X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0274271103002

Well Details

Well ID: 0274271103002
Loading map...
Location: 00/03-11-027-27W4/2
Location Alias: 00/03-11-27-27 W4M
Location Alias 2: 00/03-11-027-27 W4/02
Country: Canada
Province: Alberta
Township: 027
Meridian: 4
Range: 27
Section: 11
County/Municipality: Rocky View County
Well Name: EMBER ENTICE 3-11-27-27
Operator Name: Ember Resources Inc.
License Number: 0331151
License Date: 2005-05-17
License Status: Issued
Spud Date: 2005-08-09
Final Drill Date: 2005-08-22
Well Total Depth: 1116.00 m
Surface Hole Latitude: 51.287412
Surface Hole Longitude: -113.697479

For data sources see[1][2]

Well History

Date Event
2005-05-17 Obtained License
2005-08-09 Surface Casing Operation Performed
2005-08-22 Finished Drilling
2005-08-22 Well Mode changed to Drilled and Cased
2005-08-23 Production Casing Operation Performed
2005-08-23 Rig Released
2005-09-02 Well Log Performed
2005-09-09 Well Log Performed
2005-09-27 Perforation Treatment Performed - Jet Perforation
2005-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-10-27 Perforation Treatment Performed - Jet Perforation
2005-10-27 Plug Back Performed
2005-11-14 Perforation Treatment Performed - Fractured
2006-12-09 Well Began Production
2006-12-09 Well Fluid changed to Coalbed Methane-Coals Only
2006-12-09 Well Mode changed to Flowing
2010-11-01 Perforation Treatment Performed - Jet Perforation
2010-11-13 Perforation Treatment Performed - Fractured
2010-11-19 Well Structure changed to Commingled
2010-12-01 Perforation Treatment Performed - Fractured
2015-12-21 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2005-09-27 Perforation 995.00 998.00 13
2005-10-27 Perforation 688.00 688.50 13
2005-10-27 Perforation 685.80 686.30 13
2005-10-27 Perforation 682.00 682.50 13
2005-10-27 Perforation 673.60 674.10 13
2005-10-27 Perforation 672.70 673.20 13
2005-10-27 Perforation 659.30 659.80 13
2005-10-27 Perforation 652.30 652.80 13
2005-10-27 Perforation 645.10 645.60 13
2005-10-27 Perforation 619.90 620.40 13
2005-10-27 Perforation 614.60 615.10 13
2005-10-27 Packing Device Capped w/Cement 973.70 981.70 0
2005-10-27 Perforation 613.50 614.00 13
2005-10-27 Perforation 610.30 610.80 13
2005-10-27 Perforation 593.90 594.40 13
2005-10-27 Perforation 590.90 591.40 13
2005-10-27 Perforation 577.80 578.30 13
2005-10-27 Perforation 568.80 569.30 13
2005-10-27 Perforation 561.00 561.50 13
2005-10-27 Perforation 553.50 554.00 13
2005-10-27 Perforation 545.30 545.80 13
2005-10-27 Perforation 538.30 538.80 13
2005-10-27 Perforation 745.10 745.60 13
2005-10-27 Perforation 520.20 520.70 13
2005-10-27 Perforation 485.90 486.40 13
2005-10-27 Perforation 484.90 485.40 13
2005-10-27 Perforation 475.30 475.80 13
2005-10-27 Perforation 441.10 441.60 13
2005-10-27 Perforation 435.40 435.90 13
2005-10-27 Perforation 434.60 435.10 13
2005-10-27 Perforation 430.60 431.10 13
2005-10-27 Perforation 421.30 421.80 13
2005-10-27 Perforation 404.70 405.20 13
2005-10-27 Perforation 730.50 731.00 13
2005-10-27 Perforation 380.60 381.10 13
2005-10-27 Perforation 351.00 351.50 13
2005-10-27 Perforation 307.20 308.20 13
2005-10-27 Perforation 304.40 304.90 13
2005-10-27 Perforation 290.10 290.60 13
2005-10-27 Perforation 287.90 288.90 13
2005-11-14 Fracture 287.90 745.60 0
2010-11-01 Perforation 921.00 924.00 13
2010-11-01 Perforation 834.00 837.00 13
2010-11-01 Perforation 776.00 778.00 13
2005-10-27 Perforation 723.90 724.40 13
2010-11-01 Perforation 623.00 626.00 13
2010-11-01 Perforation 601.50 603.50 13
2010-11-01 Perforation 535.00 536.00 13
2010-11-01 Perforation 509.50 511.50 13
2010-11-01 Perforation 504.50 505.50 13
2010-11-01 Perforation 465.00 467.00 13
2010-11-01 Perforation 449.50 451.50 13
2010-11-01 Perforation 413.00 414.00 13
2010-11-01 Perforation 398.00 399.00 13
2010-11-01 Perforation 374.00 375.00 13
2005-10-27 Perforation 717.50 718.00 13
2010-11-01 Perforation 279.00 280.00 13
2010-11-01 Perforation 226.00 228.00 13
2010-11-01 Perforation 210.00 212.00 13
2010-11-13 Fracture 921.00 924.00 0
2010-11-13 Fracture 834.00 837.00 0
2010-11-13 Fracture 776.00 778.00 0
2010-12-01 Fracture 210.00 626.00 0
2005-10-27 Perforation 716.50 717.00 13
2005-10-27 Perforation 701.90 702.40 13
2005-10-27 Perforation 695.60 696.10 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 552 0.0 0.0 0.0
2007 8759 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 6919 0.0 0.0 0.0

For data sources see[5]

References