If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0274270510000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.278745,"lon":-113.764894,"icon":""}]} |
Location: 00/10-05-027-27W4/0 | |
Location Alias: 00/10-05-27-27 W4M | |
Location Alias 2: 00/10-05-027-27 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 027 | |
Meridian: 4 | |
Range: 27 | |
Section: 05 | |
County/Municipality: Rocky View County | |
Well Name: EMBER ENTICE 10-5-27-27 | |
Operator Name: Ember Resources Inc. | |
License Number: 0426229 | |
License Date: 2010-11-24 | |
License Status: Issued | |
Spud Date: 2011-01-03 | |
Final Drill Date: 2011-01-22 | |
Well Total Depth: 1197.00 m | |
Surface Hole Latitude: 51.278745 | |
Surface Hole Longitude: -113.764894 |
Date | Event |
---|---|
2010-11-24 | Obtained License |
2011-01-03 | Surface Casing Operation Performed |
2011-01-22 | Finished Drilling |
2011-01-22 | Production Casing Operation Performed |
2011-01-22 | Rig Released |
2011-01-22 | Well Mode changed to Drilled and Cased |
2011-01-30 | Well Log Performed |
2011-02-24 | Perforation Treatment Performed - Jet Perforation |
2011-09-15 | Perforation Treatment Performed - Fractured |
2011-09-18 | Well Fluid changed to Gas |
2011-09-18 | Well Mode changed to Testing |
2011-09-25 | Perforation Treatment Performed - Jet Perforation |
2011-09-29 | Perforation Treatment Performed - Fractured |
2011-10-19 | Well Began Production |
2011-10-19 | Well Fluid changed to Coalbed Methane-Coals and Other |
2011-10-19 | Well Mode changed to Flowing |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2011-02-24 | Perforation | 1016.50 | 1017.50 | 13 |
2011-09-25 | Perforation | 358.50 | 359.50 | 13 |
2011-09-25 | Perforation | 413.90 | 414.40 | 13 |
2011-09-25 | Perforation | 440.80 | 441.80 | 13 |
2011-09-25 | Perforation | 478.60 | 479.10 | 13 |
2011-09-25 | Perforation | 482.70 | 483.20 | 13 |
2011-09-25 | Perforation | 527.00 | 529.00 | 13 |
2011-09-25 | Perforation | 537.50 | 539.50 | 13 |
2011-09-25 | Perforation | 555.00 | 557.00 | 13 |
2011-09-25 | Perforation | 576.00 | 578.00 | 13 |
2011-09-25 | Perforation | 606.80 | 607.30 | 13 |
2011-09-15 | Fracture | 1016.50 | 1017.50 | 0 |
2011-09-25 | Perforation | 612.20 | 612.70 | 13 |
2011-09-25 | Perforation | 617.50 | 619.50 | 13 |
2011-09-25 | Perforation | 620.90 | 621.40 | 13 |
2011-09-25 | Perforation | 623.00 | 624.00 | 13 |
2011-09-25 | Perforation | 635.60 | 636.10 | 13 |
2011-09-25 | Perforation | 687.00 | 687.50 | 13 |
2011-09-25 | Perforation | 688.20 | 689.20 | 13 |
2011-09-25 | Perforation | 690.80 | 692.30 | 13 |
2011-09-25 | Perforation | 695.00 | 698.00 | 13 |
2011-09-25 | Perforation | 713.40 | 714.90 | 13 |
2011-09-25 | Perforation | 198.50 | 200.50 | 13 |
2011-09-25 | Perforation | 715.30 | 716.30 | 13 |
2011-09-25 | Perforation | 721.40 | 721.90 | 13 |
2011-09-25 | Perforation | 753.30 | 754.30 | 13 |
2011-09-25 | Perforation | 757.90 | 758.40 | 13 |
2011-09-25 | Perforation | 769.70 | 770.70 | 13 |
2011-09-25 | Perforation | 774.60 | 775.10 | 13 |
2011-09-25 | Perforation | 775.90 | 776.40 | 13 |
2011-09-25 | Perforation | 777.10 | 778.10 | 13 |
2011-09-25 | Perforation | 786.70 | 787.70 | 13 |
2011-09-29 | Fracture | 214.00 | 787.70 | 0 |
2011-09-25 | Perforation | 214.00 | 216.50 | 13 |
2011-09-25 | Perforation | 271.00 | 273.00 | 13 |
2011-09-25 | Perforation | 336.50 | 338.50 | 13 |
2011-09-25 | Perforation | 344.90 | 345.40 | 13 |
2011-09-25 | Perforation | 347.40 | 347.90 | 13 |
2011-09-25 | Perforation | 350.30 | 350.80 | 13 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2011 | 1032 | 0.0 | 0.0 | 0.0 |
2012 | 8782 | 0.0 | 0.0 | 0.0 |
2013 | 8759 | 0.0 | 0.0 | 0.0 |
2014 | 8740 | 0.0 | 0.0 | 0.0 |
2015 | 8749 | 0.0 | 0.0 | 0.0 |
2016 | 8783 | 0.0 | 0.0 | 0.0 |
2017 | 8759 | 0.0 | 0.0 | 0.0 |
2018 | 8759 | 0.0 | 0.0 | 0.0 |
2019 | 8759 | 0.0 | 0.0 | 0.0 |
2020 | 2183 | 0.0 | 0.0 | 0.0 |
For data sources see[5]