log Performed |
2011-01-18 | Perforation Treatment Performed - Jet Perforation |
2011-02-02 | Perforation Treatment Performed - Fractured |
2011-02-09 | Well Began Production |
2011-02-09 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-02-09 | Well Mode changed to Flowing |
2019-04-01 | Well Fluid changed to Coalbed Methane-Coals and Other |
2019-04-01 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-01-18 | Perforation | 633.40 | 633.90 | 13 |
2011-01-18 | Perforation | 330.00 | 331.00 | 13 |
2011-01-18 | Perforation | 349.70 | 350.20 | 13 |
2011-01-18 | Perforation | 315.20 | 315.70 | 13 |
2011-01-18 | Perforation | 328.00 | 328.50 | 13 |
2011-01-18 | Perforation | 464.40 | 464.90 | 13 |
2011-01-18 | Perforation | 473.50 | 474.00 | 13 |
2011-01-18 | Perforation | 393.50 | 394.00 | 13 |
2011-01-18 | Perforation | 445.70 | 446.20 | 13 |
2011-01-18 | Perforation | 456.00 | 459.00 | 13 |
2011-01-18 | Perforation | 422.00 | 425.00 | 13 |
2011-01-18 | Perforation | 667.00 | 667.50 | 13 |
2011-01-18 | Perforation | 417.50 | 419.00 | 13 |
2011-01-18 | Perforation | 517.50 | 519.00 | 13 |
2011-01-18 | Perforation | 774.50 | 776.00 | 13 |
2011-01-18 | Perforation | 558.00 | 561.00 | 13 |
2011-01-18 | Perforation | 544.00 | 546.50 | 13 |
2011-01-18 | Perforation | 750.90 | 751.40 | 13 |
2011-01-18 | Perforation | 760.10 | 761.10 | 13 |
2011-01-18 | Perforation | 715.90 | 716.90 | 13 |
2011-01-18 | Perforation | 732.50 | 733.00 | 13 |
2011-01-18 | Perforation | 772.10 | 772.60 | 13 |
2011-01-18 | Perforation | 603.40 | 604.40 | 13 |
2011-01-18 | Perforation | 740.20 | 741.20 | 13 |
2011-02-02 | Fracture | 315.20 | 394.00 | 0 |
2011-02-02 | Fracture | 464.40 | 474.00 | 0 |
2011-02-02 | Fracture | 445.70 | 446.20 | 0 |
2011-02-02 | Fracture | 601.40 | 751.40 | 0 |
2011-02-02 | Fracture | 760.10 | 761.10 | 0 |
2011-02-02 | Fracture | 774.50 | 776.00 | 0 |
2011-02-02 | Fracture | 517.50 | 561.00 | 0 |
2011-02-02 | Fracture | 456.00 | 459.00 | 0 |
2011-02-02 | Fracture | 417.50 | 425.00 | 0 |
2011-01-18 | Perforation | 607.50 | 608.00 | 13 |
2011-01-18 | Perforation | 696.70 | 697.20 | 13 |
2011-01-18 | Perforation | 702.20 | 702.70 | 13 |
2011-01-18 | Perforation | 671.60 | 674.10 | 13 |
2011-01-18 | Perforation | 689.30 | 692.30 | 13 |
2011-01-18 | Perforation | 601.40 | 601.90 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 7774 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8746 | 0.0 | 0.0 | 0.0 |
2016 | 8010 | 0.0 | 0.0 | 0.0 |
2017 | 706 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2010-11-01 | Lost Circulation | 30.00 | 32.00 |
For data sources see[6]