If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0274270215000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":51.28439,"lon":-113.69385,"icon":""}]} |
| Location: 00/15-02-027-27W4/0 | |
| Location Alias: 00/15-02-27-27 W4M | |
| Location Alias 2: 00/15-02-027-27 W4/00 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 027 | |
| Meridian: 4 | |
| Range: 27 | |
| Section: 02 | |
| County/Municipality: Rocky View County | |
| Well Name: EMBER ENTICE 15-2-27-27 | |
| Operator Name: Ember Resources Inc. | |
| License Number: 0388146 | |
| License Date: 2007-12-13 | |
| License Status: Issued | |
| Spud Date: 2008-01-15 | |
| Final Drill Date: 2008-01-19 | |
| Well Total Depth: 823.00 m | |
| Surface Hole Latitude: 51.284390 | |
| Surface Hole Longitude: -113.693850 |
| Date | Event |
|---|---|
| 2007-12-13 | Obtained License |
| 2008-01-15 | Surface Casing Operation Performed |
| 2008-01-19 | Finished Drilling |
| 2008-01-19 | Production Casing Operation Performed |
| 2008-01-19 | Rig Released |
| 2008-01-19 | Well Mode changed to Drilled and Cased |
| 2008-01-26 | Well Log Performed |
| 2008-02-11 | Perforation Treatment Performed - Jet Perforation |
| 2008-02-21 | Perforation Treatment Performed - Fractured |
| 2008-02-25 | Well Fluid changed to Gas |
| 2008-02-25 | Well Mode changed to Testing |
| 2008-04-10 | Well Began Production |
| 2008-04-10 | Well Fluid changed to Gas |
| 2008-04-10 | Well Mode changed to Flowing |
| 2010-09-27 | Perforation Treatment Performed - Jet Perforation |
| 2010-10-14 | Well Structure changed to Commingled |
For data sources see[3]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
|---|---|---|---|---|
| 2008-02-11 | Perforation | 586.00 | 590.00 | 13 |
| 2010-09-27 | Perforation | 641.20 | 641.70 | 13 |
| 2010-09-27 | Perforation | 632.70 | 634.70 | 13 |
| 2010-09-27 | Perforation | 603.80 | 604.30 | 13 |
| 2010-09-27 | Perforation | 597.30 | 597.80 | 13 |
| 2010-09-27 | Perforation | 594.60 | 595.60 | 13 |
| 2010-09-27 | Perforation | 553.00 | 553.50 | 13 |
| 2010-09-27 | Perforation | 542.00 | 543.00 | 13 |
| 2010-09-27 | Perforation | 424.00 | 424.50 | 13 |
| 2010-09-27 | Perforation | 417.70 | 418.20 | 13 |
| 2010-09-27 | Perforation | 407.50 | 408.00 | 13 |
| 2008-02-21 | Fracture | 586.00 | 590.00 | 0 |
| 2010-09-27 | Perforation | 392.30 | 392.80 | 13 |
| 2010-09-27 | Perforation | 337.50 | 338.00 | 13 |
| 2010-09-27 | Perforation | 293.10 | 293.60 | 13 |
| 2010-09-27 | Perforation | 290.90 | 291.40 | 13 |
| 2010-09-27 | Perforation | 612.00 | 615.00 | 13 |
| 2010-09-27 | Perforation | 607.00 | 609.00 | 13 |
| 2010-09-27 | Perforation | 538.50 | 539.00 | 13 |
| 2010-09-27 | Perforation | 525.30 | 525.80 | 13 |
| 2010-09-27 | Perforation | 504.00 | 505.00 | 13 |
| 2010-09-27 | Perforation | 498.00 | 501.00 | 13 |
| 2010-09-27 | Perforation | 704.20 | 704.70 | 13 |
| 2010-09-27 | Perforation | 490.00 | 492.00 | 13 |
| 2010-09-27 | Perforation | 411.00 | 413.00 | 13 |
| 2010-09-27 | Perforation | 361.00 | 363.00 | 13 |
| 2010-09-27 | Perforation | 225.00 | 227.00 | 13 |
| 2010-09-27 | Perforation | 689.50 | 690.00 | 13 |
| 2010-09-27 | Perforation | 683.00 | 683.50 | 13 |
| 2010-09-27 | Perforation | 672.20 | 672.70 | 13 |
| 2010-09-27 | Perforation | 668.40 | 669.40 | 13 |
| 2010-09-27 | Perforation | 659.60 | 660.60 | 13 |
| 2010-09-27 | Perforation | 647.20 | 647.70 | 13 |
For data sources see[4]
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
|---|---|---|---|---|
| 2008 | 6408 | 0.0 | 0.0 | 0.0 |
| 2009 | 8759 | 0.0 | 0.0 | 0.0 |
| 2010 | 6025 | 0.0 | 0.0 | 0.0 |
For data sources see[5]