If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274270907020 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.29105,"lon":-113.740119,"icon":""}]} |
| Location: 02/07-09-027-27W4/0 | |
| Location Alias: 02/07-09-27-27 W4M | |
| Location Alias 2: 02/07-09-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 09 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER 102 ENTICE 7-9-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0238720 | |
| License Date: 2000-06-19 | |
| License Status: Issued | |
| Spud Date: 2000-06-23 | |
| Final Drill Date: 2000-07-05 | |
| Well Total Depth: 1191.00 m | |
| Surface Hole Latitude: 51.291050 | |
| Surface Hole Longitude: -113.740119 |
| Date | Event |
|---|---|
| 2000-06-19 | Obtained License |
| 2000-06-23 | Surface Casing Operation Performed |
| 2000-07-05 | Finished Drilling |
| 2000-07-05 | Production Casing Operation Performed |
| 2000-07-05 | Rig Released |
| 2000-07-05 | Well Mode changed to Drilled and Cased |
| 2000-07-11 | Well Log Performed |
| 2000-08-21 | Perforation Treatment Performed - Jet Perforation |
| 2000-09-14 | Perforation Treatment Performed - Jet Perforation |
| 2000-09-25 | Perforation Treatment Performed - Jet Perforation |
| 2004-04-30 | Perforation Treatment Performed - Jet Perforation |
| 2004-06-22 | Perforation Treatment Performed - Fractured |
| 2006-12-27 | Well Began Production |
| 2006-12-27 | Well Fluid changed to Gas |
| 2006-12-27 | Well Mode changed to Flowing |
| 2008-01-11 | Perforation Treatment Performed - Jet Perforation |
| 2008-01-31 | Perforation Treatment Performed - Fractured |
| 2009-12-09 | Perforation Treatment Performed - Jet Perforation |
| 2009-12-12 | Perforation Treatment Performed - Fractured |
| 2009-12-23 | Well Fluid changed to Coalbed Methane-Coals and Other |
| 2009-12-23 | Well Mode changed to Flowing |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2000-08-21 | Perforation | 1061.00 | 1066.00 | 7 |
| 2009-12-09 | Perforation | 584.40 | 584.90 | 13 |
| 2009-12-09 | Perforation | 477.80 | 478.30 | 13 |
| 2009-12-09 | Perforation | 474.40 | 474.90 | 13 |
| 2009-12-09 | Perforation | 599.10 | 599.60 | 13 |
| 2009-12-09 | Perforation | 664.70 | 665.20 | 13 |
| 2009-12-09 | Perforation | 662.60 | 663.10 | 13 |
| 2009-12-09 | Perforation | 601.10 | 601.60 | 13 |
| 2009-12-09 | Perforation | 413.00 | 417.00 | 13 |
| 2009-12-09 | Perforation | 351.00 | 352.00 | 13 |
| 2009-12-09 | Perforation | 338.50 | 339.50 | 13 |
| 2000-09-14 | Perforation | 968.00 | 971.00 | 7 |
| 2009-12-09 | Perforation | 342.60 | 343.60 | 13 |
| 2009-12-09 | Perforation | 456.20 | 456.70 | 13 |
| 2009-12-09 | Perforation | 420.40 | 420.90 | 13 |
| 2009-12-09 | Perforation | 390.30 | 390.80 | 13 |
| 2009-12-09 | Perforation | 755.40 | 756.40 | 13 |
| 2009-12-09 | Perforation | 750.50 | 751.50 | 13 |
| 2009-12-09 | Perforation | 737.60 | 738.10 | 13 |
| 2009-12-09 | Perforation | 758.60 | 759.10 | 13 |
| 2009-12-09 | Perforation | 778.60 | 779.10 | 13 |
| 2009-12-09 | Perforation | 775.20 | 775.70 | 13 |
| 2000-09-25 | Perforation | 849.00 | 852.00 | 7 |
| 2009-12-09 | Perforation | 768.30 | 768.80 | 13 |
| 2009-12-09 | Perforation | 704.40 | 704.90 | 13 |
| 2009-12-09 | Perforation | 696.20 | 699.20 | 13 |
| 2009-12-09 | Perforation | 675.60 | 676.60 | 13 |
| 2009-12-09 | Perforation | 709.90 | 710.40 | 13 |
| 2009-12-09 | Perforation | 724.50 | 725.00 | 13 |
| 2009-12-09 | Perforation | 734.00 | 734.50 | 13 |
| 2009-12-09 | Perforation | 723.40 | 723.90 | 13 |
| 2009-12-12 | Fracture | 338.50 | 417.00 | 0 |
| 2009-12-12 | Fracture | 342.60 | 779.10 | 0 |
| 2004-04-30 | Perforation | 573.00 | 576.00 | 13 |
| 2004-06-22 | Fracture | 573.00 | 576.00 | 0 |
| 2008-01-11 | Perforation | 658.00 | 661.00 | 13 |
| 2008-01-11 | Perforation | 290.00 | 293.00 | 13 |
| 2008-01-31 | Fracture | 658.00 | 661.00 | 0 |
| 2008-01-31 | Fracture | 290.00 | 293.00 | 0 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2006 | 120 | 0.0 | 0.0 | 0.0 |
| 2007 | 8759 | 0.0 | 0.0 | 0.0 |
| 2008 | 8783 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 8743 | 0.0 | 0.0 | 0.0 |
| 2011 | 8753 | 0.0 | 0.0 | 0.0 |
| 2012 | 8782 | 0.0 | 0.0 | 0.0 |
| 2013 | 8759 | 0.0 | 0.0 | 0.0 |
| 2014 | 8740 | 0.0 | 0.0 | 0.0 |
| 2015 | 8749 | 0.0 | 0.0 | 0.0 |
| 2016 | 8783 | 0.0 | 0.0 | 0.0 |
| 2017 | 8759 | 0.0 | 0.0 | 0.0 |
| 2018 | 8759 | 0.0 | 0.0 | 0.0 |
| 2019 | 8759 | 0.0 | 0.0 | 0.0 |
| 2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]